ML19282B991: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:'
            ,
AVERAGE DAILY UNIT POWER LEVEL
AVERAGE DAILY UNIT POWER LEVEL
  . .
        *
.                                            DOCKET NO. 50 - 277
.                                            DOCKET NO. 50 - 277
____-__---___________________
                             $                      UNIT PEACH BOTTOM UNIT 2 DATE MARCH 10,1979 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH        FEBRUARY 1979 DAY      AVERAGE DAILY POWER LEVEL            DAY            AVERAGE DAILY POWER LEVEL (MWE-NET)                                                (MWE-NET) 1                  1077                    17                                      751 2                  1075                    18                                    1026 3                  1075                    19                                    1066 4                  1072                    20                                    1074 5                  1074                    21                                    1074 6                  1075                    22                                    1079 7                  1075                    23                                    1057 8                  1061                    24                                      953 9                    967                    25                                    1067 10                      10                    26                                    1070 11                        0                    27                                    1076 12                        0                    28                                    1069 13                        0 14                      29 15                      589 16                      892 7903190227
                             $                      UNIT PEACH BOTTOM UNIT 2
_____________________________
DATE MARCH 10,1979
__-__________________________
COMPANY PHILADELPHIA ELECTRIC COMPANY
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
_____________________________
MONTH        FEBRUARY 1979
______________
DAY      AVERAGE DAILY POWER LEVEL            DAY            AVERAGE DAILY POWER LEVEL (MWE-NET)                                                (MWE-NET) 1                  1077                    17                                      751 2                  1075                    18                                    1026 3                  1075                    19                                    1066 4                  1072                    20                                    1074 5                  1074                    21                                    1074 6                  1075                    22                                    1079 7                  1075                    23                                    1057 8                  1061                    24                                      953 9                    967                    25                                    1067 10                      10                    26                                    1070 11                        0                    27                                    1076 12                        0                    28                                    1069 13                        0 14                      29 15                      589 16                      892
                  .
7903190227


                    *
       .                                        OPERATING DATA REPORT DOCKET NO. 50 - 277 DATE MARCH 10,1979 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDFN ENGINEER-IN-CHARGE NUCLEAR SECTION GENER ATION DIVISION-NUCL E AR TELEPHONE (215) e41-5022 OPERATING STATUS
  .
: 1. UNIT NAME: PEACH BOTTOM UNIT 2                                                        l NOTES: THIS UNIT EXPERIENCED ONE                                                  l l                                                                                  l
       .                                        OPERATING DATA REPORT
: 2. RE PORT ING PERIOD: FEBRUARY, 1979                                                    l              OUTAGE THIS MONTH                                                    l l                                                                                  l
    -
: 3. LICENSED THERMAL POWER (MWT):                                        3293            I                                                                                  I l                                                                                  g
DOCKET NO. 50 - 277
: 4. NAMEPLATE RATING (CROSS MWE):                                        1152            l                                                                                  I l                                                                                  l
__________________..._._____.
: 5. DE SIGN E LECTRICAL RATING (NET MWE ):                            1065            l                                                                                  l l                                                                                  l
DATE MARCH 10,1979
: 6. MAXIMUM DEPENDAPLE CAPACITY (GROSS MWE): 1098                                      l                                                                                  1 l                                                                                  l
                                                                                                                            ---
__-            __._-___-___-___
COMPLETED BY PHILADELPHIA ELECTRIC COMPANY
                                                                                                                        ..____________                              _______..__
W.M.ALDFN ENGINEER-IN-CHARGE NUCLEAR SECTION GENER ATION DIVISION-NUCL E AR TELEPHONE (215) e41-5022
______-_______---_------____-
OPERATING STATUS
: 1. UNIT NAME: PEACH BOTTOM UNIT 2                                                        l NOTES: THIS UNIT EXPERIENCED ONE                                                  l
                                                            -
________
l                                                                                  l
: 2. RE PORT ING PERIOD: FEBRUARY, 1979                                                    l              OUTAGE THIS MONTH                                                    l
____----    - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
l                                                                                  l
: 3. LICENSED THERMAL POWER (MWT):                                        3293            I                                                                                  I
__-_____________
l                                                                                  g
: 4. NAMEPLATE RATING (CROSS MWE):                                        1152            l                                                                                  I
_______________
l                                                                                  l
: 5. DE SIGN E LECTRICAL RATING (NET MWE ):                            1065            l                                                                                  l
_________
l                                                                                  l
: 6. MAXIMUM DEPENDAPLE CAPACITY (GROSS MWE): 1098                                      l                                                                                  1
