ML20117N160
| ML20117N160 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 08/31/1996 |
| From: | Hydrick L, Warner M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9609180383 | |
| Download: ML20117N160 (14) | |
Text
-
Pacch Dottom Atomic Powtr Station A
PECO NUCLEAR r=~c-v 1848 Lay noad A l.)MI of PLLD [MRGY
'I 4^9032 September 9,1996 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 i
Docket Nos. 50-277 and 50-278 Gentlemen:
Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of August 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, 42 %
Mark E. Warner Director, Site Engineering Peach Bottom Atomic Power Station JM MEW /JGH:lph Enclosures cc:
B.W. Gorman, Public Service Electric & Gas W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station 1
9609180393 960031 PDR ADOCK 05000277 R
PDR ccn 96-14075 fh'b,
PEACH COTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS
SUMMARY
AUGUST 1996 UNIT 2 Unit 2 capability factor for the month was 99.6%. The unit began the month in end of cycle coastdown at 62% power and averaged 57.3% power for the month.
Unit 2 Net Generation for August was 418.835 MWH.
UNIT 3 Unit 3 began the month of August at 100% power. Unit 3 Megawatt losses included a load drop for rod pattern adjustment, MSIV stroking, and SCRITS from 8/2 - 8/3. Another load drop occurred on 8/6 due to a recombiner isolation; the unit was restored to full power on 8/7. Power was then reduced on 8/10 to swap jet compressors. The Unit was returned to 100% on 8/11. The Unit remained at 100% power for the rest of the month until another load drop occurred on 8/22 for a rod pattern adjustment.
Unit 3 net generation for August was 808,555 MWH.
l l
I l
1
Attachment to Monthly Operating Report for August 1996 UNIT 2 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled Jate for next refueling shutdown:
Reload 11 scheduled for September 13,1996.
3.
Scheduled date for restart following refueling:
Restart following refueling forecast for October 12,1996.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
Yes.
If answer is yes, what, in general, will these be?
1.10CFR50 Appendix J, Option B
- 2. Increase MCPR Value 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
Items 1 and 2 have been submitted for review and approval. NRC approval has been received for item 1.
6.
Important licensing considerations associated with refueling, e g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
GE-13 Fuel Product Line will be utilized requiring a Tech Spec amendment.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assemblies,52 Fuel Rods
DoclGt No. 50-277 Attachment to Monthly Operating Report for August 1996 l
Page 2 UNIT 2 REFUELING INFORMATION (Continued) i 1
8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed stora0e capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2002 without full core offload capability.
September 1998 with full core offload capability.
n
Docket No. 50-278 Attachment to Monthly Operating Report for August 1996 UNIT 3 REFUELING INFORMATlON 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 11 scheduled for September 12,1997 3.
Scheduled date for restart following refueling Restart following refueling scheduled for October 11,1997 4.
Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?
N/A If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
6.
Important licensing considerations associated with refueling, e.g., new or different fuel desi n or 0
supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel stora0e pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool 2485 Fuel Assemblies,16 Fuel Rods 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
l
i
)
~
Docket No. 50-278 Attachment to Monthly Operating Report for August 1996 Page 2 I
UNIT 3 REFUELING INFORMATION (Continued) 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
September 1999 with full core offload capability.
)
i i
l k
i
AVERAGE DAILY POWER LEVEL DOCKET NO. 50-2TT UNIT. PEACH BOTTOM UNIT 2 DATE SEPTEMBER 9,1996 COMPANY PECO ENERGY CCMPANY L P. HYDRCK BUSINESS SERVICES SITE SUPPORT DIVHSION PEACH BOTTOM ATOMIC POWER STATION
.. i TELEPMUNE (717)di6-4363 MONTH AUGUST,1996 1
DAY AVERAGE DAILY POWER LEVEL LAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 622 17 573 2
622 is 563 3
610 19 556 4
610 20 553 l
5 598 21 540 6
M N
W 7
567 23 536 6
578 24 531 9
573 25 532 to 577 26 524 11 576 27 526 12 561 26 516 13 563 29 516 14 573 30 511 1
15 569 31 507 16 560 l
l t
t
~..
... = _ _
m
- _.. = _,
AVERAGE DAILY POWER LEVEL DOCKETNO. 50-278 UNIT PEACH BOTTOM UNIT 3 DATE SEPTEMBER 9.1998 COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT OMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)4564383 MONTH AUGUST,1998 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1111 17 1103 2
1033 18 1113 r
3 956 19 1105 4
1111 20 1108 i
5 1110 21 1104 i
6 1088 22 1092 7
1094 23 1099 8
1110 24 1094 9
1108 25 1102 10 885 26 1101 11 1087 27 1098 12 1103 28 1093 13 1109 29 1097 l
14 1107 30 1097 15 1103 31 1097 16 1094
OPERATING DATA REPORT DOCKET NO. 50 - 277 DATE SEPTEMBER 9,1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS
- 1. UNIT NAME:
PEACH BOTTOM UNirj2 NOTES:
- 2. REPORTING PERIOD:
AUGUST,_1,996
- 3. LICENSED THERMAL POWER (MWT) 3458
- 4. NAMEPLATE RATING (GROSS MWE):
1221
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1.119
- 6. MAXtMUM DEPENDABLE CAPACITY (GROSS MWE):
1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1093 j
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GNE REASONS:
9 POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 744 5,855 194.255
- 12. NUMBER OF HOUhS REACTOR WAS CRITICAL 744.0 5,855 0 128,450.5
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. ' OURS GENERATOR ON-LINE 744.0 5,855.0 124,456 2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16 GROSS THERMAL ENERGY GENERATED (MWH) 1,473,646 17,103.202 374,761,245
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 443,600 5,568,400 123,108,190
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 418,836 5,373,461 118,179,357 PAGE 1 OF 2
m.
