ML20095G938

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1995 for PBAPS Units 2 & 3
ML20095G938
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/30/1995
From: Hydrick L, Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9512220031
Download: ML20095G938 (14)


Text

. . . . . . . . -- . _ - _ . . - . . . - ~ ~ . .. - - _.___ . _ . .. -

Peach Bottom Atomic Pow $r Statlin

. v PECO ENERGY n ? l a ' * *""

Delta. PA 17314.9739 717 456 7014 December 15,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of November 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely,

. }/w',

Gerald R. Rainey Vice President, Peach Bo om Atomic Power Station l

P# 4J68 GRR/TNM/JGH:lph i

enclosures cc: R.A. Burricelli, Public Service Electric & Gas l W.P. Dornsife, Commonwealth of Pennsylvania l R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Light INPO Records Center l

230037 I

ccn 9514108 9512220031 951130 e

fI g PDR ADOCK 05000277 R.. ._ .

PDR

. . - . . _ . . . ~ - _ - . - . . - _ - . - - . - -- . - _ - . __ - -- .

. PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

November 1995 UNIT 2 Unit 2 began the month of November at approximately 95% power. Operation remained at this level until an evaluation allowed power to be raised to 100% midday on November 7. On November 10, power was reduced 600MW for a rod pattem adjustment. On November 11, while increasing power from the rod pattern adjustment, power was held at approximately 750MW to troubleshoot vibration of the "A" reactor feed pump. Unit power returned to 100% and was subsequently reduced to 95%

on November 20 to reduce vibration on the "A" reactor feed pump. Power remained at 95% for the rest of the month.

l l

UNIT @

Unit 3 began the month of November at 100% power. Unit 3 operated at that level until November 6 when a drop in power was experienced during 13 KV bus troubleshooting. Power was retumed l to 100% the same day and remained at that level for the rest of the month.

l l

l l

l l

_ . - . . - _. . - . _ ~ . , _ - . . - - _ - . - - - - - -

j Attachmant to

  • Monthly Operatir'1g .

Report for November 1995 I

l l

UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2 1

2. Scheduled date for next refueling shutdown:

l Reload 11 scheduled for September 15,1996.

)

3. Scheduled date for restart following refueling:

Restart following refueling forecast for October 20,1996.

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting Information:

N/A

! 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, now operating procedures:

N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Coro 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods

_. .. . _ . _ _ . . _ . _ _ _ _ _ _ . _ ~ . _ _ . _ _ . _ _ _ _ _ _ . _ - _ _ . . _ . _ _ . _ . _ - . _ _ _ _ . _ _ . _ _ _ _ . . . _ _ _

t Dockst No. 50 277

' Attachment to Monthly Operating Report for November 1995 Page 2 UNIT 2 REFUELING INFORMATION (Continued)

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2004 without full core offload capability.

September 1998 with full core offload capability.

l

-y . - , , ,,, ,.g-. , e -

1 Docket No. 50-278

  • Attachmtnt to .

Monthly Operating Report for November 1995' UNIT 3 REFUELING INFORMATION

- 1. Name of facility:

Peach Bottom Unit 3 ,

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 15,1997

3. Scheduled date for restart following refueling Restart following refueling scheduled for October 20,1997
4. Will refueling or resumption of operation thereafter require a technical specification change or other -

license amendment?

N/A If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting infarmation:
6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) In the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool 2201 Fuel Assemblies,6 Fuel Rods
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

l l

\

, i

  • Docket No. 50-278 Attachm:nt to Monthly Operat!ng Report for November 'i995 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability.

b i .

y .

l 1

6VERAGE DGIC# UNI? POWER LEVEL DOCKET NO. 50 - 277 - .

UNIT PEACH 80TTOM UNIT'2 . 't DATE DECEM8ER 15.1995 *

.p COMPANY PECO ENERGY COMPANY  !

L. P. HYDRICK ,

8USINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION t TELEPHONE (717) 456-4383 5 MONTH NOVEM8ER 1995 DAY AVERAGE DAILY POWER LEVEL DAY -AVERAGE DAILY PdWER LEVEL (MWE-NET) (MWE_ NET) 1 1039 17 1107 f.

2 1041 18 1094 3 1029 19 1107 i I

4 1046 20 1062 i l

5 1041 21 1042 - -

t 6 1037 22 1042 7 1058 23 1050 8 1094 24 1042 I 9 1085 25 1042 '

10 1065 26 1038 >

, 11 789 27 1042 l i '

12 985 28 1034

(

13 1101 29. 1041 14 1096 30 1034 15 1097 .

