ML20211Q645

From kanterella
Jump to navigation Jump to search
Forwards Operator Licensing Exam Repts 50-266/99-301OL & 50-301/99-301OL for Exams Conducted on 990726-0802 at Point Beach Npp.All Nine Applicants Passed All Sections of Exam
ML20211Q645
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/08/1999
From: Dave Hills
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reddeman M
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20211Q649 List:
References
50-266-99-301OL, 50-301-99-301OL, NUDOCS 9909150110
Download: ML20211Q645 (3)


See also: IR 05000266/1999301

Text

j

r

,

!

.

1

September 8,1999

Mr. M. Reddemann

Site Vice President

Point Beach Nuclear Plant

6610 Nuclear Road

Two Rivers, WI 54241 '

SUBJECT:

OPERATOR LICENSING EXAMINATION REPORT 50-266/99301(OL);

50-301/99301(OL)

Dear Mr. Reddemann:

The Nuclear Regulatory Commission examiners completed initial operator licensing

examinations at your Point Beach Nuclear Power Plant on August 2,1999. The license

applicants' performance evaluations were finalized on August 26,1999. The examiners

reviewed several administrative and operating procedures during the examination validation and

. administration. The enclosed report presents the results of the examination and concurrent

. operations inspection.

L

The examiners administered operating tests and written examinations to four reactor operator

and five senior reactor operator license applicants. All nine applicants passed all sections of

the examination. The applicants were well prepared for the operating test and written

examination. In general, they displayed good operating and communicating practices during

the operating test. The small number of questions missed by more than 50% of the applicants

indicated a comprehensive training program that met the needs of the applicants.

It is our expectation that the Point Beach Nuclear Power Plant training department instructors

will use the' applicant and examination weaknesses outlined in the accompanying report as

feadback to improve the operator license training program in accordance with your Systematic

i

Approach to Training program.

.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the

enclosures to this letter will be placed in the NRC Public Document Room.

i

,

f

9909150110 990908

PDR

ADOCK 05000266

V

PDR

. . . . . . . ..

. . .

. . . .

. . .

.

.

.

..

-

..

.

..

..

,

.

.

l

M. Reddemann

-2-

We will gladly discuss any questions you have concerning this examination.

Sincerely,

,

Original Signed by David E. Hills

David E. Hills, Chief

Operations Branch

Docket Nos. 50-266; 50-301

License Nos. DPR-24; DPR-27

Enclosures:

1. Inspection Report 50-266/99301(OL); 50-301/99301(OL)

2. Written Examination Facility Comments

3. Simulation Facuity Report

4. Written Examination and Answer Keys (RO)

'

cc w/encls 1,2 & 3:

R. Grigg, President and Chief

Operating Officer, WEPCO

M. Sellman, Senior Vice President,

,

Chief Nuclear Officer

'

R. Mende, Plant Manager

J. O'Neill, Jr., Shaw, Pittman,

Potts & Trowbridge

K. Duveneck, Town Chairman

Town of Two Creeks

B. Burks, P.E., Director

Bureau of Field Operations

J. Mettner, Chairman, Wisconsin

Public Service Commission

S. Jenkins, Electric Division

Wisconsin Public Service Commission

State Liaison Officer

cc w/encls 1,2,3 & 4:

W. Parks Walker, Plant Training Manager

!

DOCUMENT NAME: G:DRS\\ pol 99301.WPD

l

r. c.w . em a im. soc-et. m oh. bor c cm eoui se-v no-.

r em win an cn-veno-. er we my

l

OFFICE

Rill

E

Rill

lB

Rill

lN

l

NAME

DMcNeil:]p)d64v RLanksburyML

DHills P%

DATE

09/ 8/99

09/ P/99

f

09/f /99

,

OFFICIAL RECORD COPY

l

M. Red

demann

Ditkihuito :

C

RP (E-Mail)AC(E-Mail)

n

C

-3-

BAW

J. Cal (w l

Proje tMgr)

c

d

B. Clayto ,l, Ritt w/en(E-Mail)

e

SRIPointBe

.

n Rillw/e cis 1,2

DRP

RSw/encls 1w/en ls 1,2a h w/encls 1n ls 1,2

D

c

c

& 3

c

& 3

Rlli

& 3

,2&3

PR

PUBLIC

R w/e ,s 1,2

2& 3

nl

Do ketFile /

c

IE-42 w/en i

c

G

& 3

REEN

w

c

LEO

M.O (E-Mail)

n ls 1,2s 1, 2, 3

S

e c

D

& 4

CD

&3

Bies,ESK(E-Mali)

DRS

w/e ls 1,2

nc

&3

.

A

$

~

N

,

i

l

M. Reddemann

-3-

Distribution:

CAC (E-Mail)

RPC (E-Mail)

BAW (Project Mgr.)(E-Mail)

J. Caldwell, Rill w/encls 1,2 & 3

B. Clayton, Rlil w/encls 1,2 & 3

SRI Point Beach w/encls 1,2 & 3

DRP w/encls 1,2 & 3

DRS w/encls 1,2 & 3

Rlli PRR w/encls 1,2 & 3

PUBLIC IE-42 w/encls 1,2,3 & 4

Docket File w/encls 1,2 & 3

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

M. Bies, DRS w/encls 1,2 & 3

,

,-

E

G6

,

.

J