___.
l                                                                                  l
: 7. MAXIMUM DEPENDABLE C APACITY (NET MWE ):                              1051            l                                                                                  l
: 7. MAXIMUM DEPENDABLE C APACITY (NET MWE ):                              1051            l                                                                                  l
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWE):
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWE):
: 10. REASONS FOR RESTRICTIONS, IF ANY:
: 10. REASONS FOR RESTRICTIONS, IF ANY:
THIS MONTH                'YR-10-DATE                                CUMULATIVE
THIS MONTH                'YR-10-DATE                                CUMULATIVE HOURS IN REPORTING PERIOD                                                                  672                            1,416                                40,000
            .
HOURS IN REPORTING PERIOD                                                                  672                            1,416                                40,000
: 12. '' N' U.
: 12. '' N' U.
                 . ..M B E R OF HOURS RE ACTOR WAS CRITICAL 567                            1,311                                30,730
                 . ..M B E R OF HOURS RE ACTOR WAS CRITICAL 567                            1,311                                30,730
       }3. REACTOR RESERVE SHUT 00WN HOURS                                                                0.0                                  0.0                                0.0 44,
       }3. REACTOR RESERVE SHUT 00WN HOURS                                                                0.0                                  0.0                                0.0 44, HOURS GENERATOR ON-LINE                                                                  557.4                        1,301.4                                29,987.7
        ''
HOURS GENERATOR ON-LINE                                                                  557.4                        1,301.4                                29,987.7
____________                            - _______                      ____________
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                    0.0                                  0.0                                0.0
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                    0.0                                  0.0                                0.0
___--              _-_          --__-__ ____                            ______----__
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                1,728,919                      4,097,129                            84,118,086 l i. GROSS ELECTRICAL ENERGY GENER ATED IMWH)                                                579,010                  1,369,830                            27,535,760
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                                                1,728,919                      4,097,129                            84,118,086 l i. GROSS ELECTRICAL ENERGY GENER ATED IMWH)                                                579,010                  1,369,830                            27,535,760
                                                                                        --____--____                    ___                -- _.                _________.--
: 18. NET ELECTRICAL ENERGY GENER ATED (MWH)                                                    561.729                  1,327,395                            26,368,750
: 18. NET ELECTRICAL ENERGY GENER ATED (MWH)                                                    561.729                  1,327,395                            26,368,750
: 19. UNI T SERVICE FACTOR                                                                          82 9                                91.9                                73.5
: 19. UNI T SERVICE FACTOR                                                                          82 9                                91.9                                73.5
______-_____                    ___.________                            _______ ____
: 20. UNIT AVAILABILITY FACTOR                                                                      82.9                                91.9                                73.5
: 20. UNIT AVAILABILITY FACTOR                                                                      82.9                                91.9                                73.5
: 21. UNIT CAPACITY FACTOR IUSING MDC NET)                                                          79.5                                89.2                                61.5
: 21. UNIT CAPACITY FACTOR IUSING MDC NET)                                                          79.5                                89.2                                61.5
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                          78.5                                88.0                                60.7
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                          78.5                                88.0                                60.7
: 23. UNIl FOPCED DUTAGE RATE                                                                        5.4                                  2.4                                7.6
: 23. UNIl FOPCED DUTAGE RATE                                                                        5.4                                  2.4                                7.6
___.---_-___                    -___________                            _.______--__
: 24. SHUIDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 24. SHUIDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
;<:
: 25. IF S HUT OCWN AT END OF REPCRT PERICD, ESTIMATED DATE OF STARTUP:                                                                    N/A
: 25. IF S HUT OCWN AT END OF REPCRT PERICD, ESTIMATED DATE OF STARTUP:                                                                    N/A
: 26. UNI T S IN TEST STATUS (PRIOR TO COMMEPCIAL OPERATION):                                                FCRECAST                      ACHIEVED INITIAL CRITICALITY
: 26. UNI T S IN TEST STATUS (PRIOR TO COMMEPCIAL OPERATION):                                                FCRECAST                      ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION b
____                          - __-            _
INITIAL ELECTRICITY COMMERCIAL OPERATION
                                                                                                                                - _-              _ ______
b


                                                                                                                                                              .
UNIT SHUT 00wNS AND POWER REDUCTIONS                      DOCKET NO. 50 - ???                                            .
