ML20093G357

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1995 for PBAPS Units 1 & 2
ML20093G357
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 09/30/1995
From: Jeffrey W, Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9510190031
Download: ML20093G357 (14)


Text

...

GereW R. Rainey Vics PrIsidInt Petch Bottom Atomic Power Station 4

v PECO ENERGY ecco ee,ov ce-Peev RD 1. Box 208 Delta, PA 17314-9739 717 456 7014 October 10,1995 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20556

.cocket Nos. 50-277 and 50-278 Gentlemen:

y Enclosed are twelve copies of the monthly opera:Ing report for Peach Bottom Units 2 and 3 for the month of September 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Golde 101. Revision 4.

Sincerely, A

/

l

/o a

Gerald R. Rainey Vice President, Peach Bottom Atomic Power Station GRR/

/JGH:wjj enclosures cc.

R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania i

R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident inspector l

H.C. Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Ught INPO Records Center i

t 170130 con 95-14078 9510190031 950930'

/ $h![

7 PDR ADOCK 05000277

/

rA

.R.

.PDR

,I

PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY OPERATIONS

SUMMARY

SEPTEMBER 1995 UNIT 2 Unit 2 began the month of September at 100% nominal power and operated at that power level for the entire month.

Mi"I.2 Unit 3 began the month of September in the end of fuel cycle coastdown mode. Power was reduced on the 19th due to a Recirc Pump trip. The unit retumed to power in the end of fuel cycle coastdown mode later the same day and operated in that mode until September 22nd when the unit was shutdown for the tenth refueling outage.

A 4

4 4

4 4

e 4

4

Attachment to Monthly Operating Report for September 1995 UNIT 2 REFUELING INFORMATION 1.

Name of faculty:

Peach P h.t'M ?

2.

Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 20,1996.

3.

Scheduled date for restart following refueling:

Restart following refueling forecast for November 2,1996.

4.

WHI refueling or resumption of operation therefore require a technical specification change or other license amendment?

N/A If answer is yes, what, in general, will these be?

)

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

N/A 6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

N/A 7.

. The number of fud AMemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2436 Fuel Assemblies, 59 Fuel Rods 4

f h

Docket No. 50-277 Attachment to Monthly Operating Report for September 1995 Page 2 I

UNIT 2 REFUELING INFORMAT!ON (Continued) 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

1 September 2004 without full core offload capability.

September 1998 with full core offload capability.

i a

J 4

9 y

4

+

Docket No. 50-278 Attachment to Monthly Operating Report for September 1995 UNIT 3 REFUELING INFORMATION 1.

Name of facility:

Peach Cottom Unit 3 2.

Scheduled date for next refueling shutdown:

Reload 10 scheduled for September 22,1995 3.

Scheduled date for restart following refueling Restatt following refueling scheduled for October 27,1995 4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

N/A i

If answer is yes, what, in general, will these be?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, j

new operating procedures:

N/A 7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core 764 Fuel Assemblies (b) Fuel Pool 2201 Fuel Assemblies,6 Fuel Rods 8.

The present licensed spent fuel pooi storage capacity and th9 size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

f

Docket No. 50-278 Attachment to Monthly Operating Report for September 1995 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capability.

September 1999 with full core offload capability, i

i

?

1 J

1 l

2 i

.___.m s..*

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50 277 UNIT PEACH BOTTOM UNIT 2 l

DATE OCTOBER 10,1995 COMPANY PECO ENERGY COMPANY W. J. JEFFREY 1

l PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT 4027 MONTH SEPTEMBER 1995 DAY AVERAGE DA!LY POWER LEVEL' DAY AVERAGE DAILY POWER LEVEL

]

(MWE-NET)

(MWE NET) 1 1089 17 1090 2

1085 18 1102 i

2 3

1085 19 1094 1

i 4

1093 20 1098 l

1 l

5 1081 21 1098 i

6 1093 22 1097

)

7 1085 23 1100

?

8 1089 24 1105 9

1089 25 1100 10 1089 26 1107 11 1089 27 1103 1

12 1093 28 1096 e

13 1093 29 1103 14 1093 30 1100 i

15 1098 l

16 1090 s

6 i

(

l y.

.m

I

\\

i AVERAGE DA!LY UNIT POWER LEVEL l

DOCKET No. 50 - 278 DNIT PEACH BOTTOM UNIT 3

..................,.,,r......

DATE OCTOBER 10,1995 COMPANY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY

$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 MONTH SEPTEMBER 1995 DAY AVERAGE DA!LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 573 17 540 2

5 77 18 540 3

5 73 19 455 4

5 72 20 532 5

569 21 536 6

564 22 384 7

564 23 0

8 560 24 0

9 556 25 0

10 556 26 0

11 552 27 0

4 12 548 28 0

13 556 29 0

14 548 30 0

15 548 16 540 i

. ~. _

--- -.=

OPERATING DATA REPORT DOCKET NO. 50 277 DATE OCTOBER 10,1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE ANO RELIA 8ILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
2. REPORTING PERIOD: SEPTEM8ER, 1995
3. LICENSED THERMAL POWER (MWT):

3458

4. NAMEPLATE RATING (GROSS MWE):

1221

5. DESIGN ELECTRICAL RATING (NET MWE):

1119

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1093

8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIDO 720 6,551 186,191
12. NUM8ER OF HOURS REACTOR WAS CRITICAL 720.0 6,551.0 120,514.1
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 720.0 6,551.0 116,554.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,500,411 22,399,670 350,720,553 i
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 816,200 7,404,600 115,283,990
18. NET ELECTRICAL ENERGY GENERATED (MWH) 7;B7,889 7,175,556 110,618,012 PAGE 1 0F 2 1

1

. -.. - _. - ~ -.

