ML20244C016

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Repts 50-266/89-17 & 50-301/89-16 on 890509-12 & Notice of Violation.Notice of Violation & Rept Details Withheld (Ref 10CFR73.21)
ML20244C016
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/26/1989
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20244C018 List:
References
NUDOCS 8906140095
Download: ML20244C016 (2)


See also: IR 05000266/1989017

Text

- ___ _ _ - _ -

A

on-

-

  • :- men,sn 1%si, n-- n a

e ' T, On UUN~\J0-  ;)EU T V M V 1

'

MAY 2 61989

,#

.

0 Docket No. 50-266

Docket No. 50-301

Wisconsin Electric Power Company

ATTN: Mr. C. W. Fay

Vice President

Nuclear Power

231 West Michigan Street.- P379

Milwaukee, WI 53201

Gentlemen:

This refers to the routine safeguards inspection conducted by Mr. T. J. Madeda-

of this office on May 9-12,.1989 of activities at the Point Beach Nuclear Power

Plant authorized by NRC Operating Licenses No. DPR-24 and No. DPR-27 and to

the discussion of our findings with Mr. G. Maxfield and other members of your

staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

-the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

1.nterviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice. With respect to

Item a, the' inspection showed that actions had been taken to correct the

identified violation and to prevent recurrence. Our understanding of your

corrective actions-is described in Paragraph Sa of the enclosed inspection

report. Conaquently, no reply to the violation is required and we have no

further questions regarding this matter at this time. Regarding the remaining

violation, a written response is required.

Paragraph 2.b of the Report Details identifies a weakness with your perimeter

alarm system. We request a written response within 30 days after receipt of

this report of actions taken or planned to improve the effectiveness of your

perimeter alarm system.

Areas. examined during this inspection concern a subject matter which is

exempt from disclosure according to Part 73, Title 10, Code of Federal

Regulations, Section 73.21(c)(2). This information must be handled and

protected in accordance with the provisions of 10 CFR 73.21. Consequently,

the enclosure to this letter, our report of the inspection, and your response

to the violation identified in the enclosure to this letter will not

4

8906140095 890526 & 1 sure Contains I

(

PDR ADOCK 05000266 SAFEGUARDS INFORMATION

Q PDC Upon Separation This

pg-- 3y .nir n mneA- n s hce Is Decontrolled

,, i  ? .pug vo

l A ) .N ,lli V 'ilVlh U 1

_ _ _ _ _ _ _ _ ___________-_--_______-- _ __ _ _ -

4"

3 - m %,..__

-

~ . . . . .

.

,

,

DWCUJhny3 uiQi UkWh lUn i

. ,

-

Wisconsin Electric Power Company 2 MAY 2 61989 l

be placed in the NRC Public Document Room. _Therefore, your statement of

corrective action regarding violation b identified in the enclosure should

be.' submitted as a separate enclosure to your transmittal letter in the manner

prescribed. l

The responses directed by this letter and the accompanying Notice are-not

subject to the clearance procedures of the Office of Management and Budget ,

as required by the Paperwork Reduction Act of 1980, PL 96-511. i

We will gladly _ discuss any questions you have concerning this inspection.

Sincerely,

P

L. Robert Greger, Chief

Reactor Programs Branch

Enclosures:

1. Notice of Violation l

2. Inspection Reports ,

No. 50-266/89017(DRSS)

'

No. 50-301/89016(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

l

cc w/ enclosures:

'

J. J. Zach, Plant Manager l

NRR/DRIS/SGB )

NRR/DRIS/ SIB

NRR/DLPQ/PEB

cc e/ enclosures, w/o

UNCLASSIFIED SAFEGUARDS i

INFORMATION

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII i

Virgil Kanable, Chief

Boiler Section

Charles Thompson, Chairman

Wisconsin Public Service

Commission

R. I. Braund (SLO),

WI Div. of Emergency Government

Lawrence J. McDonnell, Chief

Radiation Protection Section

WI Department of Health and

Social Services, Division

of Health

nelosure contains

SAFEGUARDS INFORMATION

RIII g RIII RI R

Upon separation This

- Page Is m on m W

Ma eda /cg r ve ayette

cmacerean a a - T/24 - -- __

\

\