Text
F
1
,
'
.
H
July 28, 1999
j
- -
.
l
'
i
I
Mr. M. Reddemann
Site Vice President
'
Point Beach Nuclear Plant
6610 Nuclear Road
l
Two Rivers, WI 54241
SUBJECT:
POINT BEACH INSPECTION REPORT 50-266/99009(DRP); 50-301/99009(DRP)
Dear Mr. Reddemann:
'
This refers to the inspection conducted on May 28 through July 13,1999, at the Point Beach
Nuclear facility. The enclosed report presents the results of this inspection.
During this inspection period, plant operations were conducted safely, and there were no
significant events or performance problems. The NRC concluded that plant staff had accurately
captured equipment failures and malfunctions in the maintenance rule program, and had
appropriately dispositioned these failures.
Based on the results of this inspection, the NRC has determined that two violations of NRC
requirements occurred. These violations are being treated as Non-Cited Violations (NCVs),
consistent with Appendix C of the Enforcement Policy. These NCVs are described in the
subject inspection report. If you contest the violations or severity level of these NCVs, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
Washington DC 20555-0001, with copies to the Regional Administrator, Region lil, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington,
!'
DC 20555-0001.
,
l
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Document Room.
Sincerely,
Original signed by
'
9908030257 990728
ADOCK 05000266
Roger Lanksbury, Chief
j",
O
Reactor Projects Branch 5
ls
Docket Nos. 50-266; 50-301
j
Enclosure: Inspection Report 50-266/99009(DRP);
,
i
50-301/99009(DRP)
See Attached Distnbution
.
'
i
. DOCUMENT NAME: G:\\POIN\\ pol 99009.DRP
To receive a ce my of this *- ^. Indicate in the box *C" = Copy w/o attach /enct *E" = Copy w/ attach /enci *N" = No copy
li
OFFICE
Rill
E
Rill
W
NAME
Kunowski/mlaA R
LanksburyODF
DATE
07/Tl/99
07/11/99
OFFICIAL RECORD COPY
c
--
-
-
..
F
.
l
.
M. Reddemann
-2-
,
cc w/ encl:
R. Grigg, President and Chief
Operating Officer, WEPCO
M. Sellman, Senior Vice President,
Chief Nuclear Officer
R. Mende, Plant Manager
J. O'Nellt, Jr., Shaw, Pittman,
Potts & Trowbridge
K. Duveneck, Town Chahman
Town of Two Creeks
B. Burks, P.E., Director
Bureau of Field Operations
J. Mettner, Chairman, Wisconsin
Public Service Commission
S. Jenkins, Electric Division
Wisconsin Public Service Commission
State Liaison Officer
Distribution:
CAC (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Caldwell, Rlli w/enct
B. Clayton, Rill w/ encl
SRI Point Beach w/enci
4
DRP w/enci
DRS w/ encl
}
Rlli PRR w/enci
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
,
/
i
?
O30018