UNIT SHUT 00wNS AND POWER REDUCTIONS                      DOCKET NO. 50 - ???                                            .
UNIT NAME RSACH 90TTCM UNIT 2
UNIT NAME RSACH 90TTCM UNIT 2 DATE WARCH 10,1979 REPORT MONTH      FEBRUARY, 1979                  COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCtEAR SECTION GENERATION DIVI S ICN-NUL L E AR TELEPHONE (215) P41-5022 l        1      I          l        l METHOD OF l L ICE NSE E      ISYSTEMICDMPONENil CAUSE AND CORRECTIVE I        I T YPE I OURA T IONl RE A SONI SHUT T ING DOWNI    EVENT    l C 00E I  CODE  I    ACTICN TO NO.I    DATE i Illi (HOURS)l          (2) i REACTOR (3) 1 REPORT s 1 (4) 1              (5)  l PREVENT RECURRENCE                                    -
                                                                                                            ---- ....-------------...----
                                                                                                                                                                  -
DATE WARCH 10,1979
                                                                                                            -----                -------------------
REPORT MONTH      FEBRUARY, 1979                  COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCtEAR SECTION GENERATION DIVI S ICN-NUL L E AR TELEPHONE (215) P41-5022 l        1      I          l        l METHOD OF l L ICE NSE E      ISYSTEMICDMPONENil CAUSE AND CORRECTIVE I        I T YPE I OURA T IONl RE A SONI SHUT T ING DOWNI    EVENT    l C 00E I  CODE  I    ACTICN TO NO.I    DATE i Illi (HOURS)l          (2) i REACTOR (3) 1 REPORT s 1 (4) 1              (5)  l PREVENT RECURRENCE                                    -
                                                                                                                                                            -
1        I      I          I        I                I              I        I        l 2 I 790210 l      F l    32.0    l    A I          1      l    NONE    I HH l XXXXXX      l EXTERNAL PIPE LEAK ON PEACTCR FEEOPUMP BYPASS I        I      I          I        I                I              I        I        I LINE I        I      l          l        I                I              I        I        I 2 1 790210 l      5 l    82.6    l    8 l          1      1    NONE    I CH l HTEXCH l FEE 0 WATER HEATER REPAIR (CONTINU?OUS FROM i        i      l          I        I                i              l        i        I 790210)
1        I      I          I        I                I              I        I        l 2 I 790210 l      F l    32.0    l    A I          1      l    NONE    I HH l XXXXXX      l EXTERNAL PIPE LEAK ON PEACTCR FEEOPUMP BYPASS I        I      I          I        I                I              I        I        I LINE I        I      l          l        I                I              I        I        I 2 1 790210 l      5 l    82.6    l    8 l          1      1    NONE    I CH l HTEXCH l FEE 0 WATER HEATER REPAIR (CONTINU?OUS FROM i        i      l          I        I                i              l        i        I 790210)
     !        I      I ----- 1            I                i              i        l        i l                                                                      .
     !        I      I ----- 1            I                i              i        l        i l                                                                      .
Line 125: Line 62:
                                                                                                                                                         .c        'Y
                                                                                                                                                         .c        'Y


  *
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE MARCH 10,1979 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH  FEBRUARY 1979 DAY    AVERAGE DAILY POWER LEVEL            DAY        AVERAGE DAILY POWER LEVEL (MWE-NET)                                          (MWE-NET) 1                  1066                    17                            1066 2                  1059                    18                            1063 3                    781                    19                            1065 4                  1026                  20                            1062 5                  1064                  21                            1065 6                  1065                  22                            1068 7                  1064                  23                            1068 8                  1064                  24                            1060 9                  1067                  25                            1008 10                  1062                  26                            1057 11                  1061                  27                            1051 12                  1065                  28                            1056 13                  1066 14                  1066 15                  1063 16                  1066
* AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278
_____________________________
UNIT PEACH BOTTOM UNIT 3
_-      __________________-_____
DATE MARCH 10,1979
______________________              ___
COMPANY PHILADELPHIA ELECTRIC COMPANY
____________________________
W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022
_____________________________
MONTH  FEBRUARY 1979
_____________
DAY    AVERAGE DAILY POWER LEVEL            DAY        AVERAGE DAILY POWER LEVEL (MWE-NET)                                          (MWE-NET) 1                  1066                    17                            1066 2                  1059                    18                            1063 3                    781                    19                            1065 4                  1026                  20                            1062 5                  1064                  21                            1065 6                  1065                  22                            1068 7                  1064                  23                            1068 8                  1064                  24                            1060 9                  1067                  25                            1008 10                  1062                  26                            1057 11                  1061                  27                            1051 12                  1065                  28                            1056 13                  1066 14                  1066 15                  1063 16                  1066


                                             , ~ ~ ~ _._
                                             , ~ ~ ~ _._
* DOCKET NO. 50 - 278
DOCKET NO. 50 - 278
   *                                                                                                                                                =-          - -----_
   *                                                                                                                                                =-          - -----_
DATE MARCH 10,1979
DATE MARCH 10,1979 COMPLE TED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN E NGI N E E P.-I N-CH AR GE NUCLEAR SECTION GE NER ATION DIVISION-NUCL F A R TELEPHONE (215) 841-5022 OPERATING STATUS 1 UNIT NAM 5: PEACH BOTTOM UNIT 3                                                              l NOTES:    THIS UNIT EXPERIENCED ONE                                      i
.