1S 1098 3  ;

t

-h' i

i

. . - . - ~

l I

i l

AVEROGE DAILV UNIV-POCER LEVEL i

DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3

j. _________._ ______...__ . _

DATE DECEMBER 15.1995

. COMPANY PECO ENERGY COMPANY L. P. HYDRICK

(

BUSINESS SERVICES SITE SUPPORT DIVISION

] PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 i MONTH NOVEh2ER 1995 3

DAY AVERAGE DAILY POWER LEV;L DAY AVERAGE DAILY POWER LEVEL (MwE-NET) (MwE-NET) 1 1117 17 1131 2 1099 18 1114 3 1113 19 1126 4 1112 20 1110 5 1125 21 1119

)

6 932 22 1118 l

. 7 1084 23 1126 8 1119 24 1122 9 1115 25 1122 l_ 10 1112 26 1118 11 1125 27 1122 i 12 1109 28 '1114 13 1120 29 1126 4

14 1124 30 1118 15 1120 16 1121

  • a O

e 4

m 9 d

4

_._._.____.____________m__ _ _ _ _

- - -m- - - + . - -me.- - - - s ~ ,

  1. , ( = - s--s a. s .m.

. J'-

OPERQTING DOTA REPORT DOCKET NO. 50 - 277 .

DATE DECEMBER 15.1995- .

COMPLETED BY PECO COMPANY


__'NERGY_

}

L. P. HYDRICK .

BU5INESS SERVICES  !

SITE SUPPORT DIVISION i PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 OPERATING STATUS

.-_ .__---..._.. - . . . . - - . . _ - - _ - _ _ _ -- -_.-__.- I 1 UNIT NAME: PEACH BOTTOM UNIT 2 NOTES: *

~ ~~~~~~~~~~~~

2. REPORTING PERI 66: AOVEMBER. i995 a _.--- _.------ _ -__
3. LICENSED THERMAL POWER (MWT): 3458 4 NAMEPLATE RATING (GROSS MWE): 1221
5. DESIGN ELECTRICAL RATING (NET MWE): 1119
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWk):'.1159 --- t
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093

.i

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS-NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):  ;

1 i i 4

10. REASONS FOR RESTRICTIONS. IF ANY: j t

THIS MONTH VR-TO-DATE CUMULATIVE I i

. 11. HOURS IN REPORTING PERIOD 720 8.016 187.656

12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 8.016.0 121.979.1

-- _..... ---__......_ ..= .--

. 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 a

[

' t 14 HOURS GENERATOR ON-LINE 720.0 8.016.0 118.019.2 I j

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

_-_........_ ._____-- - - _-- --__.... l

16. GROSS THERMAL ENERGY GENERATED (MWH) 2.382.922 27.329.402 355.650.285 i
17. cOSS ELECTRICAL ENERGY GENERATED (MWH) 778.100 s

'9.022.400 116.901.790 t

18. NET ELECTRICAL ENERGY GENERATED (MWH) 755.502 8.743.645 112.186.101 t ..-_ -_.. _...-_-_.--- --_ ...._...

I PAGE 1 0F 2  !

-k L

I i

__m . _____._m_____.__ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ . _ . _ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ m __ _ . _ _ _ ._ _ _ _ _ _ _ _ _ _ __

OPERQTING DQTQ REPORT (CONVINUED) DOCKET NO. 30 ,277 .;

f s

DATE DECEMBER 15.1995 t THIS MONTH VR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 62.9 ~!
20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.9  !

-___.____-_. ____...-_--- ._----.. =

21. UNIT CAPACITY FACTOR (USING MDC NET) 96.0 99.8 56.7
22. UNIT CAPACITY' FACTOR (USING DER NET) 93.8 97.5 55.9
23. UNIT FORCED GUTAGE RATE OO OO 23 ,

24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE 08 STARTUP: N/A i

-fr

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPEAATION): -FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 .

INITIAL ELECTRICITY -02/18/74 COMMERCIAL OPERATION -07/05/74 i i

?

I v

r i

i P

PAGE 2 OF 2 l t

e - i f

k

. .. ! I

m _ _ _ - . _ mm._-m._.._m.. m...m_- ._m . _ . _.__..m.__m- - _ . .._.. m..____..

m.
  • L t

OPERATING DATO REPOR7

= f k'

OOCKET NO 40 - 27S

__.. _=_ __

.. g DATE DECEM8ER 15.1995

  • t i

COMPLETED BY PECO ENERGY COMPANY ,

l L. P. HYDRICM _}

BUSINESS SERVICES I SITE. SUPPORT DIVISION j PEACH BOTTOM ATOMIC POWER STATION

' TELEPHONE (717) -[

3

...___456-4383_. _ ......__....___.__

I OPERATING STATUS  ;

1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:

._-_-__._____......._-_...-___.....  ?

