ML20059M097
| ML20059M097 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 09/27/1990 |
| From: | Miller H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20059M100 | List: |
| References | |
| NUDOCS 9010030147 | |
| Download: ML20059M097 (2) | |
See also: IR 05000266/1990018
Text
e-
i
.,'
'
.o
,
SEP 2 71990
-
.
.
,
,
.
'
Docket No. 50-266
Docket No. 50-301
EA 90-159
Wisconsin Electric Power Company
ATTN: Mr. C. W. Fay
,
,
Vice President
Nuclear Power
231 West Michigan Street - P379
Milwaukee, WI
53201
.
Gentlemen:
This refers to the routine safety inspec+ ion conducted by Mr. D. ' M sic of
this office on August 20-24, 1990, of activ:+ies at the Point Bv'-h Httlear
Plant, Units 1 and 2, authorized by NRC Operatti,7 Licenses No. GM !*
% K;.
DPR-27 and to the discussion of our findings with Mr. T. J.' K G
A%
1
of your staff at the conclusion of the inspection.
The purpose
!
- ,
inspection was to follow up previously identified deficiencies t'
-
discussed in Electrical Distribution System functional Inspection
'
Reports No. 50-266/90201 and No. 50-301/90201.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Witnin these areas, the inspection consisted of a selective
,
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements. We are releasing this report at this time for your
information.
Following an Enforcement Conference, you will be notified by
separate correspondence of our decision regarding enforcement actions based
on the findings of this inspection.
No written response is required until ycu
are notified of the proposed enforcement actions,
in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC Public
Document Room.
We will gladly discuss any questions you have concerning this inspection.
.
Sincerely,
0.i!0;5l.L S2NED Bi HLl5EitT J. MLB
pggoogg g ogo b 66
H. J. Miller, Director
Q
PNV
Division of Reactor Safety-
See Attached for Enclosures
.
cc[
and Distribution
l
Rlll
RI 1
RIlj
Rly
,111
,
P[ederson
a
.q$ 4
"-
B ~ ei" j R
Rw
Gardy/90
er
Ring
09/18/90
09/#4/90
09/h
09
90
09/25790
Rlll
Rlll
9 a tin
1 er
OCVO7
'^^
() /p 90
g(
'9
-
'O l
,
.m
q.
-
-
..,
,
' . .
l
,
Y-
1. e
'#[
.(
{
A
,
'
1
'c.-.
.
.
-
.,i
,
.
.,
, . , . .
,
'
Wisconsin-Electric Power Company.
2"
- SEP 2 71990
'
t
' Enclosures and Distribistion'
+
'
o!
.
.
,
-
.
Enclosures:
.
'
._1;-
Inspection Reports.
l
No.50.^66/90018(DRS)';
No.50-301/90018(DRS)
."'
.
2.1 Appendix A-
'
.
,
~
,
.
.
'
cc w/ enclosures:
.
.
j
~
DCD/DCB(RIDS),-PlantManager-
.
G. J. Maxfield
'
i
OC/LFDCB
..
i
. Resident' Inspector Rlll
.i
,
Virgil Kanable, Chief
.i
'
Boiler Section;
..
1
~
!
'
,
. Charles Thompson, Chairman
.'!
,
. Wisconsin Public Service
Connission
._
. __ _
'
' '
Leroy E. Conner, Acting' Administrator'
i
WI:Div. of Emergency Government
!
'
Teri L. Vierima.: Chief.
!
Radiation Protection Section-
i
,
W1 Department of Health and
i
Social Services
j
S. Stein', NRR-
'
.
.l
B. Grimes, NRRL
.,
-r
bec w/ enclosures:
- ]
>
J. Lieberman, OE
g
J. Goldberg, OGC
El
J. Partlow, NRR
Er
1
t
't
h
i
!
,
s
.
..
.c
n
,
__
_,
_
?