ML20155D803: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:~    ~    . . -
                                                                                    M3
                                                  . . ,  _ _ _  .  ._
                              M    D JhTUU ICUTVA.0N
                                        APR 11 1986
Docket No. 50-341
The Detroit Edison Company
ATTN:  Frank E. Agosti
        Vice President
        Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentle.en:
This refers to the reactive physical security inspection conducted by
Messrs. T. J. Madeda and G. L. Pirtle of this office on March 10-14 and
25, 1986, of activities at the Enrico Fermi Atomic Power Plant, Unit 2,
authorized by NRC Operating License No. NPF-33 and to the discussion of our
findings with Mr. F. Agosti and other members of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Notice. A written response
is required.    Our understanding of your immediate corrective actions are
described in Section 7 of the Report Details. Please advise us if our
understanding of your actions is incorrect.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2). This information must be handled and protected in
accordance with the provisions of 10 CFR 73.21. Consequently, the enclosure
to this letter, our report of the inspection, and your response to the
violation (s) identified in the enclosure to this letter will not be placed in
the NRC Public Document Room. Therefore, your statement of corrective action
regarding the violation (s) identified in the enclosure should be submitted as
a separate enclosure to your transmittal letter in the manner prescribed.
The responses directed by this letter and the accompanying Notice are not            \\
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.                        0
  8604170436 860411                                                              '
  hDR ADOCK 05000341 PDR
                                                          Ecclosure contains
                                                          SA'FEGUARDS INFORMATION
                                                          Upon separation this
                                                          page is Decontrolled
                              GA FI~All A 3
                              wnw.,..~
                                              W \l ~OD \/ A"
                                                    '
                                                                          AM
                                                        .      ....i,
                                                                          m.
 
                          p . r. - m . . - - ,      ..- - -,.. . ,--,  n n_e
                          vi o    L_ u u di\LJ J liin U filvin        .
                                                                        v 11
The Detroit Edison Company                  2
                                                                                MR 11 M
We will gladly discuss any questions you have concerning this inspection.
                                                Sincerely,
                                                W. L. Ax    s.n, Chief
                                                Nuclear atIrials Safety
                                                  and Safeguards Branch
Enclosures:
I.  Notice of Violation
2.  Inspection Report
        No. 50-34I/86009(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosures:
L. P. Bregni, Licensing
  Engineer
P. A. Marquardt, Corporate
  Legal Department
Resident Inspector, RIII
IE File
IE/DI/ORPB
IE/ES
NMSS/SGPL
NRR/DL/SSPB
ACRS
cc w/ enclosures, w/o
  UNCLASSIFIED SAFEGUARDS
  INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Ronald Callen, Michigan
  Public Service Commission
Harry H. Voigt, Esq .
Nuclear Facilities and
  Environmental Monitoring
  Section
Monroe County Office of
  Civil Preparedness                                      Ecclosure contains
                                                            SAFEGUARDS INFORMATION
                                                            Upon separation this
                                                            page is Decontrolled
RIII                                                                    RIII I
  mu
Madeda/jp
                    III
                      y
                      rtle
                                    Rill
                                    reed
                                                    R
                                                  bWrL'4
                                                        gn              Axelson
                                                                                  bg7
  Hb/1'                    Oir"mianNN                ornn      gt  n-          (  h
                          Ons Luuniuo                u una            un \o
                                                                                        ,
}}
}}

Latest revision as of 18:31, 17 December 2020

Forwards Reactive Physical Security Insp Rept 50-341/86-09 on 860310-14 & 25 & Notice of Violation.Notice of Violation & Insp Rept Details Withheld (Ref 10CFR73.21)
ML20155D803
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/11/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Agosti F
DETROIT EDISON CO.
Shared Package
ML20155D807 List:
References
NUDOCS 8604170436
Download: ML20155D803 (2)


See also: IR 05000341/1986009

Text

~ ~ . . -

M3

. . , _ _ _ . ._

M D JhTUU ICUTVA.0N

APR 11 1986

Docket No. 50-341

The Detroit Edison Company

ATTN: Frank E. Agosti

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentle.en:

This refers to the reactive physical security inspection conducted by

Messrs. T. J. Madeda and G. L. Pirtle of this office on March 10-14 and

25, 1986, of activities at the Enrico Fermi Atomic Power Plant, Unit 2,

authorized by NRC Operating License No. NPF-33 and to the discussion of our

findings with Mr. F. Agosti and other members of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Notice. A written response

is required. Our understanding of your immediate corrective actions are

described in Section 7 of the Report Details. Please advise us if our

understanding of your actions is incorrect.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Part 73, Title 10, Code of Federal Regulations,

Section 73.21(c)(2). This information must be handled and protected in

accordance with the provisions of 10 CFR 73.21. Consequently, the enclosure

to this letter, our report of the inspection, and your response to the

violation (s) identified in the enclosure to this letter will not be placed in

the NRC Public Document Room. Therefore, your statement of corrective action

regarding the violation (s) identified in the enclosure should be submitted as

a separate enclosure to your transmittal letter in the manner prescribed.

The responses directed by this letter and the accompanying Notice are not \\

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511. 0

8604170436 860411 '

hDR ADOCK 05000341 PDR

Ecclosure contains

SA'FEGUARDS INFORMATION

Upon separation this

page is Decontrolled

GA FI~All A 3

wnw.,..~

W \l ~OD \/ A"

'

AM

. ....i,

m.

p . r. - m . . - - , ..- - -,.. . ,--, n n_e

vi o L_ u u di\LJ J liin U filvin .

v 11

The Detroit Edison Company 2

MR 11 M

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W. L. Ax s.n, Chief

Nuclear atIrials Safety

and Safeguards Branch

Enclosures:

I. Notice of Violation

2. Inspection Report

No. 50-34I/86009(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosures:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

Resident Inspector, RIII

IE File

IE/DI/ORPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq .

Nuclear Facilities and

Environmental Monitoring

Section

Monroe County Office of

Civil Preparedness Ecclosure contains

SAFEGUARDS INFORMATION

Upon separation this

page is Decontrolled

RIII RIII I

mu

Madeda/jp

III

y

rtle

Rill

reed

R

bWrL'4

gn Axelson

bg7

Hb/1' Oir"mianNN ornn gt n- ( h

Ons Luuniuo u una un \o

,