ML20205R465

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-266/99-10 & 50-301/99-10 on 990329- 0401.No Violations Noted.During Insp NRC Observation of Licensee Activities Showed Emergency Preparedness Program to Be Adequately Implemented
ML20205R465
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/19/1999
From: Shear G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddemann M
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20205R469 List:
References
50-266-99-10, 50-301-99-10, NUDOCS 9904230035
Download: ML20205R465 (3)


See also: IR 05000266/1999010

Text

l' \

l

l

April 19, 1999

,

Mr. M. Reddemann

Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road

Two Rivers, WI 54241

SUBJECT: NRC EMERGENCY PREPAREDNESS INSPECT!ON REPORTS

50-266/99010(DRS); 50-301/99010(DRS)

Dear Mr. Reddemann:

On April 1,1999, the NRC completed an inspection at your Point Beach Nuclear Plant Units 1

and 2. The enclosed report presents the results of that inspection. The inspection examined

activities conducted under your emergency preparedness program. No violations of NRC

requirements were identified.

Areas examined within your emergency preparedness program are identified in the report.

Within those areas, the inspection concisted of a selective examination of procedures and

representative records, interviews with personnel, and observation of activities in progress.

The objective of the inspection effort was to determine whether activities authorized by the

license were conducted safely and in accordance with NRC requirements.

During this inspection our observation of your activities showed the emergency preparedness

program to be adequately implemented. In particular, emergency response facilities, equipment

and supplies were well-rnaintained and interviewed emergency response personnel

demonstrated knowledge of their responsibilities and emergency procedures. Quality

Verification oversight of the program was very competent. Your on shift dose assessment

capability was evaluated and found acceptable.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the

enclosure will be placed in the NRC Public Document Room (PDR).

l

I

9904230035 990419

PDR ADOCK 05000266

0 PDR

- _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _

. - _ _ - - _ _ _ _ - _ _ _ _ - _

.

M. Reddemann -2-

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Gary L. Shear, Chief

Plant Support Branch

Docket Nos.: 50-266;50-301

Licenses No.: DPR-24; DPR-27

Enclosure: Inspection Reports 50-266/99010(DRS); 50-301/99010(DRS)

cc w/ encl: R. Grigg, President and Chief

Operating Officer, WEPCO

M. Sellman, Senior Vice President,

Chief Nuclear Officer

R. Mende, Plant Manager

J. O'Neill, Jr., Shaw, Pittman,

Potts & Trowbridge

K. Duveneck, Town Chairman

Town of Two Creeks

B. Burks, P.E., Director

Bureau of Field Operations

J. Mettne , Chairman, Wisconsin

Public Service Commission

S. Jenkins, Electric Division

Wisconsin Public Service Commission

State Liaison Officer

l

DOCUMENT NAME: G:\DRS\ pol 99010.WPD l

To receive a copy of this document, Indicate in the box *C' = Copy w/o attach /end "E' = Co sy w/ attach /end "N" = No copy

OFFICE Rill _

E Rlli 0 Rill E. I

NAME Funk:jp/sdf l# Lanksbury Stbf Shear 046

DATE 4/ 6 /99 4/20 /99 4//4/99

OFFICIAL RECORD COPY

_ - _ - _ _

.

9

.

M.Reddemann -3-

Distribution:

CAC (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlli w/enct

B. Clayton, Rill w/ encl

SRI Point Beach w/enci

DRP w/ encl

DRS w/enct

Rlll PRR

PUBLIC IE- w/enci p 4_ }

Docket File nci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

/

'\

c.tutC :

. .

. - _ _ _ _ - -