Forwards Insp Repts 50-266/99-15 & 50-301/99-15 on 990830- 0903.No Violations Noted.Inspectors Concluded That Util Licensed Operator Requalification Training Program Satisfactorily Implemented
ML20212J743
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/30/1999
From: Dave Hills
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddemann M
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20212J745 List:
References
50-266-99-15, 50-301-99-15, NUDOCS 9910050277
Download: ML20212J743 (2)


See also: IR 05000266/1999015

Text

x

.. '

-September 30, 1999

Mr. M. Roddemann

Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road

' Two Rivers, WI 54241

i SUBJECT: OPERATOR LICENSING REQUALIFICATION INSPECTION REPORT

,

50-266/99015(DRS); 50-301/99015(DRS)

Dear Mr. Reddemann:

'On September 3,1999, the NRC completed a routine on-site inspection of the licensed operator

requalification training program at your Point Beach Nuclear Power Plant. At the conclusion of

the inspection an exit meeting was conducted at the facility and the preliminary inspection

findings were discussed with station management and staff. The enclosed report presents the

. results of that inspection. No violations of NRC requirements were identified.

The inspectors concluded that your licensed operator requalification training program was ,

,

satisfactorily implemented in accordance with 10 CFR Part 55 requirements. Your staff

developed and administered the annual requalification examinations in accordance with

program guidance and provided sound evaluation of licensed operator performance. Licensed

operators observed in the plant and during the examinations performed satisfactorily,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and the

enclosure will be placed in the NRC Public Document Room.

' We will gladly discuss any questions you have conceming this examination.

-

Sincerely,

Original /s/ David E. Hills

David E. Hills, Chief '

Operations Branch ,

Docket Nos. 50-266; 50-301

. License Nos. DPR-24; DPR-27

~

Enclosures: 1. Inspection Report 50-266/99015(DRS); 50-301/99015(DRS)

2. Simulation Facility Report-

See Attached Disthbution

DOCUMENT NAME: G:DRS\ pol 99015.WPD '

v.m. c a mm me, w c .co.

OFFICE - Rill N Rlli -lu Rill IN l

NAME MBielby:]p 1d6 RLanksburnbf,. DHills - MW-

E

DATE 09/44/99 09/W99 09AA/99 ,

'

OFRCIAL RECORD COPY

~

9910050277 990930

'

PDR ADOCK OS0002M

8 POR

- *

, . .

l-.,

f

l- .

M. Roddemann =-3-

,

s  %

cc w/encis: - R. drigg. President and Chief.

Operating Officer, WEPCo

^

M. Sellman, Senior Vice President,

..

Chief Nuclear Officer

R. Mende, Plant Manager:

1 J. O'Neill, Jr., Shaw, Pittman,

l Potts & Trowbridge

K. Duveneck, Town Chairman

Town of Two Creeks -

B. Burks, P.E., Director

'

Bureau of Field Operations

J. Mettner, Chairman, Wisconsin

1 - Public Service Commission

'

S. 'Jenkins, Electric Division

Wisconsin Public Service Commission

'

State Liaison Officer

Distnbution:

CAC (E-Mail)

- RPC (E-Mail) -

BAW (Project Mgr.)(E-Mail)

J. Caldwell, Rlli w/encls

B. Clayton, Rlli w/encls

SRI Point Beach w/encls

'

DRP w/encls

DRS w/encls -

Ritt PRR w/encis -

PUBLIC IE-42 w/encls

' Docket File w/encls

GREENS-

lEO (E-Mail)

DOCDESK (E-Mail)

I

k l

\ l

i

!

b **

?)

i