t OPERATING DATA REPORT (CONTINUED)
DOCiewO.
50-2Tr j
DATE SEPTEMBER 9,1998 THIS MONTH YR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 %
100.0 %
64.1 %
- 20. UNIT AVAILAB4UTY FACTOR 100.0 %
100.0 %
64.1 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 51.5 %
84.0 %
57.6 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 50.3 %
82.0 %
SS.7 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
.0 %
11.8 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH)-
RefusEng endage schedule to begin af13516, Duramon 29 days
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTLP.
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED INITIAL CRITICAUTY 09/16f73 INITIAL ELECTRICITY 02/18T14 COSAAERCIAL OPERATION 07/05/74 t
t-7 p
I i
4 L
l PAGE 2 OF 2 b
n n.
OPERATING DATA REPORT DOCKET NO. 50 - 278 DATE SEPTEMBER 9,1998 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DMS80N PEACH BOTTOM ATOMIC POWER STATX)N TELEPHONE (717)456 4353 OPERATING STATUS
- 1. UNIT NAME.
PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERIOD:
AUGUST,1996
- 3. LICENSED THERMAL POWER (MWT) 345_6
- 4. NAMEPLATE RATING (GROSS MWE):
1221
- 5. DESIGN ELECTRICAL RATING (NET MWE):
ti19
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY(NET MWE):
- 10. REASONS FOR RESTRICTIONS,IF ANY:
THIS MONTH YR-TO DATE CUMULATNE
- 11. HOURS IN REPORTING PERIOD 744 5,855 190,151 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 7K0 5,796.1 127,053.3
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 j
- 14. HOURS GENERATOR ON-LINE 744.0 5,819 8.0 123,506.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 00 i
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,534,729 19,259,501 388.945,959
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 833,000 6,356,900 120,976,332
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 808,556 6,176,164 116,190,016 PAGE 1 OF 2 1
. - - _,_.__ _ _ i'
m
._m e
OPERATING DATA REPORT (CONTINUED)
DOCeET NO.
50- 275 DATE SEPTDeER 9,1998 THIS MONTH YR-TO-DATE CUMLAATIVE
- 19. UNIT SERVICE FACTOR 100.0 %
97.3 %
05.0 %
- 20. UNIT AVAILABluTY FACTOR 100.0 %
97.3 %
85.0 %
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 99.4 %
96.5 %
58.8 %
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.1 %
94.3 %
57.2 %
- 23. UNIT FORCED OUTAGE RATE
.0 %
2.7 %
10.7 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOO, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED I
INITIAL CRITICAUTY 0907/74 INITIAL ELECTRICITY 0001/14 COMMERCIAL OPERATION 12I23/74 F
5 PAGE 2 OF 2 L
m---
u
+*-
w**w~
-W m,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO. 50-277 UNIT NAME PEACH BOTTOM UNIT 2 DATE SEPTEMBER 9,1996 COMPLETED BY PECO ENERGY COMPANY L P.MYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH AUGUST.1995 TELEPHONE (717)464383 METHOO OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTNE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE TOTAL HOURS (1)
(2)
(3)
(4)
F-FORCED REASON METHOO EXHIBIT G-INSTRUCTIONS S-SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 8-MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG4161)
E-OPERATOR TRAINING + UCENSE EXAMINATION F-ADMINISTRATNE (5)
G - OPERATIONAL ERROR (EXPLAIN)
EXHIBITI-SAME SOURCE H -OTHER (EXPLAIN)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-118 UNIT NAME PEACH BOTTOM UNIT 3 DATE SEPTEMBER 9,1996 COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISON PEACH BOTTOM ATOIAC POWER STATION REPORT MONTH AUGUST,1996 TELEPHONE (717)4564383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.
DATE (1)
(HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PREVENT RECURRENCE 18 960006 F
H 4
HC RECOMB-Recomtuner %
Reactor not shut doom 19 900810 S
H 4
HC RECOMB Swap jet compressors Reactor not shut down e
TOTAL HOURS (1)
(2)
(3)
(4)
F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S-SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B -MAINTENANCE OR TEST 2-MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3-AUTOMATIC SCRAM EVENT REPORT (LER)
D-REGULATORY RESTRICTION 4-OTHER (EXPLAIN)
FILE (NUREG4161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMfNISTRATIVE (5)
G -OPERATIONAL ERROR (EXPLAIN)
EXHIBITI-SAME SOURCE H - OTHER (EXPLAIN)