ML19210D124: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:..!..VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June YEAR 1978 (Revised 11-05-79)
{{#Wiki_filter:. .
    !
                                                      .
                                            .
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June     YEAR 1978 (Revised 11-05-79)
SUBMITTED:
SUBMITTED:
hD dLut>D__._
hD       dLut>D__._
SUPERIffENDENT - OPERATIONS APPROVED: ,R 1367 292 19nn oo 5M
SUPERIffENDENT - OPERATIONS APPROVED:
_.- . - _ - -
                                            ,R 1367 292 19nn oo 5M
4.i b OPERATING DATA REPORT DATE 11-5 74 CO51PLETED BY u _ p PNIison TELEPHONE .700 Ro4-5151 OPERATING STATUS florth Anna Unit 1 Notes Commercial
 
: 1. Unit Name:
                                            - . - _ - -
une, M (Revised)
_.
4 .
i b                 OPERATING DATA REPORT DATE 11-5 74 CO51PLETED BY u _ p PNIison TELEPHONE .700 Ro4-5151 OPERATING STATUS
: 1. Unit Name:           florth Anna Unit 1                                      Notes Commercial
: 2. Reporting Period:
: 2. Reporting Period:
,_6-6-78 0001 3.. Licensed Thermal Power (31Wt):
une, M (Revised)    ,_                                      6-6-78 0001 3.. Licensed Thermal Power (31Wt):           2775                                                   ,
2775 , 947'4. NamepLte Rating (Gross 51We):
: 4. NamepLte Rating (Gross 51We):                 947                                                    '
907 5. Design Electrical Rating (Net SIWE):
: 5. Design Electrical Rating (Net SIWE): 907
920 6. 51aximum Dependable Capacity (Gross 51We):
: 6. 51aximum Dependable Capacity (Gross 51We):               920
893 7. Sf aximum Dependable Capacity (Net 51We):
: 7. Sf aximum Dependable Capacity (Net 51We):
893
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason 3:
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason 3:
N/A , 9. Power Level To which Restricted,if Any (Net 51We):
N/A                                                                           ,
fl/A 10. Reasons For Restri..tions. If Any:
: 9. Power Level To which Restricted,if Any (Net 51We):                     fl/A
N/A This Stonth Yr..to.Date Cumulative 600 600 600 11. Hours in Reporting Period 69.1 597.1 597.I 12. Number Of Ilours Reactor Was Critical 2.9 2.9 2.9 13. Reactor Reserve Shutdown Hours 596.2 596.2 596.2 14. liours Generator On4.Ine
: 10. Reasons For Restri..tions. If Any:                 N/A This Stonth           Yr..to.Date       Cumulative 600                     600               600
: 15. Unit Reserve Shutdown Hours 0 0 0 16. Gmss Thermal Energy Generated (51WH) 1,482,537 1482.537 1.482.537 17. Gros. Electrical Energy Generated (51WH) 480,915_ _ .480.915 480,915 18. Net E!tetrical Energy Generated (SiWH) 449,108 449,108 449,108 99.4 99.4 99.4 19. Unit Service Factor 99 4 99 4 99.4 20. Unit Availability Factor 83.4 83.4 83.4 21. Unit Capacity Factor (Using 5f DC Net) 82.b 82.5 82.5 22. Unit Capac'ty Factor (Using DER Net)
: 11. Hours in Reporting Period
U6 0.6 0.6 23. Unit F(,rced Outage Rate
: 12. Number Of Ilours Reactor Was Critical                        69.1                     597.1             597.I
'24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eacht:
: 13. Reactor Reserve Shutdown Hours                                  2.9                       2.9             2.9
Maintenance, August 1-8, 1978 (7 Days)25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 14. liours Generator On4.Ine                                      596.2                   596.2             596.2
: 20. Units in Test Status (Prior to Commercial Operation):
: 15. Unit Reserve Shutdown Hours                                     0                         0               0
Forecast Achiesed 4-5-78 0716.INITIAL CRITICALITY 4-1/-78 2208 INITIAL ELECTRICITY C05131ERCIAL GetRATION g._g_78 0001 1367'293-(0/77 )}}
: 16. Gmss Thermal Energy Generated (51WH)                   1,482,537             1482.537         1.482.537
: 17. Gros. Electrical Energy Generated (51WH)                 480,915        _ _ .
480.915         480,915
: 18. Net E!tetrical Energy Generated (SiWH)                   449,108                 449,108         449,108
: 19. Unit Service Factor                                            99.4                     99.4             99.4
: 20. Unit Availability Factor                                       99 4                     99 4             99.4
: 21. Unit Capacity Factor (Using 5f DC Net)                          83.4                     83.4             83.4
: 22. Unit Capac'ty Factor (Using DER Net) 82.b                   82.5               82.5 U6                       0.6             0.6
: 23. Unit F(,rced Outage Rate
                                                                                                                '
: 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eacht:
Maintenance, August 1-8, 1978                       (7 Days)
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
: 20. Units in Test Status (Prior to Commercial Operation):                             Forecast         Achiesed 4-5-78
  .
INITIAL CRITICALITY                                                                           0716 INITIAL ELECTRICITY                                                              4-1/-78 2208 C05131ERCIAL GetRATION                                                           g._g_78       0001 1367 '293     -
(0/77 )}}

