Discusses 990610 Telcon Between Wp Walker & D Mcneil Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at Point Beach Nuclear Power Plant for Week of 990816
ML20195J925
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/14/1999
From: Dave Hills
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddemann M
WISCONSIN ELECTRIC POWER CO.
References
NUDOCS 9906210155
Download: ML20195J925 (3)


Text

p e

-4 June 14,.1999 Mr. M.- Reddemann Site Vice President Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, WJ 54241

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION '

1

Dear Mr. Reddemann:

In a telephone conversation on June 10,1999, W. Parks Walker, Training Manager, and dbl McNeil, Reactor inspector, made arrangements for the NRC to inspect the licensed operator requalification program at the Point Beach Nuclear Power Plant. The inspection is planned for

' the week of August 16,1999, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please fumish the written examinations and operating tests scheduled for the 4

week of the inspection to the NRC by August 16,1999. Mr. Walker has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

~

' This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per

- response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the.

Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by intemet electronic mail at BJSi@NRC. GOV; and to the.

Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

9906210155 990614 5

PDR. ADOCK 05000266 V

PM i

E 1

M. Reddemann Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Michael Bielby at 630-829-9762, or me at 630-829-9733.

Sincerely, Original /s/ D. E. Hills David E. Hills, Chief Operations Branch Docket Noa. 50-266; 50-301 License Nos. DPR-24; DPR-27 cc :

R. Grigg, President and Chief Operating Officer, WEPCO M. Sellman, Senior Vice President, Chief Nuclear Officer R. Mende, Plant Manager J. O'Neill, Jr., Shaw, Pittman, Potts & Trowbridge K. Duveneck, Town Chairman Town of Two Creeks B. Burks, P.E., Director Bureau of Field Operations J. Mettner, Chairman, Wisconsin Public Service Commission S. Jenkins, Electric Division Wisconsin Public Service Commission State Liaison Officer See Attached Distribution DOCUMENT NAME: G:DRS\\ pol 06139.wpd

v... em w mm eoev,,,oide.e. m me w c em um smu.new. r cc en n.enmenu.new. r. m em

(

OFFICE Rill lN Rill A/

l l

l NAME DMcNeil:sd tu DHills #

)

DATE 06/ll/99 06k'I/99

)

OFFICIAL RECORD COPY l

l l

F M. Reddemann >

l-J l

- Distribution:

CAC (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/enci J. Caldwell, Rill w/enci B. Clayton, Rlli w/enci SRI Point Beach w/enci DRP w/enci DRS w/enci Rill PRR w/enci PUBLIC IE-42 w/enci Docket File w/enci GREENS LEO (E-Mail)

DOCDESK (E-Mail)

W. P. Walker, Training Department D. C. Trimble, NRR:DIPM:lOHB M. A. Bies, DRS r

0 i

i I

. )

  • Ni

. )

L

,