Forwards Safety Insp Repts 50-266/89-19 & 50-301/89-18 on 890619-30.No Violation Issued for Violation Re Failure to Provide Control Over Emergency Operating Procedures Since Util Identified Concern in Recent Internal Audit
ML20248D191
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 08/04/1989
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20248D196 List:
References
NUDOCS 8908100280
Download: ML20248D191 (2)


See also: IR 05000266/1989019

Text

_,_7

,

' , , .

.

..

'

..

'

L

.,

a

r

.

l

l

AU3 - 4 1933

Docket No. 50-266

1

Docket No. 50-301

Wisconsin Electric Power Company

ATTH: Mr. C. W. Fay

Vice President

i

Nuclear Power

'

231 West Michigan Street - P379

Milwaukee, WI 53201

Gentlemen:

This refers to the special safety inspection conducted by an NRC Emergency

Operating Procedure Inspection Team on June 19-30, 1989, of activities

at Point Beach Nuclear Plants, Units 1 and 2, authorized by NRC Operating

Licenses No. DPR-24 and No. DPR-27 and to the discussion of our findings

with Mr. G. Maxfield and others of your staff at the conclusion of the

inspection and subsequent discussion with Mr. T. Staskal of your staff on

July 26, 1989.

.The purpose of this inspection was to verify that your E0Ps are technically

correct; that their specified actions can be accomplished using existing

equipment, controls, and instrumentation; and that available procedures have

the usability necessary to provide the operator with an effective operating

tool to place the plant in a safe shutdown condition.

The enclosed copy of our inspection report ideatifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection a violation of 10 CFR Part 50, Appendix B, Criterion VI

was identified relating to your failure to provide control of the E0Ps and their

basis documents consistent with the control over their original generation and

their importance to safety. Since you had also identified this concern in a

recent internal audit and were in the process of implementing corrective

action, no Notice of Violation is being issued.in accordance with the

criteria of 10 CFR Part 2, Appendix C, Section V.A.

Subsequent to this 'nspection a potential concern was identified relative

to a transition out of E0P-0, " Reactor Trip or Safety Injection," prior to

completing the immediate action steps with a potential for not returning to

complete these steps. This concern is described in Paragraph 6 of the

attached Inspection Report and was discussed with a member of your staff via

telephone on July 26, 1989. This potential deficiency in your E0Ps resulted

from the re-sequencing of steps from that given in the " Emergency Resp (onse

Guidelines," and underscores our concerns addressed in Paragraphs 2.c 1)(a)

and 2.c.(1)(c) of the attached Inspection Report.

!

8908100280 890804

g

/[8/

e6

PDR

ADOCK 0500

__

_ _ _ _ _ _ _ _ _ _ . _ _ _ _

i

__

_ _ _ _

.

.-

.

  • .

Wisconsin Electric Power Company

2

AUG - 4 19C3

We request that you respond to the three Open Items detailed in Paragraph 6

and Appendix B of the attached Inspection Report providing your planned

actions and schedule for resolving these issues.

-In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter are not subject to the clearance

procedures of the Office of Management and Budget as required by the Paperwork

j

Reduction Act of 1980, PL e6-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

l

y

-

/

t7l, 'l

/

G offrey C. Wright, Chief

Operations Branch

Enclosure:

Inspection Reports

No. 50-266/89019(DRS);

No. 50-301/89018(DRS)

cc w/ enclosure:

J. J. Zach, Plant Manager

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Virgil Kanable, Chief

Boiler Section

Charles Thompson, Chairman

Wisconsin Public Service

Commission

R. I. Braund (SLO),

WI Div. of Emergency Government

Lawrence J. McDonnell, Chief

Rao ation Protection Section

WI Department of Health and

Social Services, Division

of Health

bcc w/ enclosure:

W. Regan, NRR/LHFB

y r3

-Y

", II

RIII

RIII

I-

II er

RI I

//

llh

rW

Y\\%bm\\p\\

Hopkins

!)G I,L

U

'Hasse/ s

erniet

Pft 11ips

De9yette

f ht

PIS/4

'

- - - -