ML17059B553: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUSRev.IOPERATING DATAREPORTDOCKETNO.:50-220DATE:3/05/97PREPAREDBY:D.E.ColemanTELEPHONE:
{{#Wiki_filter:OPERATING STATUS Rev.I OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 3/05/97 PREPARED BY: D.E.Coleman TELEPHONE:
(315)349-2558I1.UnitName:NineMilePointUnit//12.Reporting Period:February19973.LicensedThermalPower(MWt):18504.Nameplate Rating(GrossMWe):6425.DesignElectrical Rating(NetMWe):6136.MaximumDependable Capacity(GrossMWe):5847.MaximumDependable Capacity(NetMWe):5658.IfChangesOccurinCapacityRatings(itemsNumber3through7)SinceLastReport,GiveReasons:Notes9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:ThisMonthYr-to-Date Cumulative 1416.01381.901374,202,497,347.0 853,969.0 830,712,0 97.097.0103.895.73.011.HoursinReporting Period672.012.NumberofHoursReactorWasCritical672.013.ReactorReserveShutdownHours014.HoursGenerator On-Line672.015.UnitReserveShutdownHours016.GrossThermalEnergyGenerated (MWH)1,211,908.0 17.GrossElectrical EnergyGenerated (MWH)414,717.0 18.NetElectrical EnergyGenerated (MWH)403,462.0 19.UnitServiceFactor100.020.UnitAvailability Factor100.021.UnitCapacityFactor(UsingMDCNet)106.322.UnitCapacityFactor(UsingDERNet)97.923.UnitForcedOutageRate0.024.Shutdowns Scheduled OverNext6Months(Type,DateandDurationofEach):(35DayRefuelOutagescheduled forMarch3,1997)240,673.2 163658.91,204.2159,730.4 20.4271,704,127.0 90,432,425.0 87,692,266,0 66.466.460.358.822.225.IfshutdownAtEndofReportPeriod,Estimated DateofStartup:97052203%9 970512PDRADQCK05000220.RPDR
(315)349-2558 I 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: February 1997 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 642 5.Design Electrical Rating (Net MWe): 613 6.Maximum Dependable Capacity (Gross MWe): 584 7.Maximum Dependable Capacity (Net MWe): 565 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 1416.0 1381.9 0 1374,2 0 2,497,347.0 853,969.0 830,712,0 97.0 97.0 103.8 95.7 3.0 11.Hours in Reporting Period 672.0 12.Number of Hours Reactor Was Critical 672.0 13.Reactor Reserve Shutdown Hours 0 14.Hours Generator On-Line 672.0 15.Unit Reserve Shutdown Hours 0 16.Gross Thermal Energy Generated (MWH)1,211,908.0 17.Gross Electrical Energy Generated (MWH)414,717.0 18.Net Electrical Energy Generated (MWH)403,462.0 19.Unit Service Factor 100.0 20.Unit Availability Factor 100.0 21.Unit Capacity Factor (Using MDC Net)106.3 22.Unit Capacity Factor (Using DER Net)97.9 23.Unit Forced Outage Rate 0.0 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): (35 Day Refuel Outage scheduled for March 3, 1997)240,673.2 163658.9 1,204.2 159,730.4 20.4 271,704,127.0 90,432,425.0 87,692,266,0 66.4 66.4 60.3 58.8 22.2 25.If shutdown At End of Report Period, Estimated Date of Startup: 97052203%9 970512 PDR ADQCK 05000220.R PDR
~0}}
~0}}

Revision as of 23:19, 7 July 2018

Revised Monthly Operating Rept for Feb 1997 for Nine Mile Point Nuclear Station,Unit 1
ML17059B553
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 02/28/1997
From: COLEMAN D E
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B552 List:
References
NUDOCS 9705220319
Download: ML17059B553 (2)


Text

OPERATING STATUS Rev.I OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 3/05/97 PREPARED BY: D.E.Coleman TELEPHONE:

(315)349-2558 I 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: February 1997 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 642 5.Design Electrical Rating (Net MWe): 613 6.Maximum Dependable Capacity (Gross MWe): 584 7.Maximum Dependable Capacity (Net MWe): 565 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 1416.0 1381.9 0 1374,2 0 2,497,347.0 853,969.0 830,712,0 97.0 97.0 103.8 95.7 3.0 11.Hours in Reporting Period 672.0 12.Number of Hours Reactor Was Critical 672.0 13.Reactor Reserve Shutdown Hours 0 14.Hours Generator On-Line 672.0 15.Unit Reserve Shutdown Hours 0 16.Gross Thermal Energy Generated (MWH)1,211,908.0 17.Gross Electrical Energy Generated (MWH)414,717.0 18.Net Electrical Energy Generated (MWH)403,462.0 19.Unit Service Factor 100.0 20.Unit Availability Factor 100.0 21.Unit Capacity Factor (Using MDC Net)106.3 22.Unit Capacity Factor (Using DER Net)97.9 23.Unit Forced Outage Rate 0.0 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): (35 Day Refuel Outage scheduled for March 3, 1997)240,673.2 163658.9 1,204.2 159,730.4 20.4 271,704,127.0 90,432,425.0 87,692,266,0 66.4 66.4 60.3 58.8 22.2 25.If shutdown At End of Report Period, Estimated Date of Startup: 97052203%9 970512 PDR ADQCK 05000220.R PDR

~0