Monthly Operating Repts for Oct 1995 for Peach Bottom Units 2 & 3
ML20094L630
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/31/1995
From: Hydrick L, Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9511210043
Download: ML20094L630 (14)


Text

. . . . - . _ . . _ . . . . - . . . ,

5- .

Peach Ecttom Ltamic Power Etztlan 4

..t . A

y.  ;

c PECO ENERGY  ;;cM;;;an

, -a ">

Delta. PA 17314 9739 717 456 7014 November 10,1995 U.S. Nuclear Regulatory Commission ,

Document Control Desk Washington, D.C. 20555 Docket Nos. 50-277 and 50-278  ;

Gentlemen:

Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of October 1995 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, .

['

Gerald R. Rainey l

Vice President, i Peach Bottom Atomic Power Station kd6N GRR/AJW/GHG/TNM/JGH:wjj i

enclosures cc: R.A. Burricelli, Public Service Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania -

R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L Schmidt, USNRC, Senior Resident inspector H.C Schwemm, Atlantic Electric A.F. Kirby, Ill, Delmarva Power & Ught INPO Records Center l

0-n: e, . .

e, L u u tj ccn 95-14097 9511210043 951031 PDR ADDCK 05000277 , i R. PDR

I

..( ," PEACH BOTTOM ATOMIC POWER STATION NRC MONTHLY CPERATIONS

SUMMARY

OCTOBER 1995 UNIT 2 Unit 2 began the month of October at 100% nominal power and operated at that power level until .

October 26. Power was reduced to approximately 95% after isolating the "B" feedwater string in response to a feedwater heater leak.

UNIT 3 Unit 3 began the month of October shut down for the tenth refueling outage. The unit returned to power operation on October 22. Ndminal 100% power was achelved on October 23 and remained ,

at that level for the rest of the month. ,

i I

l l

I f

l f

i e

_. . . . ~ - . _ . - . _ . - _ - - - - - . . ~ . - - -- - . - - . - ~ . .

I Attachment to '

4

. Monthly Operating

Report for October 1995 ,

t P

^

UNIT 2 REFUELING INFORMATION .

1. Name of facNity:  !

Peach Bottom Unit 2  ;

i

2. Scheduled date for next refueling shutdown: j Reload 11 scheduled for September 20,1996.
3. Scheduled date for restart following refueling: l i

Restart following refueling forecast for November 2,1996. l i

i

4. Will refueling or resumption of operation therefore require a technical specification change or other l license emendment? ,

N/A ,

'i If answer is yes, what, in general, wHI these be? l

5. Scheduled date(s) for submitting proposed licensing action and supporting information:  ;

i N/A

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or l

. supplier, unreviewed design or performance analysis methods, significant changes in fuel design, l new operating procedures:

N/A

7. The number of fuel assembliec (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies 1

(b) Fuel Pool - 2436 Fuel Assemblies,59 Fuel Rods ]

4

- . . .' Docket No. 50-277 Attachment to Monthly Operating

  • Report for October 1995

. Page 2 4

UNIT 2 REFUELING INFORMATION (Continued) i

8. The present licensed spent fuel pool storage capacky and the size of any increase in licensed storage capacky that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacky has been relicensed for 3819 fuel assemblies.

i i

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacky:

September 2004 without full core offload capability.

September 1998 with full bore offload capabilty. 1 6

i e

.- . - .. -. . . . - - - - ~ . - _~

.' Docket No. 50-278 Attachment to Monthly Operating - j Report for October 1995  !

UNIT 3 REFUELING INFORMATION

1. Name of facility: .

Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 15,1997 ,

3. Scheduled date for restart following refueling {

Restart following refueling scheduled for October 20,1997 i

4. Will refueling or resumption of operation thereafter require a technical specification change or other I license amendment?

j N/A If answer is yes, what, in general, will these be? l S. Scheduled date(s) for submitting proposed licensing action and supporting information:  ;

i

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

N/A

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 2201 Fuel Assemblies, 6 Fuel Rods

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

...7

.. ." Docket No. 50-278 Attachment to Monthly Operating Report for October 1995 Page 2 L UNIT 3 REFUEUNG INFORMATION (Continued) l

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2003 without full core offload capab8ity.

September 1999 with full core offload capablity.

I e

l i

( .'

