Forwards Insp Repts 50-266/99-14 & 50-301/99-14 on 990726- 30.Areas Examined within Secutity Program Identified in Rept.No Violations Noted
ML20211K526
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/31/1999
From: Reynolds S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddemann M
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20211K532 List:
References
50-266-99-14, 50-301-99-14, NUDOCS 9909080014
Download: ML20211K526 (3)


See also: IR 05000266/1999014

Text

r;

u

,;

_

L

Augus't 31. 1999

H

E

Mr. M. Reddemann

i

Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road

.Two Rivers, WI 54241

SUBJECT:

NRC INSPECTION REPORT 50-266/99014(DRS); 50-301/99014(DRS)

. Dear Mh Reddemann:

On July 30,1999, the NRC completed an inspection of the physical protection program at your

Point Beach Nuclear Plant. The enclosed report presents the retuits of that inspection.

L

Areas examined within your security program are identified in the report. Within those areas,

L

the inspection consisted of a selective examination of procedures and representative records,

l

observation of performance, and interviews with staff. The objective of the inspection effort was

to determine whether activities authorized by the license were conducted safely and in

!

accordance with NRC requirements.

Based on the results of this inspection, no cited violations of NRC requirements were identified

and the overall effectiveness of your security program continued to be sound.' We noted that

security management's efforts to increase staffing resulted in a significant reduction in the

amount of overtime required to maintain security operations and that this effort greatly improved

'the working environment for security force members.

We also noted that your schedule to replace the existing security computer system has been

{

delayed. At the time of the inspection, we understood that the delay was for a period of

1

approximately two months. Subsequent to the inspection, your staff has informed us that the

delay period has been reduced to approximately one month. The delay was of concern to us

because it is our understanding that the current security computer is not Y2K compliant. It is

!-

our understanding that the new computer will be Y2K compliant and will be fully operational

prior to the end of this year. Your staff's cooperation with us during this inspection was

appreciated.

I

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

Ij

enclosure will be placed in the NRC Public Document Room.

/

.

T.

'

'

\\

o

.

l

!

(

l

\\

[

M. Reddemann

-2-

l

l

l

We will gladly discuss any questions you have conceming this inspection,

k

Sincerely,

j

Original /s/ Steven A. Reynolds

l

Steven A. Reynolds, Deputy Director

Division of Reactor Safety

Docket Nos. 50-266; 50-301

l

License Nos. DPR-24; DPR-27

l

Enclosure:

Inspection Report 50-266/99014(DRS);

l

50-301/99014(DRS)

i'

]

cc w/ encl:

R. Grigg, President and Chief

i

Operating Officer, WEPCo

M. Sellman, Senior Vice President,

Chief Nuclear Officer

l

R. Mende, Plant Manager

J. O'Neill, Jr., Shaw, Pittman,

. Potts & Trowbridge

,

i

K. Duveneck, Town Chairman

l

Town of Two Creeks

B. Burks, P.E., Director

Bureau of Field Operations

J. Mettner, Chairman, Wisconsin

Public Service Commission

S. Jenkins, Electric Division

Wisconsin Public Service Commission

,

State Liaison Officer

See Attached Distribution

,

i

1

i

DOCUMENT NAME: G:DRS\\ pol 99014.wpd

i

To receeve a caer of this document, Indicate in the bar: 'C" = Copy wthout attachm nt/ enclosure T = Copy wth attachment / enclosure T e No copy

I

l

OFFICE

Rlli

(N. -

l

l Rlll Y M

Rlli

d

Rlli

/V

}

NAME

JBelanger:sd

JCree'd

RLanksburyBb4

SReynoldsA

{

!

DATE

08/r f/99

08//7/99

0800/99

08/3(/99

l

OFFICIAL RECORD COPY

!

,

o

'

.

..

,

!

M. Reddemann

-3-

Distnbution:

CAC (E-Mail)

- RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rill w/enci

B. Clayton, Rlll w/enci

SRI Point Beach w/ encl

DRP w/enci

' DRS w/enci

Rlli PRR w/enci -

. PUBLIC IE-01 w/enci

,

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

p ,1If,10

L.