. . . . - . _ . . _ . . . . - . . . ,
5- .
Peach Ecttom Ltamic Power Etztlan 4
..t . A
- y. ;
c PECO ENERGY ;;cM;;;an
, -a ">
Delta. PA 17314 9739 717 456 7014 November 10,1995 U.S. Nuclear Regulatory Commission ,
Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278 ;
Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, .
['
Gerald R. Rainey l
Vice President, i Peach Bottom Atomic Power Station kd6N GRR/AJW/GHG/TNM/JGH:wjj i
enclosures cc: R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania -
R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident inspector H.C Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Ught INPO Records Center l
0-n: e, . .
e, L u u tj ccn 95-14097 9511210043 951031 PDR ADDCK 05000277 , i R. PDR
I
..( ," PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY CPERATIONS
SUMMARY
OCTOBER 1995 UNIT 2 Unit 2 began the month of October at 100% nominal power and operated at that power level until .
October 26. Power was reduced to approximately 95% after isolating the "B" feedwater string in response to a feedwater heater leak.
UNIT 3 Unit 3 began the month of October shut down for the tenth refueling outage. The unit returned to power operation on October 22. Ndminal 100% power was achelved on October 23 and remained ,
at that level for the rest of the month. ,
i I
l l
I f
l f
i e
_. . . . ~ - . _ . - . _ . - _ - - - - - . . ~ . - - -- - . - - . - ~ . .
I Attachment to '
4
. Monthly Operating
- Report for October 1995 ,
t P
^
UNIT 2 REFUELING INFORMATION .
- 1. Name of facNity: !
Peach Bottom Unit 2 ;
i
- 2. Scheduled date for next refueling shutdown: j Reload 11 scheduled for September 20,1996.
- 3. Scheduled date for restart following refueling: l i
Restart following refueling forecast for November 2,1996. l i
i
- 4. Will refueling or resumption of operation therefore require a technical specification change or other l license emendment? ,
N/A ,
'i If answer is yes, what, in general, wHI these be? l
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information: ;
i N/A
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or l
. supplier, unreviewed design or performance analysis methods, significant changes in fuel design, l new operating procedures:
N/A
- 7. The number of fuel assembliec (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies 1
(b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods ]
4
- . . .' Docket No. 50-277 Attachment to Monthly Operating
- Report for October 1995
. Page 2 4
UNIT 2 REFUELING INFORMATION (Continued) i
- 8. The present licensed spent fuel pool storage capacky and the size of any increase in licensed storage capacky that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacky has been relicensed for 3819 fuel assemblies.
i i
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacky:
September 2004 without full core offload capability.
September 1998 with full bore offload capabilty. 1 6
i e
.- . - .. -. . . . - - - - ~ . - _~
.' Docket No. 50-278 Attachment to Monthly Operating - j Report for October 1995 !
UNIT 3 REFUELING INFORMATION
- 1. Name of facility: .
Peach Bottom Unit 3
- 2. Scheduled date for next refueling shutdown:
Reload 11 scheduled for September 15,1997 ,
- 3. Scheduled date for restart following refueling {
Restart following refueling scheduled for October 20,1997 i
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other I license amendment?
j N/A If answer is yes, what, in general, will these be? l S. Scheduled date(s) for submitting proposed licensing action and supporting information: ;
i
- 6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A
- 7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies, 6 Fuel Rods
- 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
...7
.. ." Docket No. 50-278 Attachment to Monthly Operating Report for October 1995 Page 2 L UNIT 3 REFUEUNG INFORMATION (Continued) l
- 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capab8ity.
September 1999 with full core offload capablity.
I e
l i
( .'
AVER?.GE DAILY UNIT POWE3 LEVEL ,
DOCKET NO. 50 - 277 ,
UNIT PEACH 80TTO4 UNIT 2 _
DATE NOVEMBER 9.1995 COMPANY PECO ENERGY COMPANY ,
L. P. HYDRICK l
SUSINESS SERVICES SITE SUPPORT OIVISION ,
I' PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
! MONTH OCTOBER 1995 l '
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (WWE-MET)'
i 1 1104 17 1108 -
2 1096 18 1099 3 1104 19 1100 4 1100 20 1107 {
5 1096 21 1098 ;
6 1108 22 1089 7 1100 23 1102 ;
8 1110 24 1101.
9 1102 25 1100 10 1110 26 1078 11 1109 27 1043 12 1105 28 1030 13 1099 29 1079 14 1106 30 1035 15 1102 31 1039 8 i
16 1102 b
__ _ . . _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . - . . . . . _ _ _ ~ _ _ _ _ _ _ _ . . . . _ , _ _ _ . . . . _ _ ._ . . , . _ _ . . - . . _ . . - . _ _ . _ . . . . . _ _ _ . ,
^ '
AVERAGE DOILY UNIT POWEQ LEVEL .
