ML20117F816

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for April 1996 for PBAPS
ML20117F816
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/30/1996
From: Hydrick L, Mitchell T
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9605200258
Download: ML20117F816 (14)


Text

_

Peach Bottom Atomic Power Station i

l .

PECO NUCLEAR r= -v 1848 Lay Road l 'A Unit of PECO Energy Delta. PA 17314 9032 j 717 456 7014 i

l May 15,1996  !

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 -

Docket Nos. 50-277 and 50-278 Gentlemen:

Enclosed is the monthly operating report for Peach Bottom Units 2 and 3 for the month of April 1996 forwarded pursuant to Technical Specification 5.6.4 under the guidance of Regulatory Guide 10.1, Revision 4.

Sincerely, Thomas N. Mitchell Vice President, Peach Bottom tomic Power Station i

  • Wd5 TNM/ MEW /JGH:!ph Enclosures cc: B.W. Gorman, Public Service Electric & Gas W.P. Domsife, Commonwealth of Pennsylvania R.I. McLean, State of Maryland T.T. Martin, Administrator, Region I, USNRC W.L. Schmidt, USNRC, Senior Resident inspector H.C. Schwemm Atlantic Electric A.F. Kirby,111, Delmarva Power & Light INPO Records Center ccn 96-14041 l

9605200258 960430 F PDR ADOCK 050002771  ;

R PDR ~ t y .I i

PEACH COTTOM ATOMIC POWER STATION j NRC MONTHLY OPERATIONS

SUMMARY

( April 1996 UNIT 2 Unit 2 began the t'onth of April at 96% power due to thermal limits. On April 8th the unit began end of cycle coastdown. Power was reduced during the month for the following:

April 7-8: Rod pattern adjustment (all rods out).

- April 12: 5th Feedwater heaters removed from service.

l The unit ended the month in end of cycle coastdown.

l Unit 2 Net Generation for April was 774,120 MW.

l l

l UNIT 3 Unit 3 began the month of April at 100% power. Power was reduced during the month for the following:

l -

April 12-13: Condenser waterbox cleaning.

April 18: Rod pattern adjustment.

Unit 3 Net Generation for April was 794,006 MW.

i l

l '

1 AttachmInt to i Monthly Operating Report for April 1906 l

. l UNIT 2 REFUELING INFORMATION

1. Name of facility:

Peach Bottom Unit 2

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 13,1996.

3. Scheduled date for restart following refueling:

Restart following refueling forecast for October 20,1996.

4. Will refueling or resumption of operation therefore require a technical specification change or other license amendment?

i Yes.  !

If answer is yes, what, in general, will these be?

?. "'ida hme Neutron Mnni'ariaa hetara h

1 -

2.10CFR50 Appendix J, Option B

3. Increase MCPR Value l S. Scheduled date(s) for submitting proposed licensing action and supporting information:

All three items have been submitted for review and approval.

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

l GE-13 Fuel Product Line will be utilized requiring a Tech Spec amendment.

7. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2436 Fuel Assemblies,52 Fuel Rods i

l

. . _ _ . . . _ ~ . -- .- -.. . . _ _ _ - .- _ _

l Docket No. 50-277 Attachment to l

Monthly Operating i Report for April 1996 Page 2 l

l UNIT 2 REFUELING INFORMATION (Continued) l

8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number uf fuel assemblies: I The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:

September 2004 without full core offload capability.  ;

September 1998 with full core offload capability.

h l i l

f

, Dockst No. 50-278

! Attachment to Monthly Operating Repo1 for April 1996 UNIT 3 REFUELING INFORMATION j 1. Name of facility:

l Peach Bottom Unit 3

2. Scheduled date for next refueling shutdown:

Reload 11 scheduled for September 15,1997 i 3. Scheduled date for restart following refueling l

I Restart following refueling scheduled for October 20,1997

4. Will refueling or resumption of operation thereafter require a technical specification change or otherlicense amendment?

N/A If answer is yes, what, in general, will these be?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

i

6. Important licensing considerations associated with refueling, e.g., new or different fuel design or l supplier, unreviewed design or performance analysis methods, significant changes in fuel design, l new operating procedures:

i l N/A i

7. The number of fuel assemblies (a) In the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool- 2485 Fuel Assemblies,16 Fuel Rods

~ 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

j The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.

5

. Dock!t No. 50-278 Attachment to Monthly Operating Report for April 1996

. Page 2 UNIT 3 REFUELING INFORMATION (Continued)

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming  !

the present capacity:

i September 2003 without full core offload capability.

