ML20116M170
Jump to navigation
Jump to search
| ML20116M170 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 06/30/1996 |
| From: | PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | |
| Shared Package | |
| ML20116M155 | List: |
| References | |
| NUDOCS 9608200057 | |
| Download: ML20116M170 (1) | |
Text
- _.. _..
CORRECTIONS TO JUNE 1996 DATA DOCKET No.
50-278 UNIT:
Peach Bottom Unit 3
- 1. Correction to OPERATING DATA REPORT j
- 16. GROSS THERMAL ENERGY GENERATED (MWH) = 1,880,037 2.
Correction to UNIT SHUTDOWNS AND POWER REDUCTIONS Number 16 Duration (Hours) = 107 1
i T
I 1
9608200057 960808 PDR ADOCK 05000277 R
PDR i