ML20151C163: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 25: Line 25:
Inspection No. 70-1100/88-04 This refers to the routine safeguards inspection conducted by Mr. A. Della Ratta of this office on February 29 - March 4, 1988 of activities authorized by NRC License No. SNM-1067 and to the discussions of our findings held by Mr. Della Ratta with Messrs. R. Sheeran and D. Parks of your staff at the conclusion of the inspection.
Inspection No. 70-1100/88-04 This refers to the routine safeguards inspection conducted by Mr. A. Della Ratta of this office on February 29 - March 4, 1988 of activities authorized by NRC License No. SNM-1067 and to the discussions of our findings held by Mr. Della Ratta with Messrs. R. Sheeran and D. Parks of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.                  ,
Areas examined during this inspection are described in the NRC Region I Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.                  ,
t Our inspector also verified the steps you have taken to correct the violation brought to your attention in our letter dated September 3, 1987. We have no further questions regarding your action at this time.
t Our inspector also verified the steps you have taken to correct the violation brought to your attention in our {{letter dated|date=September 3, 1987|text=letter dated September 3, 1987}}. We have no further questions regarding your action at this time.
Within the scope of this inspection, no violations were observed.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required. Your cooperation with us.is appreciated.          ;
No reply to this letter is required. Your cooperation with us.is appreciated.          ;

Latest revision as of 05:46, 11 December 2021

Forwards Safeguards Insp Rept 70-1100/88-04 on 880229-0304. No Violations Noted
ML20151C163
Person / Time
Site: 07001100
Issue date: 04/04/1988
From: Bellamy R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mcgill P
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
Shared Package
ML20151C167 List:
References
NUDOCS 8804120193
Download: ML20151C163 (2)


Text

'

APR 0 41988 Docket No. 70-1100 Combustion Engineering, Inc.

ATTN: Dr. P. McGill Vice President - Nuclear Fuel -

Nuclear Power Systems - Manufacturing P.O. Box 500 Windsor, Connecticut 06095 Gentlemen:

Subject:

Inspection No. 70-1100/88-04 This refers to the routine safeguards inspection conducted by Mr. A. Della Ratta of this office on February 29 - March 4, 1988 of activities authorized by NRC License No. SNM-1067 and to the discussions of our findings held by Mr. Della Ratta with Messrs. R. Sheeran and D. Parks of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection Report which is enclosed with this letter. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. ,

t Our inspector also verified the steps you have taken to correct the violation brought to your attention in our letter dated September 3, 1987. We have no further questions regarding your action at this time.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us.is appreciated.  ;

Sincerely,  !

Original Signed By:

Ronald R. Bellamy Ronald R. Bellamy, Chief '

Facilities Radiological Safety l and Safeguards Branch Division of Radiation Safety and Safeguards

Enclosure:

NRC Region I Inspection Report Number 70-1100/88-04 ,

i l

OFFICIAL RECORD COPY IR CE 88 0001.0.0 03/31/88 8804120193 8804o4 PDR ADOCK 07001100 ..

08

.,uu C DCD

)

IO88 Combustion Engineering, Inc. 2 cc w/ encl:

Public Document Room (PDR) local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut A.E. Scherer, Director, Nuclear Licensing, C. E.

C. B. Brinkman, Manager, Washington Nuclear Operations, C. E.

bec w/ encl:

Region I Docket Room (with concurrences) l Management Assistant, DRPA (w/o encl) l Rcbert J. Bores, DRSS J. Roth, DRSS N. Ketzlach, NMSS W. Floyd, NMSS l

i l

l I

I

/ M RI: RI SS RI:DRSS De/

htta K mig Bellamy 4/ //88 4// /88 4/\ /88 0FFICIAL RECORD COPY IR CE 88 0002.0.0 03/31/88