Peach Bottom Atomne Power Station PECO NUCLEAR nm o-u, c-<
1848 lay Ikund
[
A Unit of PECO Energy Ma. m 17314 9032 717 4f,0 7014 l
l October 8,1997 U.S. Nuclear Regulatory Commission Document Control Desk i
Washington, D.C. 20555 l
J Docket Nos.60-277 and 60 278 i
Ge9tlemen; Enclosed is the monthly operating report for Pasch Bottom Units 2 and 3 for the month of September 1997 forwarded pursuant to Technical Specification 6.6 4 under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, Wf l-Mark E. Wamer Director, Site Engineering Peach Bottom Atomic Power Station MEW /MJM cmc
'I Enclosures
( p-
'h cc:
W. T. Henrick, Publ4 Service Electric & Gas E. Salowitz, Pubic Service Electric & Gas W.P. Domstfe, Commonwealth of Pennsylvania j
R.I. McLean, State of Maryland
- T.T. Martin, Administrator, Region I, USNRC l
I WL SchmKit, USNRC, Senior Resident inspector l
T. M. Messick Atlante Electric A F Kirby, lit, Delmarva P7.ver & Light INPO Records Center T. N. Mitchell, PECO Nuclear, Vice President, Peach Bottom Atomic Power Station i
1
. 4 % i 'j
-? mi t
9710220184 970930
- t PDR ADOCK 0$000277 R
PURi ccn 9714059
~ _. -
Peach Dottom Atomic Power Staton Unit 2 September i through September 30,1997 l
1.
Hanstive Summary of OMratinafJpptangsj r
Unit 2 began the month of September at a nominal 100% of rated thermal power (RTP).
On September 12,1997 at 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, power was reduced to 67% of RT P for MSIV streking, waterbox cleanmg, ai d S03AM timing Power was restored to 100% RTP on September i4,1997 at 1000 hours0.0116 days <br />0.278 hours <br />0.00165 weeks <br />3.805e-4 months <br />.
Unit 2 ended this month operating at 100% RTP,
~
-.~. -. -
Attachment to Monthly Operating Report for Sertomber 1997
+
UNIT 2 REFUEUNO INFORinATiON 1.
Name of facility; Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
l a
- Reload 12 is scheduled for October 2,1998.
i 3.
Scheduled date for restart following refueling:
Restart following refueling forecast for October 30,1998.
4.
Will refueling or resumption of operation therefore require a technical specification change or other -
1 license amendment?
N/A
+
If answer is yes, what, in general, will these be?
N/A 5.
Scheduled date(s) for submitting proposed licensing action and supporting information:
6 Important licensing considerations associated with refueling, e g, new or different fuel design or suppler, unreviewed design or performance analysis methods, significant changes in fuel design,
' new operating procedures:-
7, The number of fuel asumbles (a) in the core and (b) in the spent fuel storage pool:
(a) Core-764 Fuel Assemblies (b) Fuel Pool-2720 Fuel Assembles,52 Fuel Rods 1
4
.mvr--.
v--,,-y.,-ww
,,%,-+
4-~,em.-4 r
2.3 4.
..,e..
,ew 9_,-..-
. +
,,w
i Docket No. 50-877 Attachment to l
Monthly Operating l
Report for September 1997 Page 2 r
UNIT 2 RRUELING MORMATION (continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed i
storage capacrty that has been requested or is planned, in number of fuel assembles:
l l
The spent fuel pool storage capacity has been rehcensed for 3819 fuel assemblies.
9.
- The projected date of the last refueling that can be dscharged to the spent fuel pool assuming the present capacity:
1 September 2002 without full core offload capability.
September 1998 with full core offload capability.
4 1
1 t
i 1
s T
1 4
d i
d g-s,..--y.
. _.. ~.
._..y.,-y..
-,,.,-e.n,v.,.,..,,.-,-.*,.,..-,ye,,-.
