_ - _ _ _ _ _ _ - _ - -
June 14, 1989 Docket Nos. 50-266 Distribution and 50-301 EDocket File L WSwenson NRC & Local PDRs OGC Mr. C. W. Fcy, Vice President PDIII-3 r/f Edordan Nuclear Power Department MVirgilio BGrimes Wisconsin Electric Power Company JHannon ACRS(10) 231 W. Michigan Street, Room 308 PKreutzer PDIII-3 Gray Milwaukee, Wisconsin 53201
Dear Mr. Fay:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEM 4.5.3, REACTOR VRIP RELIABILITY -- ON-LINE FUNCTIONAL TESTING OF THE REACTOR TRIP SYSTEM (TAC NOS. 54013 and 54014)
Generic Letter 83-28, Item 4.5.3, required confirmation from all licensees and applicants that on-line functional testing of the reactor trip system, including independent testing of the diverse trip feature, was being performed.
By letters dated November 7,1983 and April 11, 1986, you submitted responses to aeneric Letter 83-28, Item 4.5.3.
Therein you indicated your endorsement of the Westinghouse Owners Group Report WCAP-10271, as being applicable to Point pr.ch Nuclear Plant, Units 1 and 2.
The NRC staff, with the assistance of our contractor, Idaho National Engineering Laboratory, has reviewed your responses and the Westinghouse Owners Group report. We conclude that the existing intervals for on-line functional testing at Point Beach Nuclear Plant are sonsistent with achieving high reactor trip system availability.
The enclosed safety evaluation with the attached contractor's report (EGG-NTA 8341) provides the details and basis for our conclusion. Therefore, we consider Generic Letter 83-28, Item 4.5.3 to be complete.
This completes all staff activities related to TAC Nos. 54013 and 54014.
S ir.cerely,
/s/
Warren H. Swenson, Project Manager Project Directorate III-3 Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated OM lf cc w/ enclosure:
See next page Office:
LA/PDIII-3 PM ' I -3 Pd7/ 0 II-3 Surname: <PKtdtzer WSwen on/mr JHannon Date:
4 /y /89 f /J /89
/q/89 kl" 8906220351 890614 PDR ADOCK 05000266 P
I
+
l Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:
Mr. Bruce Churchill, Esq.
Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.
Washington, DC ~20037 Mr. Janes J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 i
Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 79P Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road 1
Two Rivers, Wisconsin 54241 l
4 l
I
- - a