September 1999 with full core offload capability.

l l

i l

l l

_ _ _ - - - _ _ - - _ , , n -m +

AVERAGE DAILY POWER LEVEL ,

t DOCKET NO. 50-277 UNIT PEACH BOTTOM UNIT 2 --

DATE MAY 7,1996 -

COMPANY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION -

PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456-4383 MONTH APRIL,1996 DAY AVERAGE DAILY POWER LEVEL DAY. AVERAGE DAILY POWER LEVEL

(MWE-NET) (MWE-NET) 1 1077 17 1096 2 1072 18 1099 3 1063 19 1094 4 1059 20 1106 5 1059 21 -1070 6 1056 22 1081 7 1048 23 1077 8 1094 24 1073 9 1103 25 1065 10 1110 26 1055 11 1090- 27 '1048 12 1092 28 1047 13 1108 29 1036 i 14 1095 30 '1036 l 15 1094

[

16 1096 l

i

AVERAa$ DAILY POWER LEVEL DOCKET NO. 50-273 UNIT PEACH BOTTOM UNIT 3 i DATE MAY 7,1996 -

COMPANY PECO ENERGY COMPANY i L P.HYDRICK i BUSINESS SERVICES - i SITE SUPPORT DMSiON .

i PEACH BOTTOM ATOMIC POWE:t STATION  !

TELEPHONE (717)456-4383 i MONTH APRIL,1996 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL .

I (MWE-NET) (MWE-NET) a 1 1121 17 1116 2 1120 18 1085 f

3 1115 19 1121 4 1120 20 1135 i

5 1117 21 1106 l i

6 1121 22 1118  ?

l I

, 7 1119 23 1118 8 1117 24 1113 ,

t I

9 1117 25 1118 10 1121 26 1105 11 1113 27 1105 12 1109 28 1112 13 805 29 1102 14 1115 30 1115 ,

15 1117 t 16 1118 i

. - - - - - - - . . ~ . . . . - . . _ - - - - - - - - - - - - - - - - - - - - - - - - - - - - . - - - - - - -- . - - - - - - - - - - - - - - - - - - - - - --- . - - - - - - - - - - - - . - - - - - - - - - - - - - -

OPERATING DATA REPORT [

DOCKET NO. 50-277 , ,

DATE MAY 7,1996 i COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK ,

BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION ,

TELEPHONE (717) 456-4383 OPERATING STATUS t

-i PEACH BOTTOM UNIT 2 j 1. UNIT NAME: s NOTES:'  ;

2. REPORTING PERIOD: APRIL,1996 ,
3. LICENSED THERMAL POWER (MWT): 3458
4. NAMEPLATE RATING (GROSS MWE): _ _ _ _ _ _ _ _ _ .1221

! l S. DESIGN ELECTRICAL RATING (NET MWE): ___ _.

1119 4

6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): __ _ _ .._ _ _1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1093 F
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS: ,

I 9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE): [

t

10. REASONS FOR RESTRICTIONS,IF ANY:

i THIS MONTH YR-TO-DATE CUMULATIVE }

11. HOURS IN REPORTING PERIOD 719 2,903 191,303

+

12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,903.0 125,498.5
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i
14. HOURS GENERATOR ON-LINE 719.0 2.903.0 121,504.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 ,

i l

16. GROSS THERMAL ENERGY GENERATED (MWH) 2,429,671 9,811,925 367,387,968 l 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 798,300 3,251,400 120,791,190 l
18. NET ELECTRICAL ENERGY GENERATED (MWH) 774,121 . 3,159,907 115,965,802 l PAGE 1 OF 2 t

. . _ _ . _ _ _ _ _ . _ _ _ _ _ _ . . _ _ _ . . _ _ . . _ _ . _ - . _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ . - _ _ __ _________-.__-m__,__,___.__.__---~._m__m___~__._____m_ _ _ - _ _ _ _ _ _ . - _.- ,-- ___. .--_....

OPERATING DATA REPORT (CONTINUED)

DOCKET NO, 50 - 277 DATE MAY 7,1996 i

1 THIS MONTH YR-TO-DATE CUMULATt,VE -

19. UNIT SERVICE FACTOR 100.0 % 100.0 % 63.5 %
20. UNIT AVAILABILITY FACTOR 100.0 % 100.0 % 63.5 %
21. UNIT CAPACITY FACTOR (USING MDC NET) 98.5 % 99.6 % - 57.4 %
22. UNIT CAPACITY FACTOR (USING DER NET) 96.2 % 97.3 % 56.6 %
23. UNIT FORCED OUTAGE RATE .0 % .0 % 12.0 %
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):

Refuehng outage schedule to begm 9/13/96, Duration 37 days 1

25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP;
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 i