.,,c.,,ye.,-.---m-,.e-ww--,,-,,w,,,mm.--
,,-,,*..w,-,,4..,%,,-
.-,.,,,.....-,..m,-n..-,
AVERAGE DAILY POWER LEVEL DOCKETNO. 50-277 UNTT t*EACH BOTTCed UNIT 2 -
DATE OCTOBER 8.1957.
COh5'ANY PECO ENERGY COtFANY E. A.CLHN90G BuSeeESS N StTE SUPPORT DMS3ON PEACH BOTTott ATCamC POWER STATION TELEPHCNE (717)45tL3412 MO*(TH SEPTEMBER,1997 DAY AVERAGE DARY POWER LEVEL DAY AVERAGE DA:LY POWER LEkEL ME-NET)
(MWE-NET) 1 1108 17 1116 2
1103 18 1112 3
1112 19 1120 4
1112 23 1116 5
1116 21 1120 6
1108 22 1108 7
1117 23 -
1120 8
1108 24 1116 9
1112 25 1124 10 1106 26 1116 11 1112 27 1t20 12 1108 23 1112 13 742 29 1121 14 1059 30 1116 15 1116 16 1108 4
s
+
=
y rv-
~
g
,y
OPERATING DATA REPORT DOCKET NO. 50 -277 DATE OCTOBER 8,1997 COMPLETED BY PECO ENERGY COMPANY E. A. DUNNING BUS: NESS SERVICES SITE SUPPORT DMSION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717)456 3412 CPERATING STATUS
- 1. UNIT NAME:. _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _P_:'A_ C_ H_ B_ O_ T_T_O_M U.N_IT_ 2_
- 2. REPORTING PERIOD: _ _, _, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _, _,, _ _SEPTEMB_E_R,1_997
- 3. LICENSED THERMAL POWER (MWT)., _ _ _ _, _ _ _,, _ _,, _ _ _ _._ _ _ _ _ _ _ _ _, _ _3458 4 NAMEPLATE RATING (GROSS MWE): __ _ __ __ _,_ _ ___ __ _ ____ __ __ _ __ _ _1221
- 5. DESIGN ELECTRICAL RATING (NET WE): _________________________,11_19 6 MAXtMUM DEPENDABLE CAPACITY (GROSS WE): ____,,,__ ________,__,1159
- 7. MADMUM DEPENDABLE CAPACITY (NET MWE)-,_____________, __,____1093
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7 ) SINCE LAST REPORT, GIVE REASONS:
- 9. POVER LEVELTO WHICH RESTRICTED,IF ANY(NET MWE).
- 10. REASONS FOR RESTRICTK)NS,IF ANY:
THIS MONTH YR-TCM) ATE CUMULATIVE 11, HOURS IN REPORTING PERIOD 720 6,551 203.735
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720 0 6,551.0 137,4865
~ 13. REACTOR RESERVE SHUTDOWN HOURS OO 00 00
- 14. HOURS GENERATOR ON-LINE 720 0 6,551.0 133,328 2 i
- 15. UNIT RESERVE SHUTDOWN HOURS 00 0.0 00
'16. GROSS THERMAL ENERGY GENERATED (MWM) 2,458.469 22,388,131 404,363,711 l
- 17. GROSS ELECTR.lCAL ENERGY GENERATED (MWH) 812,900 7,421,600 132,891,190
- 18. NET ELECTRICAL ENERGY GENERATED (WNH) 791,610 7.232,301 127,698,754 l
PAGE 1 OF 2
h OPERATNG DATA REPORT (CONTINUED)
~
c DOCMET N(1 50 -277 2
4 DATE OCTOBER 8,1997 l
4 t
i THtsh40 NTH YR-TO&.TE CUMULAT1WE '
- 19. UNIT SERVICE FACTOR t00.0 %
100.0 %
e5.4 %
i-
- 20. UNIT AVAILA8tUTY FACTOR 100.0 %
100 0 %
85.4 %
21.' UN T CAPACITY FACTOR (USING MDC NET) -
100.6 %
101.0 %
50.2 %
i
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.3 %
98.7 %
58 3 %
r
- 23. UNIT FORCED OUTAGE RATE
.0 %
_0 %
11.1 %
a
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACHy l
- 25. IF SHUTDOWN AT THE END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP; i
.f f
- 26. UNITS IN TEST STATUS (PRIOR TO CosmERCIAL OPERATIONS):
FORECAST ACHIEVED 1
?
