ML20148H445: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 25: Line 25:


==SUBJECT:==
==SUBJECT:==
GENERIC LETTER 83-28, ITEM 2.1, PART 2 By letter dated April 5,1984, you responded to the requirements of Salem ATWS Item 2.1 (Part 2) of our Generic Letter 83-28 as related to Point Beach 1 and 2.
GENERIC LETTER 83-28, ITEM 2.1, PART 2 By {{letter dated|date=April 5, 1984|text=letter dated April 5,1984}}, you responded to the requirements of Salem ATWS Item 2.1 (Part 2) of our Generic Letter 83-28 as related to Point Beach 1 and 2.
Based on our review of your response, we find your program meets the requirements of Item 2.1 (Part 2), Vendor Interface Programs-Reactor Trip System Components, and is therefore acceptable. Our Safety Evaluation documenting our review is enclosed.
Based on our review of your response, we find your program meets the requirements of Item 2.1 (Part 2), Vendor Interface Programs-Reactor Trip System Components, and is therefore acceptable. Our Safety Evaluation documenting our review is enclosed.
The Equipment Classification portion (Part 1) of Item 2.1 is under review and a separate safety evaluation will be sent to you when our review is complete.
The Equipment Classification portion (Part 1) of Item 2.1 is under review and a separate safety evaluation will be sent to you when our review is complete.

Latest revision as of 21:21, 11 December 2021

Forwards Safety Evaluation Accepting 840405 Response to Generic Ltr 83-28,Item 2.1,(Part 2) Re Vendor Interface Programs & Reactor Trip Sys Components
ML20148H445
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/24/1988
From: Wagner D
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20148H450 List:
References
GL-83-28, NUDOCS 8803290426
Download: ML20148H445 (2)


Text

__

. o March 24, 1988

. Docket Nos. 50-266 e DISTRIBUTION:

and 50-301 a poctet F11es.. NRC & Local PDRs PDIII-3~?/f-" XPerkins GHolahan PKreutzer DWagner 0GC-WF1 Mr. C. W. Fay, Vice President EJordan JPartlow Nuclear Power Department ACRS(10) PDIII-3 Gray File Wisconsin Electric Power Company HAbelson 231 W. Michigan Street, Room 308 Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

GENERIC LETTER 83-28, ITEM 2.1, PART 2 By letter dated April 5,1984, you responded to the requirements of Salem ATWS Item 2.1 (Part 2) of our Generic Letter 83-28 as related to Point Beach 1 and 2.

Based on our review of your response, we find your program meets the requirements of Item 2.1 (Part 2), Vendor Interface Programs-Reactor Trip System Components, and is therefore acceptable. Our Safety Evaluation documenting our review is enclosed.

The Equipment Classification portion (Part 1) of Item 2.1 is under review and a separate safety evaluation will be sent to you when our review is complete.

Sincerely, David H. Wagner, Project Manager i Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects

Enclosure:

As stated cc: See next page Office:

JN PD/ DIII-2 LA/PDIII-3 P/PDIII-3 Surname: PXreutzer .h Ae hKPerkins Date: 3 /z4/88 3 /2j/88 g/g488 8803290426 880324 PDR ADOCK0500g6 P

Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:

Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, DC 20037 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director '

for Operations I 799 Roosevelt Road ,

Glen Ellyn, Illinois 60137  !

I Resident Inspector's Office U.S. Nuclear Regulatory Conmission 6512 Nuclear Road Two Rivers, Wisconsin 54241 j

\

_ _ . - -