COMMERCIAL OPERATION 07/05'74 i

l a

i 4

PAGE 2 OF 2

~

OPERATING DATA REPORT DOCKET NO. 50 - 278 ,

DATE MAY 7,1996 -

COMPLETED BY PECO ENERGY COMPANY

! L P. HYDRICK BUSINESS SERMCES SITE SUPFORT DIVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456 4383 OPERATING STATUS

1. UNIT NAME: _. __.. _ _ _ .. _ __ ._. _ _. _. __. ._ . _ _ . _ ._ _ _ .P.EA. ..CH .BO.T. _ TOM _U N. I_T 3 _
2. REPORTING PERIOD: ____ , _ .,_ _ _ _ _ _ . ___ _, __ _ _AP_Ril.1996
3. LICENSED THERMAL POWER (MWT). _ .___ _ ___ _ ___ ,__ _3458
4. NAMEPLATE RATING (GROSS MWE): ____._ _ _ __ _ _ _ __. _ __ _ _ 1221_
5. DESIGN ELECTRICAL RATING (NET MWE): 1119
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1159
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): . 1093
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED,IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS,IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 719 2,903 187,199
12. NUMBER OF HOURS REACTOR WAS CRITICAL 719.0 2,903 0 124,190.2
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 00
14. HOURS GENERATOR ON-LINE 719.0 2,853.0 120,661.2
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 2,463,348 9,727,010 359,413,467
17. GROSS ELECTRICAL ENERGY GENERATE 0 (MWH) 816,500 3,219,200 117,838,S32
18. NET ELECTRICAL ENERGY GENERATED (MWH) 794,007 3,136,247 113,150,099 PAGE 1 OF 2

OPERATING DATA REPORT (CONTINUED)

DOCKET NO. 50 -278 DATE MAY 7,1996 5

THIS MONTH YR-TO-DATE CUMULATIVE

19. UNIT SERVICE FACTOR 100.0 % 98.3 % 64.5 %

.; 20. UNIT AVAILABILITY FACTOR 100.0 % 98.3 % 64.5 %

21. UNIT CAPACITY FACTOR (USING MDC NET) 101.0 % 98.8 % 58.2 %
22. UNIT CAPACITY FACTOR (USING DER NET) 98.7 % 98.5 % 56.6 %
23. UNIT FORCED OUTAGE RATE .0 % 1.7 % 10.9 %
24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS): FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74 l

INITIAL ELECTRICITY 0901/74 COMMERCIAL OPERATION 12/23/74 j

l PAGE 2 OF 2

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-277 **

UNIT NAME' PEACH BOTTOM UNIT 2 ,

DATE MAY 7,1996 COMPLETED BY PECO ENERGY COMPANY .

L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION PEACH BOTTOM ATOMIC POWER STATION .

REPORT MONTH APRIL,1996 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE- CODE ACTION TO WO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 12 960407 S 3.0 H 4 RB CONROD Rod pattern adjustment Reactor not shut down 13 960412 S 30 H 4 CH HTEXCH 5th stage FW heaters removed from service Reactor not shut down TOTAL HOURS 6.0 (1) (2) (3) (4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUlPMENT FAILURE (EXPLAIN) 1-MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3- AUTOMATIC SCRAM EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4- OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN) EXHIBIT I- SAME SOURCE H - OTHER (EXPLAIN) u --- --

UNIT SHUTDOWNS AND POWER REDUCTIONS ,

.~

DOCKET NO. 50-278 UNIT NAME PEACH BOTTOM UNIT 3 DATE MAY 7,1996

~

COMPLETED BY PECO ENERGY COMPANY L P. HYDRICK BUSINESS SERVICES SITE SUPPORT DIVISION ,

PEACH BOTTOM ATOMIC POWER STATION REPORT MONTH APRIL,1996 TELEPHONE (717)456-4383 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTIVE TYPE DURATION REASON SHUTTING DOWN EVENT CODE CODE ACTION TO NO. DATE (1) (HOURS) (2) REACTOR (3) REPORT # (4) (5) PREVENT RECURRENCE 10 960412 S 7.0 B 4- HF XXXXXX Waterta cleenmg & RFP repair Reactor not shuMmm 19 960418 S 2.0 H 4 RB CONROD Rod Pattem Adjustment Reactor not shut down TOTAL HOURS 9.0 i

(1) (2) (3) (4)

F-FORCED REASON METHOD EXHIBIT G -INSTRUCTIONS S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C- REFUELING 3- AUTOMATIC SCRAM EVENT REPORT (LER) ,

D - REGULATORY RESTRICTION 4 -OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN) EXHIBtT I- SAME SOURCE H - OTHER (EXPLAIN) i

_ . _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ _ _ _ . -.-c. ~-. - . .~m. . _ . - _ - - . . - .