INITIAL CRITICAUTY 09f1673 INITIAL ELECTRICITY 02r181/74 I
f- -
COMMERCIAL OPERATION CDOSi74 1
i
).
i i
i l
t i'
l 1.
-1 1'
1 i
4 PAGE 2 OF 2
.. ~.
a -
-_..,..._m.~._..
... a z_....,
,._.,__,._._..c....._._.,-__-._
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.50-27T UNIT NAASE PEACH BOTTOM UNIT 2 0 ATE OCTOBER 8.199T COMPLETED BY PECO ENERGY COMPANY E. A. DUNNING BUSINESS SERVICES SITE SLPPORT DiVtSION PEACH BOTTOM ATOMIC POW 1ER STATION REPORT MONTH - SEPTEMBER,1997 TELEPHONE F17)4560412 METHOD OF LICENSEE SYSTEM COMPONENT CAUSE AND CORRECTYc TYPE DURATON REASON SHUTTING DOWN EVENT CODE CODE ACTON TO NO.
DATE (1)
(HOURS)
(2)~
REACTOR (3)
REPORTS (4)
(S)
PREVENT RECURRENCE T
970912 S
O,0 B
4 HB XXXXXX MSTV STROKING CONDENSER WATER BOX CLEANING, SCRAM TIMING TOTAL HOURS O0 L
f (T)
(2)
(3)
(4)
F-FORCE 0 REASON METHOD EXHIBIT G-INSTRUCTONS S - SCHEDULED A-EQU!PMENT FAILURE (EXPLA!N) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2-MANUAL SCRAM ENT9Y SHEETS FOR LICENSEE C - REFUELING 3-AUTOMATC SCRAM EVENT REPORT (LER)
D -REGULATORY RESTRICTON 4-OTHER (EXPLAW)
FILE (NUREG4161)
E - OPERATOR TRAINING + LICENSE EXAAR,NATtON F-ADMINISTRATfvE (5)
G-OPERATIONAL ERROR (EXPLAIN)
EXHIBIT I-SAME SOURCE H -OTHER (EXPLA!N)
i 1
t Peach Bottom Atomic Power Station Unit 3 I
September 1 through September 30,1997 i
l I
1 i
1.
Narrative Summary of Operatina Experiences Unit 3 began the month of September at 73% of rated thermal power (RTP) due to coastdown; On September 5,1997 at 1600 houis, power was reduced from 71% to 68% of RTP for rod stroke 4
time testing. Power was restored to 71% on September 7 at 2000 hours0.0231 days <br />0.556 hours <br />0.00331 weeks <br />7.61e-4 months <br />.
Throughout the entire month of September the unit continued coastdown. Unit 3 ended the month operating at 63% of RTP.
t i
l E
i
)
i l
I r
j f
b i
I i
I f
E f
I e,+
wi,, e
++w,.e....-,d9 w-y v.-me.
+,
a f -w e e -,
,c,,e,s.,,,3-.,
.,y-,
pmy,.,
m,+-y---.
n.
,, +-.,, -.,er-m,,,,,, - -
,,-,w,,7,.
,..-,., -r-v w-
~
Dockd No. 50-278 Attachment to Monthly Operating Report for September 1997 i
I UNIT 3 REFUELING INFORMATION 1.
Name of facMy:
Peach Botmm Unit 3 i
2.
Scheduled date for next refuehng shutdown:
)
Reload 11 scheduled for October 3,1997 is in progress 3.
Scheduled date for restart following refueling Restart following refueling scheduled for November 1,1997 l
4.
