ML17059B554: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/1997
| issue date = 03/31/1997
| title = Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1
| title = Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1
| author name = COLEMAN D E
| author name = Coleman D
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:OPERATING STATUS Rev.1 OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 4/03/97 PREPARED BY: D.E.Coleman TELEPHONE:
{{#Wiki_filter:OPERATING DATA REPORT                             DOCKET NO.: 50-220 DATE: 4/03/97 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS Rev.          1
(315)349-2558 1.Unit Name: Nine Mile Point Unit//1 2.Reporting Period: March 1997 3.Licensed Thermal Power (MWt): 1850 4.Nameplate Rating (Gross MWe): 642 5.Design Electrical Rating (Net MWe): 613 6.Maximum Dependable Capacity (Gross MWe): 584 7.Maximum Dependable Capacity (Net MWe): 565 8.If Changes Occur in Capacity Ratings (Items Number 3 through 7)Since Last Report, Give Reasons: Notes 9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr-to-Date Cumulative 11.Hours in Reporting Period 12.Number of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Generated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, Date (35 Day Refuel Outage scheduled for March 3, 1997)2160.0 1452.9 0 1445.2 0 2,613,580.0 893,362.0 868,938.0 66.9 66.9 71.2 65.6 2.8 744.0 71.0 0 71.0 0 116)233.0 39,393.0 38,226.0 9.5 9.5 9.1 8.4 0.0 and Duration of Each): 241)417.2 163729.9 1,204.2 159,801.4 20.4 271 820 360 0 I 90,471,818.0 87,730,492.0 66.2 66.2 60.2 58.7 22.2 25.If shutdown At End of Report Period, Estimated Date of Startup: April 18, 1997 9705220320 970512 PDR ADOCK 05000220 R PDR  
: 1. Unit Name: Nine Mile Point Unit //1
'i (y L~I'tg~I s()erg I 41 h}}
: 2. Reporting Period: March 1997                                                   Notes
: 3. Licensed Thermal Power (MWt):                       1850
: 4. Nameplate Rating (Gross MWe):                         642
: 5. Design Electrical Rating (Net MWe):                   613
: 6. Maximum Dependable Capacity (Gross MWe):             584
: 7. Maximum Dependable Capacity (Net MWe):               565
: 8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted,   If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month           Yr-to-Date       Cumulative
: 11. Hours in Reporting Period                                   744.0              2160.0          241) 417.2
: 12. Number   of Hours Reactor Was Critical                       71.0              1452.9          163729.9
: 13. Reactor Reserve Shutdown Hours                                 0                    0            1,204.2
: 14. Hours Generator On-Line                                       71.0              1445.2          159,801.4
: 15. Unit Reserve Shutdown Hours                                   0                    0                20.4
: 16. Gross Thermal Energy Generated     (MWH)               116) 233.0          2,613,580.0      271 820 360 0    I
: 17. Gross Electrical Energy Generated (MWH)                 39,393.0            893,362.0      90,471,818.0
: 18. Net Electrical Energy Generated (MWH)                   38,226.0            868,938.0      87,730,492.0
: 19. Unit Service Factor                                           9.5                  66.9              66.2
: 20. Unit Availability Factor                                       9.5                  66.9              66.2
: 21. Unit Capacity Factor (Using MDC Net)                           9.1                  71.2              60.2
: 22. Unit Capacity Factor (Using DER Net)                           8.4                  65.6              58.7
: 23. Unit Forced Outage Rate                                       0.0                  2.8              22.2
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
(35 Day Refuel Outage scheduled for March 3, 1997)
: 25. If shutdown At End of Report Period, Estimated Date of Startup: April 18, 1997 9705220320 970512 PDR       ADOCK 05000220 R                           PDR
 
i (y L     ~
I 'tg   ~ I s()   erg I 41 h}}

Latest revision as of 19:00, 4 February 2020

Revised Monthly Operating Rept for Mar 1997 for Nine Mile Point Nuclear Station,Unit 1
ML17059B554
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/31/1997
From: Coleman D
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML17059B552 List:
References
NUDOCS 9705220320
Download: ML17059B554 (2)


Text

OPERATING DATA REPORT DOCKET NO.: 50-220 DATE: 4/03/97 PREPARED BY: D. E. Coleman TELEPHONE: (315) 349-2558 OPERATING STATUS Rev. 1

1. Unit Name: Nine Mile Point Unit //1
2. Reporting Period: March 1997 Notes
3. Licensed Thermal Power (MWt): 1850
4. Nameplate Rating (Gross MWe): 642
5. Design Electrical Rating (Net MWe): 613
6. Maximum Dependable Capacity (Gross MWe): 584
7. Maximum Dependable Capacity (Net MWe): 565
8. If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr-to-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 241) 417.2
12. Number of Hours Reactor Was Critical 71.0 1452.9 163729.9
13. Reactor Reserve Shutdown Hours 0 0 1,204.2
14. Hours Generator On-Line 71.0 1445.2 159,801.4
15. Unit Reserve Shutdown Hours 0 0 20.4
16. Gross Thermal Energy Generated (MWH) 116) 233.0 2,613,580.0 271 820 360 0 I
17. Gross Electrical Energy Generated (MWH) 39,393.0 893,362.0 90,471,818.0
18. Net Electrical Energy Generated (MWH) 38,226.0 868,938.0 87,730,492.0
19. Unit Service Factor 9.5 66.9 66.2
20. Unit Availability Factor 9.5 66.9 66.2
21. Unit Capacity Factor (Using MDC Net) 9.1 71.2 60.2
22. Unit Capacity Factor (Using DER Net) 8.4 65.6 58.7
23. Unit Forced Outage Rate 0.0 2.8 22.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

(35 Day Refuel Outage scheduled for March 3, 1997)

25. If shutdown At End of Report Period, Estimated Date of Startup: April 18, 1997 9705220320 970512 PDR ADOCK 05000220 R PDR

i (y L ~

I 'tg ~ I s() erg I 41 h