Forwards Insp Repts 50-266/98-22 & 50-301/98-22 on 981208-10.No Violations Noted.Concludes That Licensee Carried Out Properly Addressed Findings of Maint Rule Baseline Insp
ML20198K691
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/24/1998
From: James Gavula
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddemann M
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20198K695 List:
References
50-266-98-22, 50-301-98-22, NUDOCS 9812310131
Download: ML20198K691 (3)


See also: IR 05000266/1998022

Text

_ _ _ _ . . _ _ _ ._ _ _ _ _ _ _ .. _ _ _ _ . __.

.

December 24, 1998

l

l Mr. M. Reddemann

'

Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road

.

Two Rivers, WI 54241

i

SUBJECT: NRC INSPECTION REPORT 50-266/98022(DRS); 50-301/98022(DRS)

I Dear Mr. Reddemann:

l On December 10,1998, the NRC completed a follow-up inspection of your implementation of

l 10 CFR 50.65, " Requirements for Monitoring the Effectiveness of Maintenance at Nuclear

Power Plants," (the maintenance rule) at the Point Beach Nuclear Plant. The enclosed report i

presents the results of that inspection.

I

No violations of NRC requirements were identified. We concluded that actions your staff carried  !

I

out properly addressed the findings of our Maintenance Rule Baseline Inspection, and that the

Point Beach maintenance rule program met all requirements of the maintenance rule.

]

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the l

enclosure will be placed in the NRC Public Document Room. '

l We will gladly discuss any questions you have conceming this inspection.

l

Sincerely,

Original /s/ J. M. Jacobson for

l James A. Gavula, Chief

I

Engineering Specialists Branch 1

Division of Reactor Safety

Docket Nos.: 50-266;50-301

License Nos.: DPR-24; DPR-27

Enclosure: Inspection Report 50-266/98022(DRS); )

50-301/98022(DRS)

l

l

See Attached Distribution

Document: G:\DRS\ pol 98022.wpd *See Previous Concurrence

To recorvo e copy of this document. inchcote in the bou "C" * Copy wimout auchment/enclosee "E's Copy with attachment / enclosure 'N'si No copy

i OFFICE Rill

l Rlli

Rll! W(N l l

\ NAME Farber/sd Burgess Gavi/a W \ A.e /

DATE 12/2:19 8 12/23/98 12/d98 % ) "

OFFICIAL RECORD COPYQ

'

l 9812310131 981224

l PDR ADOCK 05000266

G PDR
. -

._. . . _.. . _ ._ _ ,__ - __

i

. l

'

-

1 l

l

l Mr. M. Reddemann

l Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road

l

Two Rivers, WI 54241

l

'

SUBJECT: NRC INSPECTION REPORT 50-266/98022(DRS); 50-301/98022(DRS)

! Dear Mr. Reddemann:

On December 10,1998, the NRC completed a follow-up inspection of your implementation of

l 10 CFR 50.65," Requirements for Monitoring the Effectiveness of Maintenance at Nuclear

Power Plants,"(the maintenance rule) at the Point Beach Nuclear Plant. The enclosed report

presents the results of that inspection.

No violations of NRC requirements were identified. We concluded that actions your staff carried

out properly addressed the findings of our Maintenance Rule Baseline inspection, and that the

Point Beach maintenance rule program met all requirements of the maintenance rule.

dd

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this lette

enclosure [:-d yar rspense will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

l

James A. Gavula, Chief

'

Engineering Specialists Branch 1

Division of Reactor Safety

Docket Nos.: 50-266; 50-301

License Nos.: DPR-24; DPR-27

Enclosure: Inspection Report 50-266/98022(DRS);  !

50-301/98022(DRS)

See Attached Distribution

Document: G:\DRS\ pol 98022.wpd

TO receeve a copy of this document. IndCale in the bos 'C's Copy without 8ttachmentlenclosure 'E's Cooy eth attachmentienclosure 'N's No copy

OFFICE Rlli f Rill 6 Rlli l l

NAME Farber/sd /W(P Burgess mK/n Gavuta

DATE 12/18/98 12/21/98 12/ /98

( OFFICIAL RECORD COPY

l

I

1 . .. _ ._ . _._ __ _ . . _ _ _ _ _ _ _ . . _ _ _ _ _ _ . . _ _ _ _ . . . _ . - _ _ __ .

..+

y .

i

M. Reddemann ' -2-

l: .

'

!

'

cc w/ encl: R. Grigg, President and Chief

Operating Officer, WEPCO

M. Sellman, Chief Nuclear Officer -

. R. Mende, Plant Manager

J. O'Neill, Jr., Shaw, Pittman,

- . Potts & Trowbridge

K. Duveneck, Town Chairman

L <

. Town of Two Creeks

>

B. Burks, P.E., Director

Bureau of Field Operations

_

,

J. Mettner, Chairman, Wisconsin

4

Public Service Commission

.S. Jenkins, Electric Division -

Wisconsin Public Service Commission

l State Liaison Officer

i. Distributigo:

'

CAC (E-Mail)

RPC (E-Mail) -

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enci -

C, Pederson, Rill w/enci

. B.' Clayton, Rlli w/enci '

!

SRI Point Beach w/enci -

DRP w/enci

TSS w/enci

'

. DRS (2) w/enci

Rlli PRR w/enci

M PUBLIC IE-01 w/enci?

Docket File w/enci

GREENS 1

IEO (E-Mail)

DOCDESK (E-Mail) -

t

i

1

L i

L b1007?

L

.

. . . -. . - - . _ _-