Will refueling of resumption of operation trwreafter require a technical specification change or other heense amendment?
Yes.
If answer is yes, what, in general, will these be?
- 1. Wde Range Neutron Monitoring Modification 5395. (received)
- 2. Large Primary Containment Purge and Vent isolation Valve Boot Seal Replacement
+
Frequency Change. (received)
- 3. ECCS/EDG Shutdown Specification Change.
- 4. Cycle 12 Safety Limit MCPR Technical Specification Change. (received)
- 5. ECCS Suction Strainer Mod (Determined to be an Unreviewed Safety Question (USO))
5.
Allitems have been submitted.
1 6.
Important heensing considerations associated with refueling, e.g, new or different fuel design or supplier, unreviewed design or performance analysis methods, signrficant changes in fuel design, new operating procedures:
N/A 7.
The numbs.. of fuel assembles (a) in the core and (b) in the spent fuel storage pool:
(a) Core.764 Fuel Assembles q
(b) Fuel Pool. 2777 Fuel Assembles,16 Fuel Rods (292 new 3R11 bundles) 7 8.
The present hcensed spent fuel pool storage capacity and the stze of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
- The spent fuel pool storage capacity has been relicensed for 3819 fuel ass 9mblies.
Dock;t No. 50-278 Attachment to Monthly Operating Report for August 1997 Page 2 11 FIT 3 REFUEL.ING INFORMATION (Continued) 9, The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
1 September 2003 without full core offload capability.
September 1999 with full core offload capability.
AVERAGE DAILY POVER LEVEL DOCKETNO. 50-278 UNIT PEACH BOTTOM UN:T3 DATE OCTOBER 8,1997 COMPANY PECO ENERGY COMPANY E. A. DUNN'NG BUSINESS SERV.CES SITE SUPPORT DfV. SON
~
FEACH BOTTOM ATOMIC POWER STATCN TELEPHONE. (717) 456-3412 MONTH SEPTEMBER.1997 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER IEVEL (WWE-NEi)
(MWE-NET) 1 734 17 670 2
723 18 666 3
720 19 667 4'
724 20 659 5
711 21 659 6
695 22 647 7
699 23 655 8
C99 24 651 9
699 25 647 10 695 26 646 11 691 27 642 12 686 2B 634 13 687 29 634 14 683 30 630 15 674 16 674 i
OPERATING DATA REPORT DOCxET NO. 50-278 DATE OCTOBER 3.1997 L 6 SY PECO ENERGY COMPANY E. A.DUNNtNG BUSINESS SERVICES SITE SUPPORT OtVISION PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-34t2 OPERATING STATUS
- 1. UNIT NAME, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ PEACH BOTTOM _ UNIT 3 NOTES:
- 2. REPORTING PERCD
_ _, _. _, _, _ _ _ _ _ _ _ _ _ _ _ _ _._ _ _ _ _ _ _ _ _ SEPTEMBER,1997_
- 3. UCENSED THERMAL POWER (MWT). _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _345_3
- 4. NAMEPLATE RATING (GROSS MWE): _ __,____ _ ______ __ ____ _____ __ __1,221 S. DESIGN ELECTRICAL RATING (NET MWE)-
1119 l
1
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):
_.___________________1_15_9_
j
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): _______,_______________1093
{
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (!TEMS 3 THROUGH 7 ) SINCE LAST REPORT. GNE REASONS;
- 9. POWER LE*KL TO WHICH RESTRICTED. IF ANY (hTT MWE):
90 REASONS FOR RESTP1CTIONS.IF ANY:
l THIS MONTH YR-TO CATE CUMULATNE
(
- 91. HOURS IN REPORTING PERIOD 720 6.551 199.631
- 92. NUMBER OF HOURS REACTOR WAS CRITICAL 720 0 6.491.5 136.473 8
- 13. REACTOR RESERVE SHUTDOWN PJURS 00 00 00 94 HOURS GENERATOR ON-LINE T20 0 6,479 0 132.914 2 l
- 95. UNIT RESERVE SHUTDOWN HOU8tS 00 00 00 1
I
- 16. GROSS THERMAL ENERGY GENERATED (MWM) 1.687.145 19.880.883 398,882.851 i
- 17. GROSS ELECTR! CAL ENERGY GENERATED (1WNH) 508.500 6.376.100 130.694.532 F
i
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 487.211 6.180.51T 125,619.058 l
f i
PAGE 1 OF 2 i
~.