Revision as of 13:40, 19 October 2019

Revised Monthly Operating Rept for June 1978
ML19210D124
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/05/1979
From: Wil Madison
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML19210D121 List:
References
NUDOCS 7911200558
Download: ML19210D124 (2)


Text

. .

!

.

.

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June YEAR 1978 (Revised 11-05-79)

SUBMITTED:

hD dLut>D__._

SUPERIffENDENT - OPERATIONS APPROVED:

,R 1367 292 19nn oo 5M

- . - _ - -

_.

4 .

i b OPERATING DATA REPORT DATE 11-5 74 CO51PLETED BY u _ p PNIison TELEPHONE .700 Ro4-5151 OPERATING STATUS

1. Unit Name: florth Anna Unit 1 Notes Commercial
2. Reporting Period:

une, M (Revised) ,_ 6-6-78 0001 3.. Licensed Thermal Power (31Wt): 2775 ,

4. NamepLte Rating (Gross 51We): 947 '
5. Design Electrical Rating (Net SIWE): 907
6. 51aximum Dependable Capacity (Gross 51We): 920
7. Sf aximum Dependable Capacity (Net 51We):

893

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason 3:

N/A ,

9. Power Level To which Restricted,if Any (Net 51We): fl/A
10. Reasons For Restri..tions. If Any: N/A This Stonth Yr..to.Date Cumulative 600 600 600
11. Hours in Reporting Period
12. Number Of Ilours Reactor Was Critical 69.1 597.1 597.I
13. Reactor Reserve Shutdown Hours 2.9 2.9 2.9
14. liours Generator On4.Ine 596.2 596.2 596.2
15. Unit Reserve Shutdown Hours 0 0 0
16. Gmss Thermal Energy Generated (51WH) 1,482,537 1482.537 1.482.537
17. Gros. Electrical Energy Generated (51WH) 480,915 _ _ .

480.915 480,915

18. Net E!tetrical Energy Generated (SiWH) 449,108 449,108 449,108
19. Unit Service Factor 99.4 99.4 99.4
20. Unit Availability Factor 99 4 99 4 99.4
21. Unit Capacity Factor (Using 5f DC Net) 83.4 83.4 83.4
22. Unit Capac'ty Factor (Using DER Net) 82.b 82.5 82.5 U6 0.6 0.6
23. Unit F(,rced Outage Rate

'

24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eacht:

Maintenance, August 1-8, 1978 (7 Days)

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
20. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed 4-5-78

.

INITIAL CRITICALITY 0716 INITIAL ELECTRICITY 4-1/-78 2208 C05131ERCIAL GetRATION g._g_78 0001 1367 '293 -

(0/77 )