AVER?.GE DAILY UNIT POWE3 LEVEL ,

DOCKET NO. 50 - 277 ,

UNIT PEACH 80TTO4 UNIT 2 _

DATE NOVEMBER 9.1995 COMPANY PECO ENERGY COMPANY ,

L. P. HYDRICK l

SUSINESS SERVICES SITE SUPPORT OIVISION ,

I' PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383

! MONTH OCTOBER 1995 l '

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (WWE-MET)'

i 1 1104 17 1108 -

2 1096 18 1099 3 1104 19 1100 4 1100 20 1107 {

5 1096 21 1098  ;

6 1108 22 1089 7 1100 23 1102  ;

8 1110 24 1101.

9 1102 25 1100 10 1110 26 1078 11 1109 27 1043 12 1105 28 1030 13 1099 29 1079 14 1106 30 1035 15 1102 31 1039 8 i

16 1102 b

__ _ . . _ _ . _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . - . . . . . _ _ _ ~ _ _ _ _ _ _ _ . . . . _ , _ _ _ . . . . _ _ ._ . . , . _ _ . . - . . _ . . - . _ _ . _ . . . . . _ _ _ . ,

^ '

AVERAGE DOILY UNIT POWEQ LEVEL .

DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 .,

DATE NOVEMBER 9,1995 COMPANY PECO ENERGY COMPANY ,

L. P. HYDRICK SUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 _

MONTH OCTOBER 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (WWE-NET) (WWE-NET) 1 0 17 156 2 0 18 204 3 0 19 324 4 0 20 606 5 0 21 865 6 0 22 1055 7 0 23 1108 8 0 24 1078 9 0 25 1099 1

10 0 26 1106 11 0 27 1126 12 0 28 1110 13 0 29 1162 14 0 30 1118 15 0 31 1109 16 0

_. . .. ... ,... - - . . - . . . . . . . ~ . . . . - . - , - - . ~ . . - - . , _ , . _ . . . . . . . - . - . . - - - - . _ . -

. -+:

OPEIATING D?.TA REPORT ,

DOCKET NO. 50.- 277 ,

DATE NOVEMBER 9.1995 ,

COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES ~

SITE SUPPORT DIVT'4 ;'F-PEACH BOTTOM ATOh -MER STATION TELEPHONE (717) 456-4383 - - . - _ _ _ ,

OPERATING STATUS ,

__.- =-.

1. UNIT MAME: PEACH BOTTOM UNIT 2 NOTES:
2. REPORTING PERIOD: OCTOBER, 1995 ,

(

)

3. LICENSED THERMAL POWER (MWT): 3458 1221  ;

4 NAMEPLATE RATING (GROSS MWE):

5. DESIGN ELECTRICAL RATING (NET MWE): 1119 '{
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093
8. IF CHANGES OCCUR IN CAPACITV RATINGS (ITEMS MUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE): ,
10. REASONS FOR RESTRICTIONS. IF ANY: s i

THIS MONTH YR-TO-DATE CUMULATIVE [

11. HOURS IN REPORTING PERIOD 745 7.296 186.936

?

12. NUMBER OF HOURS REACTOR WAS CRITICAL 745.0 7.296.0 121.259.1

.__ .. [

13. REACTOR RESERVE SHUTDOWN MURS 0.0 0.0 0.0.

m ._

14 HOURS GENERATOR ON-LINE 745.0 7.296.0 117.299.2 ,

0.0 0.0 0.0 f

15. UNIT RESERVE SHUTDOWN HOURS
16. GROSS THERMAL ENERGY GENERATED (MWH) 2.546.810 24.946.480 353.267.363  !
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 839.700 8.244.300 118.123.690 ,
18. NET ELECTRICAL ENERGY GENERATED (MWH) 812.587 7.988.143 111.430.599 -

PAGE 1 OF 2

. . . - . ., , _ _ _ . _ _ _ - - _ _ _ . __ _._.__._ _ . ~ . . - - - . - _ _ , , . _ - - , _ . _ . . _ _ _ - - - _ , . .

m .

OPERATING DATA fLEPORT (CONTINUED) 'DOCMET NO..:53 - 277 ,

DATE NOVEMBER 9,1995 .