OPERATING DATA REPORT (CONTINUED)
' DOCKET NO.
50-2MB DATE OCTOBER 8. 4987 THIS MONTH YR-TO-DATE CUMULATRE
- 19. UNIT SERVICE FACTOR 100 0 %
96 9 %
666%
- 20. UNIT AVJutABtUTY FACTOR 100.0 %
96 9 %
86 6 %
21 UNIT CAPACITY FACTOR (USING MDC NET) 61 9 %
863%
50J %
- 22. UNIT CAPACITY FACTOR (USING DEP NET) 605%
84 3 %
S&7 %
- 23. Ut#7 FORCED OUTAGE RATE
.0 %
t.t %
101 %
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURAT3ON OF EACHT
- 25. IF SHUTDOWN AT THE END OF REPCRT PERIOD. ESTtMATED DATE OF STARTIP
- 25. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONS):
FORECAST ACHIEVED tNrTIAL CRITICAUTY 054mT4 INITIAL ELECTRICITY 090t64 COMMERCIALOPERATION 122374 l
PAGE20F2
iL 6
f I
i t
l' o
m MC E E
C C
a n FU)
Pr.
T iO A
sR R l
E
)o N OL) 5S T
)
t S
4 ROF(6 1
T (E
(
R S TS T1 E
N ATR4 M
REOG A
W I
S A
GPWERPE O
Y E E ESR U T
P I
T C
TR N
NIC I
YTN r
T N
BP RN(
B 3
A CM C E HRTEE H
t T
P SSO E R XONVIL X
I rN M Et T RO R EFEEF E
V U O Cr A
@T U
T d9C VD M NC i 9YG R iO u 1, G OE 2
N E M T i8Rc S vT4 DT R I
1 NCT S FO3 AAN oJ<E!
@.NMS#B6 B-5 E
E EuEt V
H S
DH O DNS C )4 U
E 2C I
GECASE A7 A
w A
UT Et C
r 0E 5POPEBSP(
M I
T A)
.EEY E
M RN O
CIA N MTB N
A S L A A O
R:
TADw H
CXX P
GT i
E T
STE P
t I I S
C4 N
Otr L
L N
LLA(
D E
E AAMR O
D M
T N E DUUOE
)3 O
C D)
ONNTH
(
5 L
i C
P O(
H M AUT s
M C Tl MAO A
E I O
M1234 C
D' ER ME E R
TD)4 E
SO(
W YC S
OP D
E s N
ETT N
SNR 0
A NEO 1T S
EVP CEE A
N U R N
W EA O
X N
D E
W)
)
T F
3 E
IN J
O O(
)N S
f DR I
4 E P N
A.
i D
d O GO A
I
&C L
HIN T P
X C
X 7U E
I TT A E T
(
ET E (S
4+
R I
_ N MU R E E RG O U
H R T EMnEN T
R S
S UR R)
ILO R
A E rLA Y
TAL 7
N F C R ANP 9
O TNGORM0 NA X
9 MA ENINTO E
1, i1 LAT T(
UURhRE R
ME ELA AR R
A PT E
N:
d O UIN FGEMEH B
SQAEEPD PT u
AEMRROA OO i
E - - - - - - - -
N)
RABCDEFGH OS T R I
A U RO U P H
D TNOM T
EP)
R Y0 O
T S
P R
D E
U E
R O
DU L
H E
ED T
L CE A
A RH D
T
)
O U OC FS T
FS o.
. N 4