~

OPERATING DATA REPORT (CONTINUED)

DOCKET NO. 50 277 DATE DCTOBER 10,1995 THIS MONTH YR TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 62.6 l
20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 100.1 100.2 56.4
22. UNIT CAPACITY FACTOR (USING DER NET).

97.8 -

97.9 55.6

23. UNIT' FORCED OUTAGE RATE 0.0 0.0 12.5
24. SHUTDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

1

]

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED

!NITIAL CRITICALITY 09/16/73 i

INITIAL ELECTRICITY 02/18/74 COMMERCIAL OPERATION 07/05/74 PAGE 2 OF 2 I

i l

s I

i

l i

l t

a OPERATING DATA REPORT DOCKET No. 50 278 DATE OCTOBER 10,1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING i

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027

]

OPERATikG STATUS J

1. UNIT hiME: PEACH BOTTOM UNIT 3 NOTES:

+

2. REPA TING PERIOD: SEPTEMBER, 1995
3. licks **3 THERMAL POWER (MWT):

3293

4. NAMEP'. ATE RATING (GROSS MWE):

1152

5. DESIGN ELECTRICAL RATING (NET MWE):

1065

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):

1035

8. IF CHANGES DCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

a

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

4 THIS MONTH YR TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 720 6,551 182,087
12. NUMBER OF HOURS REACTOR WAS CRITICAL 525.0 6,218.5 119,477.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 l
14. HOURS GENERATOR ON LINE 525.0 6,204.0 116,083.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,015,265 17,496,697 344,070,640
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 307,300 5,608,000 112,754,032
18. NET ELECTRICAL ENERGY GENERATED (MWH) 284,823 5,363,707 108,205,066 PAGE 1 0F 2 l

1 I

l I

l

e*

OPERATING 0ATA REPORT (CONTINUED)

DOCKET NO. 50 - 278 DATE OCT09ER 10,1995 THIS MONTH YR TO DATE CUMULATIVE

19. UNIT SERVICE FACTOR 72.9 94.7 63.8
20. UNIT AVAILABILITY FACTOR 72.9 94.7 63.8
21. UNIT CAPACITY FACTOR (USING MDC NET) 38.2 79.1 57.4
22. UNIT CAPACITY FACTOR (USING DER NET) 37.1 76.9 55.8
23. UNIT FORCED OUTAGE RATE 0.0 2.4 11.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 10/20/95
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL DPERAT!DN 12/23/74 PAGE 2 0F 2 1

)

1 l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 I

UNIT NAME PEACH BOTTOM UNIT 2 DATE OCTOBER 10,1995 REPORT MONTH SEPTEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 4

(1)

(2)

(3)

(4)

J F

FORCED REASON METHOD EXHIBIT G INSTRUCTIONS S SCHEDULED A EQUIPMENT FAILURE (EXPLAIN) 1 MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE 4

C REFUELING 3 AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 OTHER (EXPLAIN)

FILE (NUREG-0161)

E OPERATOR TRAINING + LICENSE EXAMINATION F

  • ADMINISTRATIVE (5)

G OPERATIONAL ERROR (EXPLAIN)

H OTHER(EXPLAIN)

EXHIBIT I SAME SOURCE 1

4 i

i l

i p

e 1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE OCTOBER 10,1995 REPORT MONTH SEPTEMBER, 1995 COMPLETED BY PECO ENERGY COMPANY W. J. JEFFREY PERFORMANCE AND RELIABILITY

$1TE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456 7014 EXT. 4027 METHOD OF LICENGEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO.

DATE (1)

(HOURS)

(2)

REACTOR (3)

REPORT #

(4)

(5)

PREVENT RECURRENCE 13 950922 S

195.0 H

4 RC CONR00 REACTOR SHUTDOWN FOR 3R10 REFUEL OUTAGE 4

195.0 4

4 (1)

(2)

(3)

(4)

F ' FORCED REASON METHOD EXHIBIT G INSTRUCTIONS S SCHEDULED A

  • EQUIPMENT FAILURE (EXPLAIN) 1 MANUAL FOR PREPARATION OF DATA B = MAINTENANCE OR TEST 2 MANUAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUELING 3 AUTOMATIC SCRAM.

EVENT REPORT (LER)

D REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (NUREG-0161)

E OPERATOR TRAINING + LICENSE EXAMINATION F

  • ADMINISTRATIVE (5)

G OPERATIONAL ERROR (EXPLAIN)

H OTHER(EXPLAIN)

EXHIBli I SAME SOURCE

-