COMPLE TED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN E NGI N E E P.-I N-CH AR GE NUCLEAR SECTION GE NER ATION DIVISION-NUCL F A R TELEPHONE (215) 841-5022
                                                                                                                    -__                          _-----_-----__
OPERATING STATUS 1 UNIT NAM 5: PEACH BOTTOM UNIT 3                                                              l NOTES:    THIS UNIT EXPERIENCED ONE                                      i
_-_        __--- -_--_---_-_---                            --              g                                                                          l
_-_        __--- -_--_---_-_---                            --              g                                                                          l
: 2. REPORTING PERIOD: FEBRUARY, 1979                                                            l          M4JOR POWER REDUCTION THIS                                    l
: 2. REPORTING PERIOD: FEBRUARY, 1979                                                            l          M4JOR POWER REDUCTION THIS                                    l l                                                                          l 3 L ICENSE D THERMAL POWER (MWT):                                          3293                l          MONTH                                                          I
_ _ _ _ _ _ _ - - - _ - - _ _ . - - _ _ - - -
l                                                                          l 3 L ICENSE D THERMAL POWER (MWT):                                          3293                l          MONTH                                                          I
_ _ - - _ . _ - - - - _ _ _                g                                                                          ;
_ _ - - _ . _ - - - - _ _ _                g                                                                          ;
: 4. NAMEPLATE RATING (GROSS MWE);                                            1152                l                                                                          1
: 4. NAMEPLATE RATING (GROSS MWE);                                            1152                l                                                                          1 i                                                                          (
                                                            --_______--.---
i                                                                          (
: 5. DESIGN ELECTRICAL RATING (NET MWE):                                      1065                l                                                                          l
: 5. DESIGN ELECTRICAL RATING (NET MWE):                                      1065                l                                                                          l
                                                                         ------- -                  l                                                                          [
                                                                         ------- -                  l                                                                          [
: 6. MAXIMUM DE PE ND ABLE CAP AC ITY (GROSS MWElt 1098                                          l                                                                          l l                                                                          l 7 MAXIMUM DEPENDABLE CAPACITY (NET MWE):                                    1035                I                                                                          l
: 6. MAXIMUM DE PE ND ABLE CAP AC ITY (GROSS MWElt 1098                                          l                                                                          l l                                                                          l 7 MAXIMUM DEPENDABLE CAPACITY (NET MWE):                                    1035                I                                                                          l
                                                                                                                                                    --- --------
                                                                                                                                                                                   *re
                                                                                                                                                                                   *re
                                                                                                                                       ~
                                                                                                                                       ~
Line 167: Line 82:
THIS MONTH                YR-TO-DATE                    CUMULATIVE 11 HOURS IN REPORTING PERIOD                                                                          674                      1,416                        36,696 12 NUMBER OF HOURS RCACTOR WAS CRITICAL                                                                672                      1,243                        29,352
THIS MONTH                YR-TO-DATE                    CUMULATIVE 11 HOURS IN REPORTING PERIOD                                                                          674                      1,416                        36,696 12 NUMBER OF HOURS RCACTOR WAS CRITICAL                                                                672                      1,243                        29,352
: 13. REAC10R RESERVE SHUTDOWN HOURS                                                                    0.0                          0.0                              0.0
: 13. REAC10R RESERVE SHUTDOWN HOURS                                                                    0.0                          0.0                              0.0
                                                                                        ---_--_-_-__                  ...
