, Gerald *u Rainey e '

Vice Pres & dent l _

Peach Bottom Atomic Power station PECO ENERGY ecco c e ov cema ev RD 1. Box 208 Delta. PA 17314-9739 717 456 7014 September 11,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of August 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, i

erald R. alney Vice President, Peach B ttom Atomic Power Station t M b JOS GRR/AJ /GHG/TNM/JGH:wjj enclosures cc: R.A. Burricelli, Public Sertice Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania .

R.I. McLean, State of Maryland l

T.T. Martin, Administrator, Region I, USNRC 1 W.L Schmidt, USNRC, Senior Resident inspector l H.C. Schwemm, Atlantic Electric I A.F. Kirby,111, Delmarva Power & Ught INPO Records Center l

i l

l l

15012-ccn 95-14078 9509190235 950831 -

PDR ADOCK 05000277 i R _ PDR

PEAC6 SOTTOM ATOMIC POWER STATION -

, NRC mot.'THLY OPERATIONS

SUMMARY

, , AUGUST 1995 UNIT 2 l

Unit 2 began tha month of August at 100% nominal power. Power was reduced on August 11th to l perform M/G 6et mainterrnce and scram time testing. The unit was returned to 100% nominal power on August 14th and operated at that power level for remainder of the month.

UNIT 3 Unit 3 began the month of August recovering from an automatic scram which occured in July. The unit was returned to approximately 70% power on August Ord in the end of fuel cycle coastdown mode. Power was reduced on the 25th due to a CV problem. The unit returned to power in the end of fuel cycle coastdown mode on August 26th and operated in that mode for the remainder of the month.

t 4

4 d

j 4

l j

s

, .' Attachm@nt to -

Monthly Operating

', . Report for August 1995 UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 20,1996.

3. Scheduled date for restart following refueling:

Restart following refueling forecast for November 2,1996.

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) in the core and (b) In the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods l

1

.. '. l

, Docket No. 50-277 -

, Attachm:nt to Monthly Operating  ;

Report for August 1995 Page 2 UNIT 2 REFUELING INFORMATION (Continued)

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2004 without full core offload capability.

September 1998 with full core offload capability.

l 1

1

- - _ _ ._. = - _ -

r

  • Docket No. 50-278 .

Attachm:nt to

. Monthly Operating Report for August 1995 UNIT 3 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

Reload 10 scheduled for September 22,1995

3. Scheduled date for restart following refueling Restart following refueling scheduled for October 27,1995
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes j If answer is yes, what, in general, will these be?

93-18 SRM/lRM Improvements

5. Scheduled date(s) for submitting proposed licensing action and supporting information:

93-18 Submitted 1/17/95

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or 4

supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A 7, The number of fuel assemblies (a) in the core and (b) In the spent fuel storage pool:

1 (a) Core - 764 Fuel Assemblies (b) Fuel Pool 2201 Fuel Assemblies,6 Fuel Rods J l

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies: '

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

'., . Docket No. 50-278 .

Attachment to

. Monthly Operating Report for August 1995 Page 2 UNIT 3 REFUELING INFORMATION (Continued) i 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the j present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability.

t 1

i i

I I

n

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 277 UNIT PEACH 80TTOM UNIT 2 DATE $EPTEM8ER 11,1995 COMPANY PECO ENERGY COMPANY W. J. JEffREY PERFORMANCE AND RELIABILITY

$11E ENGINEERING PEACH BOTTON ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 MONTH AUGUST 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE NET) (MWE NET) 1 1083 17 1074 2 1078 18 1078 3 1083 19 1078 4 1084 20 1082 5 1079 21 1082 6 1083 22 1078 7 1082 23 1083 8 1082 24 1082 9 1087 25 1084 10 1082 26 1085 l 1

11 1070 27 1085 12 5 73 28 1089 13 728 29 1085 14 991 30 , 1085 15 1074 31 1085 16 1078 f

j. .., , .

l AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO. 50 278 UNIT PEACH BOTTOM UNIT 3 i DATE SEPTEM8ER 11,1995 A COMPANY PECO ENERGY COMPANY q .............................

