Forwards Insp Repts 50-266/99-08 & 50-301/99-08 on 990411- 0527.No Violations Noted.Operator Crew Response to Equipment Induced Challenges Generally Good.Handling of Steam Plume in Unit 1 Turbine Bldg Particularly Good
ML20196D493
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/18/1999
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddemann M
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20196D497 List:
References
50-266-99-08, 50-266-99-8, 50-301-99-08, 50-301-99-8, NUDOCS 9906240288
Download: ML20196D493 (2)


See also: IR 05000266/1999008

Text

-

.

June 18, 1999

t

Mr. M. Reddemann

Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road

Two Rivers, WI 54241

SUBJECT:

POINT BEACH INSPECTION REPORT 50-266/99008(DRP); 50-301/99008(DRP)

Dear Mr. Reddemann:

This refers to the inspection conducted from April 11 through May 27,1999, at the Point Beach

Nuclear facility.

j

l

During the inspection period, secondary system equipment failures and malfunctions

challenged plant operators. Response to these failures placed a burden on the resources of

the facility. Resources thus diverted were not available to address long-term equipment and

.

program upgrades. As you indicated at the exit meeting for this report, routine plant

engineering and maintenance efforts should be focused on identifying vulnerabilities and

preventing failures, so that other resources are not diverted from safety significant equipment

and program upgrade projects.

j

i

Operator crew response to equipment-induced challenges was generally good. The handling of

a steam plume la the Unit 1 turbine building was particularly good. The crew responded to tne

abnormal condition by placing the plant in a safe condition in accordance with the symptom-

based emergency operating procedures and a conservative operating philosophy. This

response effectively ensured that the public health and safety could not be affected by the

,

'

observed condition, regardless of the initiating equipment failure.

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room.

Sincerely,

/s/ R. IarAsbury

Roger Lanksbury, Chief

Reactor Projects Branch 5

Docket Nos. 50-266; 50-301

License Nos. OPR-24; DPR-27

Enclosure:

Inspection Report 50-266/99008(DRP);

50-301/99008(DRP)

Spe Attachtsd Distribution

DOCUMENT NAME: G:\\POIN\\ pol 99008.DRP

To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"

gy

DFFICE

Rlli

l6

Rlli

lN

l

l

NAME

Kunowskik;jp55I b

Lanksbury R.h L

DATE

06/is/99

06/8/99

~

OFFICIAL RECORD COPY

9906240288 990618

PDR

ADOCK 05000266

G

PDR

.Z

,e

>

' s :.

.

[H.;.

.,

. . .

i,

'i: i

a

.,

h

?'

'

3

,

'

.

I

+

. M. Reddemann

-2 . '

<

,

i

9

cc w/ encl
R. Grigg, President arid Chief

Operating Officer, WEPCO

M. Sellman, Senior Vee President,

Chief Nuclear Officer .

R. Mende, Plant Manager

]

' . O'Neill, Jr., Shaw, Pittman,

J

Potts & Trowbridge

l

. K. Duveneck, Town Chairman -

Town of Two Creeks

B. Burks, P.E., Director

Bureau of Field Operations

<

J. Mettner, Chairman, Wisconsin

Public Service Commission

S. Jenkins, Electric Division

Wisconsin Public Service Commission

State Liaison Officer

. Distribution:

CAC (E-Mail)

RPC (E-Mail) -

Project Mgr., NRR w/enci

J. Cakhvell, Rlli w/enci

'

jf

B. Clayton, Rlli w/enci

SRI Point Beach w/ encl

/

.

DRP w/enci

,

DRS w/enct

. Rlli PRR w/enci

,

PUBLIC IE-01 w/enci

'

' Docket File w/enci

GREENS

. LEO (E-Mail)

DOCDESK (E-Mail)

&l00.1 C

J