Forwards Insp Repts 50-266/99-12 & 50-301/99-12 on 990614-18.One Violation Noted,But Being Treated as non-cited violation.Long-term MOV Program Not Sufficiently Established to close-out NRC Review of Program,Per GL 89-10
ML20209H547
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 07/14/1999
From: Jeffrey Jacobson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddemann M
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20209H553 List:
References
50-266-99-12, 50-301-99-12, GL-89-10, GL-96-05, GL-96-5, NUDOCS 9907210013
Download: ML20209H547 (4)


See also: IR 05000266/1999012

Text

. '

$.

h

E

July 14, 1999

l

,

Mr. M. Reddemann

Site Vice President

. Point Beach Nuclear Plant

. 6610 Nuclear Road

Two Rivers, WI . 54241

l

L SUBJECT:

NRC INSPECTION REPORT 50-266/99012(DRS); 50-301/99012(DRS)

~

a

Dear Mr. Reddemann:

' On June 18,1999, the NRC completed an inspection at' your Point Beach Nuclear Plant. The

focus of this inspection was to review the inservice test program as required by 10 CFR 50.55a

and determine whether activities associated with Generic Letter 96-05, " Periodic Verification of

Design-Basis Capability of Safety-Related Motor-Operated Valves," were sufficient to ensure the

continued capability of motor-operated valves. The enclosed report presents the results of that

inspection.

Overall,' the revised inservice testing program and associated surveillance procedures included

a number of improvements which ensured the applicable safety-related components were

properly tested as required. ' Issues identified during this inspection, such as the inappropriate

position on relief valve acceptance criteria for determining test failures resulting in the violation

discussed below and the inadequate justification for deferring quarterly testing of manual valves,

indicated some additional program refinements were appropriate.. The inservice testing .

j

background document was considered a good tool to compile component bases and design

!

requirements in one location.

Our inspection results indicated that your long-term motor-operated valve program at your Point

,

Beach Nuclear Plant was not sufficiently established to close-out NRC's review of the program.

]

L This resulted from the delay in your implementation of the long-term motor-operated valve

j

program following completion of Generic Letter 89-10. A number of issues, as discussed in the

report, need to be resolved to provide continued assurance that motor-operated valves within

. the scope of Generic Letter 96-05 are capable of performing their design-basis safety functions.

'

'

Based on the results of this inspection, the NRC has determined that one_ violation of NRC

l

. requirements occurred. This violation is being treated as Non-Cited Violation (NCV), consistent

with Appendix C of the Enforcement Policy. This NCV is described in the subject inspection

'

l

report. ~ If you contest the violation or severity level of this NCV, you should provide a response

1

'

i within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

copies to the Regional Adrninistrator, Region ill, and the Director, Office of Enforcement, United

States Nuclear Regulatory Commission, Washington, DC 20555-0001.

L

9907210013 990714

"

'

PDR

ADOCK 05000266

G

PDR

<

'

.

.

M. Reddemann

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure, and your response to this letter, if you choose to respond, will be placed in the NRC

Public Document Room (PDR).

Sincerely,

Original /s/ J. M. Jacobson

John M. Jacobson, Chief

Mechanical Engineering Branch

Division of Reactor Safety

Docket Nos. 50-266; 50-301

License Nos. DPR-24; DPR-27

Enclosure:

Inspection Report 50-266/99012(DRS);

50-301/99012(DRS)

cc w/ enc!:

R. Grigg, President and Chief

Operating Officer, WEPCO

M. Sellman, Senior Vice President,

Chief Nuclear Officer

R. Mende, Plant Manager

J. O'Neill, Jr., Shaw, Pittmar,

Potts & Trowbridge

K. Duveneck, Town Chairman

Town of Two Creeks

B. Burks, P.E., Director .

Bureau of Field Operations

J. Mettner, Chairman, Wisconsin

Public Service Commission

S. Jenkins, Electric Division

Wisconsin Public Service Commission

I

State Liaison Officer

See Attached Distribution

DOCUMENT NAME: G:DRS\\ pol 99012.wpd

  • See Previous Concurrence

To raceive a copy of th6s document, Indicate in the bos: "C" e Copy udthout attachment / enclosure *E' = Copyynth attachment / enclosure

"N" a No copy

OFFICE

Rill *

lV Rlll*

[

Rlli

dW

N

NAME

ADunlop:sd (d F

RLanksbury

JJacobsyin\\ W

\\

DATE

07//y09

07/ /99

07A'l/9k\\ \\j

OFFICIAL RECORD COPY O

1

y ..

.

M. Reddemann

-2-

J

in'accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

Sincerely,

John M. Jacobson, Chief

Medanical Engineering Branch

Division of Reactor Safety

Docket Nos. 50-266; 50-301

License Nos. DPR-24; DPR-27

Enclosure:

Inspection Report 50-266/99012(DRS);

50-301/99012(DRS)

cc w/ encl:

R. Grigg, President and Chief

Operating Officer, WEPCO

M. Sellman, Senior Vice President,

Chief Nuclear Officer

R. Mende, Plant Manager

J. O'Neill, Jr., Shaw, Pittman,

Potts & Trowbridge

K. Duveneck, Town Chairman

Town of Two Creeks

B. Burks, P.E., Director

Bureau of Field Operations

J. Mettner, Chairman, Wisconsin

Public Service Commission

S. Jenkins, Electric Division

Wisconsin Public Service Commission

State Liaison Officer

See Attached Distribution

DOCUMENT NAME: G:DRS\\ pol 99012.wpd

to ,.c.w . co,y or ini. aoeum.ni, insie.t. in in. nor c copy wiinooi .ri.cnm.nti ncio.ur. e . copy wiin .ti.cnm.nte.ncio.or. ic .nocopy

OFFICE

Rill

lV Rill

)/

Rlli

l

l

NAME

ADunlop:sd 6(r

RLanksburyf#$ JJacobson

DATE

07/I'//99

07/11/99

$

07/ /99

OFFICIAL RECORD COPY

2T-

.-

i

l

M. Reddemann

-3-

Distribution:

CAC (E-Mail)

RPC (E-Mail)

Project Mgr., NRR w/enci

J. Caldwell, Rlll w/enct

B. Clayton, Rlli w/ encl

SRI Point Beach w/enci

DRP w/enci

DRS w/enci

j

Rlli PRR w/enci

'

PUBLIC IE-01 w/ enc!

Docket File w/enci

l

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

2nnnn<

.

.

. - -

,