4 W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH SOTTOM ATOMIC POWER STATION

$ TELEPHONE (717) 456 7014 EXT. 4027 1

1 MONTH AUGUST 1995 i DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE NET) (MWE NET)

1 0 17 610 2 183 18 614 i

3 609 19 610

.i.

! 4 640 20 610 4

! 5 644 21 607 1

j 6 639 22 603 1

7 638 23 600 8 639 24 599 i

l 9 635 25 322 10 634 26 584 1

11 630 27 585

, 12 622 28 581

! 13 622 29 585 I

14 621 30 5 77 1

15 625 31 576 l 16 626 i

I 1

I o

i a

3 E

t i

l 1

OPERATING DATA REPORT DOCKET NO. 50 - 277 I

DATE SEPTEMBER 11,1995

............................. l COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STAil0N TELEPHONE (717) 456 7014 EXT. 4027 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
2. REPORTING PERIOD: AUGUST, 1995
3. LICENSED THERMAL POWER (MWT): 3458
4. NAMEPLATE RATING (CROS$ MWE): 1221
5. DESIGN ELECTRICAL RATING (NET MWE): 1119
6. MAXIMUN DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUM8ER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

Item #5 added since last report. Change d;e to power rerate.

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THl3 MONTH YR-70-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,831 185,471
12. NUMBER LF HOURS REACTOR WAS CRITICAL 744.0 5,831.0 119,794.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON LINE 744.0 5,831.0 115,834.2
15. UNIT RESERVE SHUT 00WN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,505,456 19,899,259 348,220,142
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 812,800 6,588,400 114,467,790
18. NET ELECTRICAL ENERGY GENERATED (MWM) 781,700 6,387,667 109,830,123 PAGE 1 0F 2 4

l 1

l l

l l

I l

)

i

OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50 - 277 j DATE SEPTEM8ER 11,1995 l THl3 MONTH YR-To-DATE CUMULATIVE 1

i 19. UNIT SERVICE FACTOR 100.0 100.0 62.5

20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.5 l 21. UNIT CAPACITY FACTOR (U$ LNG MDC NET) 96.1 100.2 56.2
22. UNIT CAPACITY FACTOR (USING DER NET) DER RATING TBD
23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.5
24. SHUTDOWNS SCHEDULED CVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACN):
25. IF SHUTDOWN AT END OF REPORT PERIDO, ESTIMATED DATE OF STARTUP: N/A j
26. UNITS IN TEST STATUS (PRIOR 70 COMMERCIAL OPERATION): FORECAST ACHIEVED j INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 J

COMMERCIAL OPERATION 07/05/74 1 ......... ........

s 4

J 4

4 4

PAGE 2 0F 2 T

4 1

i s

1. _

v

.c .

. . l OPERATING DATA REPORT i

DOCKET No. 50 - 278 DATE SEPTEM8ER 11,1995 J COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH 80TTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 CPERATING STATUS

1. UNIT NAME: PEACH 80TTCM UNIT 3 NOTES:
2. REPORTING PERIOD: AUGUST, 1995
3. LICENSED THERMAL POWER (MWT): 3293
4. NAMEPLATE RATING (GROSS MWE): 1152
5. DESIGN ELECTRICAL RATING (NET MWE): 1065

] 6. MAXIMUM DEPENDA8LE CAPACITY (GROSS MWE): 1096

, 7. MAXIMUM DEPENDA8tE CAPACITY (NET MWE): 1035

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) $1NCE LAST REPORT, GIVE REASONS:

t 4

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO DATE CUMULATIVE

11. HOURS IN REPORTING PERico 744 5,831 181,367
12. NUMBER OF HOURS REACTCR WAS CRITICAL 717.0 5,693.5 118,952.9
13. REACTOR RESERVE SHUTOOWN HOURS bb bb bb

, 14. HOURS GENERATOR ON LINE 717.0 5,679.0 115,558.2

15. UNIT RESERVE SHUTOOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,525,553 16,481,432 343,055,375
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 454,400 5,300,700 112,446,732
18. NET ELECTRICAL ENERGY GENERATED (MWH) 423,621 5,078,884 107,920,243 PAGE 1 0F 2 4

- . . . . ~ . . . - = . . _ .- .-. .. - - . . . . . = - - . . ~ .

