IR 05000266/1989016
| ML20247Q223 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 05/31/1989 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20247Q227 | List: |
| References | |
| NUDOCS 8906060364 | |
| Download: ML20247Q223 (2) | |
Text
-
..
-
gD
.j
'
'
MAY 3 1 1999 Docket No. 50-266.
Docket No. 50-301'
g Wisconsin Electric Power. Company
'e..
ATTN:
Mr.
C...W.
Fayc
'Vice President Nuclear Power 231 West.-Michigan Street - P379 Milwaukee, WI-53201
,
L
" Gentlemen:
'This refers:to the~special safety inspection conducted by
~
Messrs. C.
L~. Vanaerniet, R. J. Leemon and R. Mendez of this office from; March 1 through May 12, 1989,_of activities at the Point Beach Nuclear Plant, Units l'and 2, authorized by ERC Operating Licenses
.No. DPR-24 and No~:DPR-27_and to the discussion of'our findings with
'Mr.'J. J. Zach-.and-members of his staff at the conclusion of the' inspection.
The enclosed copy of our inspection report identifies areas examined during the inspection. Within these areas, the inspection consisted of a selective examination of p'rocedures and representative records, observations, and interviews with personnel.
During_this inspection, certain of your activities appeared to be in violation-of NRC requirements.
You will be notified by separate correspondence of our decision regarding enforcement action based on those findings.
No written response is required _until you are notified of the proposed enforcement action.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter, and the enclosure will be placed in the NRC Public Document Room.
We will gladly discuss _any questions you have concerning this inspection.
Sincerely,
. ORIGINAL SIGHED BY W. L FORIM y
Edward G. Greenman, Director
~gg; Division of Reactor Projects
{ gr vaca.
j80 '
Enclosure:
-oo 1.
Inspection Reports
/
,
$$
No. 50-266/89016(DRP);
g g No. 50-301/89015(DRP)
a.co
$$
See Attached Distribution q
f y&
/ET Ll6 Yu F.h NJ-o'
/ RIII RIII R
RIII RIII RIII Rill R
fM 8 la[fh WM $w WC4
$$
2.2./ L EdOb DeFay6tte Me Ga Kno) C Gro.e Greenman CDQ O '
.Vandenjet/cg snm r-nnspns)rfnra g $o/prnse, a,.p,
w,s,..
-
',g "
~
',
ll
$.'
-
y
- .O,
'
,
L T " Wisconsin. Electric Power.
2 g7p g g ;
g 4.,
Company" L3 Il
~ '
- Distribution-L"~
1cc w/ enclosure:
J. J. Zach, Plant Manager
,
,
s:
_DCD/DCB (RIDS)-
Licensing Fee Management Branch:
Resident Inspector, RIII
'VirgiliKanable, Chief:
Boiler Section.
L
> Charles Thompson, Chairman V
' Wisconsin Public Service-E
' Commissions.
,
,.
'"
' R. I; Braund (SLO),:
1-WI Div.:of Emergency Government ~
LawrenceLJ.~McDonnell', Chief r
Radiation Protection Section'
L-WI; Department of. Health;and
,
'
. Social' Services, Division
- of Health.
g<
.
,
t
.
E t
.
c - _ = ____:-_- 2.
_____-___-_.__:__.___..__-_____.... _ - - -.. _ _ _ _ _ -. ____ _______.
_ - _ _ _ _ _ _ _ _
_ - _ _ _ - _ _ _ - - _ _ - - _ _ _ _ _ _