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 .,
DATE NOVEMBER 9,1995 COMPANY PECO ENERGY COMPANY ,
L. P. HYDRICK SUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 _
MONTH OCTOBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWE-NET) (WWE-NET) 1 0 17 156 2 0 18 204 3 0 19 324 4 0 20 606 5 0 21 865 6 0 22 1055 7 0 23 1108 8 0 24 1078 9 0 25 1099 1
10 0 26 1106 11 0 27 1126 12 0 28 1110 13 0 29 1162 14 0 30 1118 15 0 31 1109 16 0
_. . .. ... ,... - - . . - . . . . . . . ~ . . . . - . - , - - . ~ . . - - . , _ , . _ . . . . . . . - . - . . - - - - . _ . -
. -+:
OPEIATING D?.TA REPORT ,
DOCKET NO. 50.- 277 ,
DATE NOVEMBER 9.1995 ,
COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES ~
SITE SUPPORT DIVT'4 ;'F-PEACH BOTTOM ATOh -MER STATION TELEPHONE (717) 456-4383 - - . - _ _ _ ,
OPERATING STATUS ,
__.- =-.
- 1. UNIT MAME: PEACH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIOD: OCTOBER, 1995 ,
(
)
- 3. LICENSED THERMAL POWER (MWT): 3458 1221 ;
4 NAMEPLATE RATING (GROSS MWE):
- 5. DESIGN ELECTRICAL RATING (NET MWE): 1119 '{
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093
- 8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS MUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE): ,
- 10. REASONS FOR RESTRICTIONS. IF ANY: s i
THIS MONTH YR-TO-DATE CUMULATIVE [
- 11. HOURS IN REPORTING PERIOD 745 7.296 186.936
?
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7.296.0 121.259.1
.__ .. [
- 13. REACTOR RESERVE SHUTDOWN MURS 0.0 0.0 0.0.
m ._
14 HOURS GENERATOR ON-LINE 745.0 7.296.0 117.299.2 ,
0.0 0.0 0.0 f
- 15. UNIT RESERVE SHUTDOWN HOURS
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2.546.810 24.946.480 353.267.363 !
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 839.700 8.244.300 118.123.690 ,
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 812.587 7.988.143 111.430.599 -
PAGE 1 OF 2
. . . - . ., , _ _ _ . _ _ _ - - _ _ _ . __ _._.__._ _ . ~ . . - - - . - _ _ , , . _ - - , _ . _ . . _ _ _ - - - _ , . .
m .
OPERATING DATA fLEPORT (CONTINUED) 'DOCMET NO..:53 - 277 ,
DATE NOVEMBER 9,1995 .
THIS MONTH VR-TO-DATE CUMULATIVE
- 19. UNIT SERVICE FACTOR 100.0 100.0 62.7 'l
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.7
- 21. UNIT CAPACITY FACTOR (USING MDC NET) ~ 99.8 100.2 E6.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 97.5 97.8 55.7
- 23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.4
' i
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH): }
~t
- 25. IF SHUTDOWN AT END OF REPORT PERIOD.. ESTIMATED DATE OF STARTUP: N/A i
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 t
COMMERCIAL OPERATION 07/05/74 6
0 6
PAGE 2 OF 2 5
6 b
- _. _ . - . ____.______________._______._._______m. ,,m.- , _. _ __ - _ . .s._ -_s_m,. . ....# , , , , .. , , , . , , . . . ,,%,y ,,_., ,,,,,-.,, , ..,___.,,
OPESATING DATA REPOCT .
DOCKET NO. 50 - 278 .
^ . i DATE NOVEMBER 9.1995 .
5 COMPLETED BY PECO ENERGY COMPANY-
~L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383
.- . = - - _
OPERATING STATUS
- 1. UNIT HAME: PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERIOD: OCTOBER, 1995
- 3. LICENSED THERMAL POWER (MWT): 3458
- 4. NAMEPLATE RATING (GROSS MWE): 1221
- 5. DESIGN ELECTRICAL RATING (HET MWE): 1119
- 6. MAXIMUM OEPENDABLE CAPACITY (GROSS MWE): 1159
- 7. MAXIMUM DEPENDABLE CAPACITY (HET MWE): 1093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS: !
93-12 POWER RERATE CHANGED THE RATINGS OF ITEMS 3-7.
- 9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (HET MWE):
- 10. REASONS FOR RESTRICTIONS. IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 745 7.296 182.832 i
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 360.0 6.578.5 119,837.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 14. HOURS GENERATOR ON-LINE 360.0 6.564.0 116.443.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 ,
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1.001.028 18.497.725 345.071.668
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 329.600 5.937.600 113.083.632
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 314.451 5.678.158 108.519.517 i
PAGE 1 OF 2 ,
I
..----._._.-_a.---.---._..-___-a_- - _ _ _ . - - - - - - - _ _ - - - _ _ . _ _ - - .
- -- n -o-. -
w ~
' OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50.- 278~ ,
'DATE NOVEMBER 9.1995 .
THIS MONTH- YR-TO-DATE CUMULATIVE D
- 19. UNIT SERVICE FACTOR 48.3 90.0 63.7
= __
- 20. UNIT AVAILABILITV FACTOR 48.3 90.0 63.7.
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 38.6' 75.0 57.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) ~37.7 72.9 55.7
- 23. UNIT FORCED OUTAGE RATE O.0 2.3 11.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 ,
PAGE 2 OF 2
. . . . _ _ _ - . . _ -___________..______________________s
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH 80TTOM UNIT 2 DATE NOVEMBER 9.1995 REPORT MONTH OCTOBER. 1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE COOE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE (1) (2) (3) (4) 4 F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS-S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTDMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE
\
4 T
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 '
DATE NOVEMBER 9.1995 REPORT MONTH OCTOBER. 1995 COMPLETED BV PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTON ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOO OF LICENSEE SYSTEM COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DCNN EVENT CODE CODE I ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT dr (4) (5) l PREVENT RECURRENCE 13 951001 S 385.0 H 4 RC CONROO REACTOR SHUTDOWN FOR 3R10 REFUEL OUTAGE 1
1 385.0 (1) (2) (3) (4)
F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)
D - REGULATORY RelTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)
E - OPERATOR TRC 11MG + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G - OPERATIONAL EkROR (EXPLAIN)