I l
5" p
t UNITED STATES o
g
.j NUCLEAR REGULATORY COMMISSION 2
WASHINGTON D.C. 20565-0001 O
%*****/
August 4, 1999 Mr. N. J. Liparulo, Manager of Equipment Design and Regulatory Engineering Westinghouse Electric Company LLC P. O. Box 355 Pittsburgh, PA 15230-0355
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NOS.
MA5939 AND MA5940)
REF:
CAW 99-1335, letter from J.S. Gatembush, Westinghouse, to NRC, dated May 11,1999
Dear Mr. Liparulo:
By Wisconsin Electric's (WE's) application for amendment dated June 22,1999, and Westinghouse Electric Company's affidavit dated May 14,1999, executed by J. S. Galembush, WE submitted WCAP-14787, " Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wisconsin Electric Power Company, Point Beach Units 1 and 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power)," dated April 1999, and requested that it be withheld from public disclosure pursuant to 10 CFR 2.790. A nonproprietary version was submitted for placement in the NRC public document room.
The affidavit stated that the submitted information should be consict
- xempt from rnandatory public disclosure for the following reasons:
1.
The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.) where prevention of its use by any of Westinghouse's competitors without license from Westinghouse constitutes a competitive economic advantage over other companies.
2.
Its use by a competitor would reduce his expendit6re of resources or improve his competitive position in the design, manufacture, sh!pment, installation, assurance of quality, or licensing a similar product.
3.
The information is part of that which will enable Westinghouse to (a) provide documentation of the analysis and methods for determining operating parameter i
uncertainties, (b) calculate information which is used in the thermal analysis of the Q
nuclear fuel, and (c) assist the customer in obtaining NRC approval. Westinghouse plans to sell the use of similar information to its customers for purposes of meeting NRC
/(M requirements for licensing documentation and sell support and defense of the technology to its customers in the licensing process.
9908100061 990804 PDR ADOCK 05000266 P
PDR j
E j' :
f..
N!J. Liparulo August.4, 1999 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information (WCAP-14787, " Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wisconsin Electric Power l
Company, Point Beach Units 1 and 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power)")
l marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) l and Section 103(b) of the Atomic Energy Act of 1954, as amended.
t i
Withholding from public inspection shall not affect the right, if any, of persons properly and I
directly concerned to inspect the documents. If the need arises, we may send copies of this l
infc/nnation to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary infonr.ation.
l-if the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC You also should understand that the NRC may have cause to review
' this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
l l
If you have any questions regarding this matter, I may be reached at 301-415-1355.
l l
Sincerely, l
Original signed by:
l Beth A. Wetzel, Senior Project Manager, Section 1 l
Project Directorate lil Division of Licensing Project Management j
Office of Nuclear Reactor Regulation l
Docket Nos. 50-266 and 50-301 l-cc: See next page h
b l
DISTRIBUTION:
I Docket File PUBLIC l
PD3-1 r/f R. Lankbury, Rlll io receive a copy or mis accument. Inmcate v in me oox OFFICE PDlli-1/PM C PDIV-D/LA (, C SRfB/C, C OGC C PDill-1/SC
]
h MPSIebi'of NCraigMb NAME BWetzel:(2)k CJamerson h/
JW DATE t / A /99i -.7 /SV /99
- 7) 24/99 D /N/99
[ / / /99
(
DOCUMENT NAME: G:\\PDill-1\\PTBEACH\\ PRO 990622.wpd OFFICIAL RECOR COPY 0900G0
t
- f N.J. Liparuto
-2 August 4, 1999 We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information (WCAP-14787, " Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wisconsin Electric Power Company, Point Beach Units 1 and 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power)")
marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concemed to inspect the documents. if the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should I
promptly notify the NRC. You also should understand that the NRC may have cause to review I
this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
if you have any questions regarding this matter, I may be reached at 301-415-1355.
Sincerely, Original signed by:
Beth A. Wetzel, Senior Project Manager, Section 1 Project Directorate 111 Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
{
cc: See next page DISTRIBUTION-l Docket File PUBLIC PD3-1 r/f R. Lankbury, Rill l
lo receive a copy of tnis accument, inoicate "c" in tne box OFFICE PDill-1/PM C PDIV-D/LA, C SRfB/C C OGC,
C PDill-1/SC
{
y NAME BWetzel:(2)k CJamerson h/ JW[miMI MPSbief k DCraigHb DATE
'f /8(a /99 7fi#/99
- 7) 24/99
'l / 2 /99
[ / / /99 DOCUMENT NAME: G:\\PDlli-1\\PTBEACH\\ PRO 990622.wpd OFFICIAL RECOR OPY t
E o
4 N.J. Liparulo We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information (WCAP-14787," Westinghouse Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wisconsin Electric Power Company, Point Beach Units 1 and 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power)1 marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a deterrnination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-1355.
Sincerely, h.
b Beth A. Wetzel, Senior Project Manager, Section 1 Project Directorate lil Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: See next page i
F n
b Point Beach Nuclear Plant Units 1 and 2 l
cc:
l Mr. Michael B. Sellman Regional Administrator, Region 111 i
Senior Vice President and U.S. Nuclear Regulatory Commission i
Chief Nuclear Officer 801 Warrenville Road Wisconsin Electric Power Company Lisle, Illinois 60532-4351 l
231 West Michigan Street Milwaukee,WI 53201 Resident inspector's Office U.S. Nuclear Regulatory Commission Mr. J. S. Galembush, Acting Manager 6612 Nuclear Road Regulatory and Licensing Engineering Two Rivers, Wisconsin 54241 Westinghouse Electric Company l
Box 355 Ms. Sarah Jenkins Pittsburgh, PA 15230-0355 Electric Division Public Service Commission of Wisconsin i
Mr. John H. O'Neill, Jr.
P.O. Box 7854 Shaw, Pittman, Potts & Trowbridge Madison, Wisconsin 53707-7854 2300 N Street, NW Washington, DC 20037-1128 Mr. Richard R. Grigg President and Chief Operating Officer Wisconsin Electric Power Company 231 West Michigan Street l
Milwaukee, Wisconsin 53201 Mr. Mark E. Reddemann Site Vice President Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, Wisconsin 54228 l
Chairman Public Service Commission l
of Wisconsin l
P.O. Box 7854 Madison, Wisconsin 53707-7854 October 1998