THIS MONTH VR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 100.0 62.7 'l
20. UNIT AVAILABILITY FACTOR 100.0 100.0 62.7
21. UNIT CAPACITY FACTOR (USING MDC NET) ~ 99.8 100.2 E6.5
22. UNIT CAPACITY FACTOR (USING DER NET) 97.5 97.8 55.7
23. UNIT FORCED OUTAGE RATE 0.0 0.0 12.4

' i

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. AND DURATION OF EACH): }

~t

25. IF SHUTDOWN AT END OF REPORT PERIOD.. ESTIMATED DATE OF STARTUP: N/A i
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 t

COMMERCIAL OPERATION 07/05/74 6

0 6

PAGE 2 OF 2 5

6 b

- _. _ . - . ____.______________._______._._______m. ,,m.- , _. _ __ - _ . .s._ -_s_m,. . ....# , , , , .. , , , . , , . . . ,,%,y ,,_., ,,,,,-.,, , ..,___.,,

OPESATING DATA REPOCT .

DOCKET NO. 50 - 278 .

^ . i DATE NOVEMBER 9.1995 .

5 COMPLETED BY PECO ENERGY COMPANY-

~L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383

.- . = - - _

OPERATING STATUS

1. UNIT HAME: PEACH BOTTOM UNIT 3 NOTES:
2. REPORTING PERIOD: OCTOBER, 1995
3. LICENSED THERMAL POWER (MWT): 3458
4. NAMEPLATE RATING (GROSS MWE): 1221
5. DESIGN ELECTRICAL RATING (HET MWE): 1119
6. MAXIMUM OEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (HET MWE): 1093
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASONS:  !

93-12 POWER RERATE CHANGED THE RATINGS OF ITEMS 3-7.

9. POWER LEVEL TO WHICH RESTRICTED. IF ANY (HET MWE):
10. REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 745 7.296 182.832 i
12. NUMBER OF HOURS REACTOR WAS CRITICAL 360.0 6.578.5 119,837.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 360.0 6.564.0 116.443.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 ,
16. GROSS THERMAL ENERGY GENERATED (MWH) 1.001.028 18.497.725 345.071.668
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 329.600 5.937.600 113.083.632
18. NET ELECTRICAL ENERGY GENERATED (MWH) 314.451 5.678.158 108.519.517 i

PAGE 1 OF 2 ,

I

..----._._.-_a.---.---._..-___-a_- - _ _ _ . - - - - - - - _ _ - - - _ _ . _ _ - - .

- -- n -o-. -

w ~

' OPERATING DATA REPORT (CONTINUED) DOCKET NO. 50.- 278~ ,

'DATE NOVEMBER 9.1995 .

THIS MONTH- YR-TO-DATE CUMULATIVE D

19. UNIT SERVICE FACTOR 48.3 90.0 63.7

= __

20. UNIT AVAILABILITV FACTOR 48.3 90.0 63.7.
21. UNIT CAPACITY FACTOR (USING MDC NET) 38.6' 75.0 57.3
22. UNIT CAPACITY FACTOR (USING DER NET) ~37.7 72.9 55.7
23. UNIT FORCED OUTAGE RATE O.0 2.3 11.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT END OF REPORT PERIOD. ESTIMATED DATE OF STARTUP: N/A
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09/01/74 COMMERCIAL OPERATION 12/23/74 ,

PAGE 2 OF 2

. . . . _ _ _ - . . _ -___________..______________________s

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 UNIT NAME PEACH 80TTOM UNIT 2 DATE NOVEMBER 9.1995 REPORT MONTH OCTOBER. 1995 COMPLETED BY PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH 80TTOM ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE COOE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE (1) (2) (3) (4) 4 F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS-S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTDMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE

\

4 T

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 '

DATE NOVEMBER 9.1995 REPORT MONTH OCTOBER. 1995 COMPLETED BV PECO ENERGY COMPANY L. P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTON ATOMIC POWER STATION TELEPHONE (717) 456-4383 METHOO OF LICENSEE SYSTEM COMPONENT l CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DCNN EVENT CODE CODE I ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT dr (4) (5) l PREVENT RECURRENCE 13 951001 S 385.0 H 4 RC CONROO REACTOR SHUTDOWN FOR 3R10 REFUEL OUTAGE 1

1 385.0 (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G - INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RelTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRC 11MG + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL EkROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE

. . . . . .