.i. .

4

  • e . . .

B OPERATING DATA REPORT (CONilhuED) DOCKET No. 50 - 278 DATE SEPTEM8ER 11,1995 THIS MONTH YR-To-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 96.4 97.4 63.7
20. UNIT AVAILABILITY FACTOR  %.4 97.4 63.7
21. UNIT CAPACITY FACTOR (USING MOC NET) 55.0 84.2 57.5
22. UN! CAPACITY FACTOR (USING DER NET) 53.5 81.8 55.9
23. UNIT FORCED OUTAGE RATE 3.6 2.6 11.2
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERICO, ESilMATED DATE OF STARTUP: 10/20/95
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERAfl0N): FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 I

i PAGE 2 0F 2 i

l i

- ~. - - , .. . -. , -

e t .

4 9

1 1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 277 4

UNIT NAME PEACH BOTTOM UNIT 2 j .............................

DATE SEPTEM8ER 11,1995 REPORT MONTH AUGUST, 1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 l METHOD OF , LICENSEE SYSTEM COMPONENT ' CAUSE AND CORRECTIVE TYPE SHUTTING DOWN ' EVENT CODE CODE ACTION TO DURATIONjREASON No. DATE (1) : (HOURS), (2) REACTOR (3) REPORT f (4) (5) PREVENT RECURRENCE 11 950811 F 66.0 N 4 HC GENERA MG SET MAINTENANCE. REACTOR NOT SHUTDOWN.

12 950816 F 3.0 H 4 RC CONR00 R00 PATTERN ADJUSTMENT. REACTOR NOTSHUTDOWN.

l 69.0 (1) (2) (3) (4)

' F - FORCED REASON METH00 EXHIBli G INSTRUCTION $

$ SCHEDULED A EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

, D REGULATORY RESTRICTION 4 OTHER (EXPLAIN) FILE (NUREG 0161)

E CPERATOR TRA!NING + LICENSE EXANINATION F ADMINISTRATIVE (5) ,

G OPERATIONAL ERROR (EXPLAIN) j H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE l l

l l

l l

l 1

- ..._. - . . -- ._ . . .. ~.

0 -

a UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET No. 50 - 278 UNIT NAME PEACH SOTTOM UNIT 3 DATE SEPTEMBER 11,1995 REPORT MONTH AUGUST, 1995 COMPLETEDBYPhCbhNhkbhbhkNh W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINE 2 RING PEACH BOTTOM ATCMIC POWER STATIT.e TELEPHONE (717) 456 7014 EXT. 4027 l NETH00 0F LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE ' DURATION REASON SHUTTING DOWN EVENT CODE C00E ACTION TO NO. .DATE (1) : (HOURS). (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 11 950801 F 27.0 A 3 NC VALVEX FEEDWATER TRANSIENT. HIGH REACTOR LEV!L SCRAM J

12 950825 F 22.0 H 4 NC VALVEX TURBINE CONTROL VALVE CLOSURE. REACTOR NOT SHUTDOWN J

1

'd9h 1

i i (1) (2) (3) (4) 1 F FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS

$ SCHEDULED l A EQUIPMENT FAILURE (EXPLAIN) 1

  • MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE ,

C REFUELING 3 AUTOMATIC SCRAM. EVENT REPORT (LER) 0 REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG 0161)

E OPERATOR TRAINING + LICENSE EXAMINATION F ADMINISTRATIVE (5)