IR 05000266/1989016

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-266/89-16 & 50-301/89-15 on 890301-0512.Violations Noted.Util Will Be Notified by Separate Correspondence of NRC Decision Re Enforcement Action Based on Findings
ML20247Q223
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/31/1989
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20247Q227 List:
References
NUDOCS 8906060364
Download: ML20247Q223 (2)


Text

-

..

-

gD

.j

'

'

MAY 3 1 1999 Docket No. 50-266.

Docket No. 50-301'

g Wisconsin Electric Power. Company

'e..

ATTN:

Mr.

C...W.

Fayc

'Vice President Nuclear Power 231 West.-Michigan Street - P379 Milwaukee, WI-53201

,

L

" Gentlemen:

'This refers:to the~special safety inspection conducted by

~

Messrs. C.

L~. Vanaerniet, R. J. Leemon and R. Mendez of this office from; March 1 through May 12, 1989,_of activities at the Point Beach Nuclear Plant, Units l'and 2, authorized by ERC Operating Licenses

.No. DPR-24 and No~:DPR-27_and to the discussion of'our findings with

'Mr.'J. J. Zach-.and-members of his staff at the conclusion of the' inspection.

The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of p'rocedures and representative records, observations, and interviews with personnel.

During_this inspection, certain of your activities appeared to be in violation-of NRC requirements.

You will be notified by separate correspondence of our decision regarding enforcement action based on those findings.

No written response is required _until you are notified of the proposed enforcement action.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, and the enclosure will be placed in the NRC Public Document Room.

We will gladly discuss _any questions you have concerning this inspection.

Sincerely,

. ORIGINAL SIGHED BY W. L FORIM y

Edward G. Greenman, Director

~gg; Division of Reactor Projects

{ gr vaca.

j80 '

Enclosure:

-oo 1.

Inspection Reports

/

,

$$

No. 50-266/89016(DRP);

g g No. 50-301/89015(DRP)

a.co

$$

See Attached Distribution q

f y&

/ET Ll6 Yu F.h NJ-o'

/ RIII RIII R

RIII RIII RIII Rill R

fM 8 la[fh WM $w WC4

$$

2.2./ L EdOb DeFay6tte Me Ga Kno) C Gro.e Greenman CDQ O '

.Vandenjet/cg snm r-nnspns)rfnra g $o/prnse, a,.p,

w,s,..

-

',g "

~

',

ll

$.'

-

y

.O,

'

,

L T " Wisconsin. Electric Power.

2 g7p g g ;

g 4.,

Company" L3 Il

~ '

Distribution-L"~

1cc w/ enclosure:

J. J. Zach, Plant Manager

,

,

s:

_DCD/DCB (RIDS)-

Licensing Fee Management Branch:

Resident Inspector, RIII

'VirgiliKanable, Chief:

Boiler Section.

L

> Charles Thompson, Chairman V

' Wisconsin Public Service-E

' Commissions.

,

,.

'"

' R. I; Braund (SLO),:

1-WI Div.:of Emergency Government ~

LawrenceLJ.~McDonnell', Chief r

Radiation Protection Section'

L-WI; Department of. Health;and

,

'

. Social' Services, Division

of Health.

g<

.

,

t

.

E t

.

c - _ = ____:-_- 2.

_____-___-_.__:__.___..__-_____.... _ - - -.. _ _ _ _ _ -. ____ _______.

_ - _ _ _ _ _ _ _ _

_ - _ _ _ - _ _ _ - - _ _ - - _ _ _ _ _ _