Text
(;$%
- y naro
UNITED STATES
,
'o
NUCLEAR REGULATORY COMMISSION
w. 8*
o
REGloN til
t! .
y
801 WARRENvlLLE ROAD
LISLE, ILLINOIS 60532-4351
- s
/
.
'
.....
September 29, 1999
Mr. M. Reddemann
i
Site Vice President
j
1
Point Beach Nuclear Plant
i
6610 Nuclear Road
Two Rivers, WI 54241
SUBJECT:
POINT BEACH INSPECTION REPORT 50-266/99013(DRP);
50-301/99013(DRP)
f
Dear Mr. Reddeniann:
1
,
This refers to the inspection conducted on July 14 through August 30,1999, at the Point Beach
Nuclear facility.
.s
During this period, the plant was operated in a safe manner. Operators responded well to
problems with a Unit 1 instrument air leak and a Unit 2 turbine governor valve position
tiisiomuon. . There were, however, several indications of inattention to detail and poor program
documentation. Examples included the mispositioning of the Unit 2 control rod control selector
switch by an operator and the absence of clear program guidance for measuring the reliability
of the station blackout gas turbine generator auxiliarp support systems. None of the problems
identified during this period had any direct safety consequence, and each was appropriately
entered into your corrective action program for evaluation and resolution.
Based on the results of this inspection, the NRC has determined that one violation of NRC
requirements occurred. This violation is being treated as a Non-Cited Violation (NCV),
consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject
inspection report. if you contest the violation or severity level of the NCV, you should provide a
response within 30 days of the date of this inspection report, with the basis for your denial, to
the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC
20555-0001, with a copies to the Regional Administrator, Region lil, and the Director, Office of
Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001.
I
\\
9910070045 990929
ADOCK 05000266
G
t
'
,
1
r
,
.
M. Reddemann
-2-
In accordance with 10 CFR 2.700 of the NRC's " Rules of Practice," a copy of this letter, its
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Document Room.
.
Sincerely,
.
/s/ R. D. Lanksbury
Roger Lanksbury, Chief
Reactor Projects Branch 5
Docket Nos. 50-266; 50-301
Enclosure:
Inspection Report 50-266/99013(DRP);
50-301/99013(DRP)
cc w/enet:
R. Grigg, President and Chief
Operating Officer, WEPCo
M. Sellman, Senior Vice President,
Chief Nuclear Officer
R. Mende, Plant Manager
J. O'Neill, Jr., Shaw, Pittman,
Potts & Trowbridge
K. Duveneck, Town Chairman
Town of Two Creeks
B. Burks, P.E., Director
Bureau of Field Operations
J. Mettner, Chairman, Wisconsin
Public Service Commission
S. Jenkins, Electric Division
Wisconsin Public Service Commission
State Liaison Officer
DOCUMENT NAME: G:\\POIN\\ pol 99013 DRP.WPD
To receive e copy of this document. Indicate la the bou *C" = Copy without ettechment/ enclosure "E" = Copy with attachment / enclosure
"N" = No copy
OFFICE
Rlli
l6
Rlli
lA
Rill
l /d
l
NAME
Kunowski:co
Shear $4$
Lanksbugy
r#
(R1.1&P1.1)
Dr
DATE
09/$/99
09/#/99
09/2'i/99
r
OFFICIAL RECORD COPY
-
g';#
1
.
i
~
l
i
MS Reddemann -
-3-
Distnbution:
CAC (E-Mail)
RPC (E-Mail)
.
BAW (Project Mgr.)(E-Mail)
J. Caldwell, Rill w/enci
B. Clayton, Rllt w/enci
SRI Point Beach w/enci
DRP w/enci
DRS w/ encl
Rill PRR w/encI
PUBLIC 1E-01 w/enci
Docket File w/enci
GREENS
LEO (E-Mail)