ML17059B554: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 03/31/1997
| issue date = 03/31/1997
| title = Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1
| title = Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1
| author name = COLEMAN D E
| author name = Coleman D
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  

Revision as of 16:15, 19 June 2019

Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1
ML17059B554
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/31/1997
From: Coleman D
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B552 List:
References
NUDOCS 9705220320
Download: ML17059B554 (2)


Text

OPERATING STATUS Rev.1 OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 4/03/97 PREPARED BY: D.E.Coleman TELEPHONE:

(315)349-2558 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: March 1997 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 642 5.Design Electrical Rating (Net MWe): 613 6.Maximum Dependable Capacity (Gross MWe): 584 7.Maximum Dependable Capacity (Net MWe): 565 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, Date (35 Day Refuel Outage scheduled for March 3, 1997)2160.0 1452.9 0 1445.2 0 2,613,580.0 893,362.0 868,938.0 66.9 66.9 71.2 65.6 2.8 744.0 71.0 0 71.0 0 116)233.0 39,393.0 38,226.0 9.5 9.5 9.1 8.4 0.0 and Duration of Each): 241)417.2 163729.9 1,204.2 159,801.4 20.4 271 820 360 0 I 90,471,818.0 87,730,492.0 66.2 66.2 60.2 58.7 22.2 25.If shutdown At End of Report Period, Estimated Date of Startup: April 18, 1997 9705220320 970512 PDR ADOCK 05000220 R PDR

'i (y L~I'tg~I s()erg I 41 h