2. REPORTING PERIOD: NOVEMBER, 1995 t
3. LICENSED THERMAL POWER (MWT): 3458 p
4. NAMEPLATE RATING (GROSS MWE): 1221

_- _- _---..... t t

5. DESIGN ELECTRICAL RATING (NET MWE): 1119
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159 ,

i

7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093 l i
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:  ;

THIS MONTH YR-TO-DATE CUMULATIVE I

11. HOURS IN REPORTING PERIOD 720 8.016 183.552 l i
12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 7.298.5 120.557.9 6

.... __ ..... p

13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 '

14 HOURS GENERATOR ON-LINE 720.0 7.284.0 117.163.2

_.._....__.. _. -___.___ a.. ..._---. *

'5. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0

== ____ ..._--...___ _........._. I

16. GROSS THERMAL ENERGY GENERATCD (MWH) 2.471.160 20.968.885' 347.542.828

______ ____.....-_. __. _ ..... I

17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 821.900 6.759.500 113.905.532
18. NET ELECTRICAL ENERGY GENERATED (MWH) 800.042 6.478.200 109.319.559 PAGE 1 OF 2 i s

. ._.m. ____.__..___._.1 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ - _ - _ mm- - . - __ .e _ _ _

t OPERQTING DQTA CEPORT (CONTINUED)- DOCCIET NO. 50 - 278 ,[

ls r

DATE DECEMBER 15.1995 I

__..__________.______________ .i THIS MONTH VR-TO-DATE CUMULATIVE I t

19. UNIT SERVICE FACTOR 100.0 90.9 63.8

) 20. UNIT AVAILABILITY FACTOR 100.0 90.9 63.8  ;

21 UNIT CAPACITY FACTOR (USING MDC NET) 101.7 77.4 57.5 t

_..__ ____ ____________ ...___ t l 22. UNIT CAPACITY FACTOR (USING DER NET) 99.3 75.3 55.9 +

l 23. UNIT FORCED OUTAGE RATE O.0 2.0 11.0 -

l _.__..______ ____________. _ . _ - _ . - - - _ _

24 SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH):

4

25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):~ FORECAST ACHIEVED I INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74
  • COMMERCIAL OPERATION 12/23/74 i

t i

I t

PAGE 2 OF 2 e 3

  • T b

.)

4 1

4 as .

A

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 2T7 UNIT NAME PEACH BOTTOM UNIT 2

= _ - _ - - - - - - - _ _ _ - - - - - - . . . . . . - - - - .

DATE DECEMBER 15.1995 REPORT MONTH NOVEMBER. 1995 COMPLETED BY PECO. ENERGY COMPANY L. P. HYDRICK' BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383


....---.. ---------------------------- ---------------~~--------------- ------........---- ..--... - -___. .

METHOD OF LICENSEE SYSTEM COMPONENT ~ CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1)) (HOURS) (2) REACTOR (3) l REPORT * (4) (5) PREVENT RECURRENCE 13 951111 F 11.0 H 4 CM PUMPEX REACTOR FEED PUMP VIBRATION REACTOR NOT SHUT DOWN 11.0 4

(1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - F.OUIPMENT FAILURE (EXPLAIN) 1 - MANUAL- FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ' ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION .4 - OTHER'(EXPLAIN) FILE (NUREG-0161)

J E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H- OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE 9

_ _ _ _ _ . . _ . . _ . . _ - - . _ . _ - _ - - - - . _ _ _ _ _ - _ _ - _ _ - - _ - - - . - _ _ _ _ _ _ _ _ _ _ _ ~ _ _ _ - _ _ _ _ _ _ _ _ - _ . _ _ _ _ _ , _ _ . _ _ _ . _ _ - . . - _ - _ _ _ . _ _ _ _ . _ _ _ _ . _ . _ - - _ _ . _ . _ _ . _

_ . . -m . m _ .. ._m I

b 4

I

! UNIT SHUTDOWNS AND POWER. REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 ,

l DA?2 DECEMBER 15.1995 REPORT MONTH NOVEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY '

L. P. HYDRICK BUSINESS SERVICES f SITE SUPPORT DIVISION {

PEACH EOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383

____.._____________.._..___________- - _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . - =____..__..._._.-______ y i

) i

, METHOD OF -LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE l TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO I

NO.1 DATE (1) (HOURS) (2) REACTOR (3) REPORT a (4) l (5) PREVENT RECURRENCE. '
________________________________. = --

.______________ .__________- ______ .____..____. t

! 14 951106 F 9.0 H 4 EB INSTRU 13 KV BUS TROUBLESHOOTING.

REACTOR NOT SHUT DOWN I

4 l

I l 9.0 l

(1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST ~ 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE l C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

I D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NOREG-0161) '

l E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EAPLAIN)

H- OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE ,

i e

5 4

&e. I 4 I i

. t l

r t

i . . ,

I

. . . - ~ - _ __.