ML17059B553: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:OPERATING | {{#Wiki_filter:OPERATING STATUS Rev.I OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 3/05/97 PREPARED BY: D.E.Coleman TELEPHONE: | ||
(315)349- | (315)349-2558 I 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: February 1997 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 642 5.Design Electrical Rating (Net MWe): 613 6.Maximum Dependable Capacity (Gross MWe): 584 7.Maximum Dependable Capacity (Net MWe): 565 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 1416.0 1381.9 0 1374,2 0 2,497,347.0 853,969.0 830,712,0 97.0 97.0 103.8 95.7 3.0 11.Hours in Reporting Period 672.0 12.Number of Hours Reactor Was Critical 672.0 13.Reactor Reserve Shutdown Hours 0 14.Hours Generator On-Line 672.0 15.Unit Reserve Shutdown Hours 0 16.Gross Thermal Energy Generated (MWH)1,211,908.0 17.Gross Electrical Energy Generated (MWH)414,717.0 18.Net Electrical Energy Generated (MWH)403,462.0 19.Unit Service Factor 100.0 20.Unit Availability Factor 100.0 21.Unit Capacity Factor (Using MDC Net)106.3 22.Unit Capacity Factor (Using DER Net)97.9 23.Unit Forced Outage Rate 0.0 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): (35 Day Refuel Outage scheduled for March 3, 1997)240,673.2 163658.9 1,204.2 159,730.4 20.4 271,704,127.0 90,432,425.0 87,692,266,0 66.4 66.4 60.3 58.8 22.2 25.If shutdown At End of Report Period, Estimated Date of Startup: 97052203%9 970512 PDR ADQCK 05000220.R PDR | ||
~0}} | ~0}} |
Revision as of 23:19, 7 July 2018
ML17059B553 | |
Person / Time | |
---|---|
Site: | Nine Mile Point |
Issue date: | 02/28/1997 |
From: | COLEMAN D E NIAGARA MOHAWK POWER CORP. |
To: | |
Shared Package | |
ML17059B552 | List: |
References | |
NUDOCS 9705220319 | |
Download: ML17059B553 (2) | |
Text
OPERATING STATUS Rev.I OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 3/05/97 PREPARED BY: D.E.Coleman TELEPHONE:
(315)349-2558 I 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: February 1997 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 642 5.Design Electrical Rating (Net MWe): 613 6.Maximum Dependable Capacity (Gross MWe): 584 7.Maximum Dependable Capacity (Net MWe): 565 8.If Changes Occur in Capacity Ratings (items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 1416.0 1381.9 0 1374,2 0 2,497,347.0 853,969.0 830,712,0 97.0 97.0 103.8 95.7 3.0 11.Hours in Reporting Period 672.0 12.Number of Hours Reactor Was Critical 672.0 13.Reactor Reserve Shutdown Hours 0 14.Hours Generator On-Line 672.0 15.Unit Reserve Shutdown Hours 0 16.Gross Thermal Energy Generated (MWH)1,211,908.0 17.Gross Electrical Energy Generated (MWH)414,717.0 18.Net Electrical Energy Generated (MWH)403,462.0 19.Unit Service Factor 100.0 20.Unit Availability Factor 100.0 21.Unit Capacity Factor (Using MDC Net)106.3 22.Unit Capacity Factor (Using DER Net)97.9 23.Unit Forced Outage Rate 0.0 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): (35 Day Refuel Outage scheduled for March 3, 1997)240,673.2 163658.9 1,204.2 159,730.4 20.4 271,704,127.0 90,432,425.0 87,692,266,0 66.4 66.4 60.3 58.8 22.2 25.If shutdown At End of Report Period, Estimated Date of Startup: 97052203%9 970512 PDR ADQCK 05000220.R PDR
~0