                                                                                                                                        ---
                                                                                                                                                    - - _ _ _          __
: 14. HOURS GENERATOR ON-LINE                                                                          672.0                  1,226.7                      28,656.6
: 14. HOURS GENERATOR ON-LINE                                                                          672.0                  1,226.7                      28,656.6
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                        00                          0.0                              0.0
: 15. UNIT RESERVE SHUTDOWN HOURS                                                                        00                          0.0                              0.0
: 16. GRO,5 THERMAL ENEhGY GENERATED (MWH)                                                    2,185,027                  3,800,897                    78,675,033
: 16. GRO,5 THERMAL ENEhGY GENERATED (MWH)                                                    2,185,027                  3,800,897                    78,675,033
                                                                                        ----_--_---_                --                                                      _-
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                                        726,440              1,252,100                    25,480,210
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                                                        726,440              1,252,100                    25,480,210
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                          705,405              1,212,313                    24,455,456
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)                                                          705,405              1,212,313                    24,455,456
: 19. UNIT SERVICE F AC TOR                                                                            100.0                        86.6                            78.1
: 19. UNIT SERVICE F AC TOR                                                                            100.0                        86.6                            78.1
: 20. UNIT AVAILABILITY FACTOR                                                                        100.0                        86.6                            78.1
: 20. UNIT AVAILABILITY FACTOR                                                                        100.0                        86.6                            78.1
                                                                                        -                            - - - - - - _
: 21. UNIT CAPACITY FACTOR (USING MOC NET)                                                            101 4                        82 7                              64.4
: 21. UNIT CAPACITY FACTOR (USING MOC NET)                                                            101 4                        82 7                              64.4
_
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                              98.6                        80.4'                            62.6
: 22. UNIT CAPACITY FACTOR (USING DER NET)                                                              98.6                        80.4'                            62.6
                                                                                        --                          -
                                                                                                                                            --
                                                                                                                                                    ----              - --
: 23. UNIT FORCED OUTAGE RATE                                                                            0.0                          1. 6
: 23. UNIT FORCED OUTAGE RATE                                                                            0.0                          1. 6
* 7.3*
* 7.3*
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
: 25. IF SHUTOOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                                                N/A
: 25. IF SHUTOOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:                                                                N/A
: 26. UN11S IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):                                                    FORECAST                  ACHIEVED INITIAL CRITICALITY
: 26. UN11S IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):                                                    FORECAST                  ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION                                                                              -
                                                                                                                                                  ---
INITIAL ELECTRICITY COMMERCIAL OPERATION                                                                              -
                                                                                                                - -
                                                                                                                                                -
_
* Includes a carrection which accet:nta for incorrect ICR reported in January report.
* Includes a carrection which accet:nta for incorrect ICR reported in January report.
m correct PCR for January is 3.5%
m correct PCR for January is 3.5%


                                                                                                                                    .
UNIT SHUT OOWNS AND POWER REDUCTIONS                  DOCKET NO. 50 - 27S                        .
UNIT SHUT OOWNS AND POWER REDUCTIONS                  DOCKET NO. 50 - 27S                        .
                                                                                                    -      -----
UNIT NAME PEACH BOTTOM UNIT 3 DATE MARCH 10,1979 REPORT MONTH FEBRUARY, 1979                  COMPLETED BY PHILADtLPHIA ELECTRIC COMPANY W.M.ALDEN ENG I NE E A-IN -C H ARGE NUCLEAR SECTION GENERATION DIVISION-NJCLEAR TELEPHDNE (215) 841-5022 I        l    l          I        l METHOD OF l LICENSEE    lSYSTEMICOMPONENTl CAUSE AND CORRECilVE l      ITYPElDURATIONIREASONISHUTTING DOWN1        EVENT    l CODE I    CODE  I    ACTION TO                                  ,
UNIT NAME PEACH BOTTOM UNIT 3 DATE MARCH 10,1979 REPORT MONTH FEBRUARY, 1979                  COMPLETED BY PHILADtLPHIA ELECTRIC COMPANY W.M.ALDEN ENG I NE E A-IN -C H ARGE NUCLEAR SECTION GENERATION DIVISION-NJCLEAR TELEPHDNE (215) 841-5022 I        l    l          I        l METHOD OF l LICENSEE    lSYSTEMICOMPONENTl CAUSE AND CORRECilVE l      ITYPElDURATIONIREASONISHUTTING DOWN1        EVENT    l CODE I    CODE  I    ACTION TO                                  ,
NO.I    DATE I (111 (HOURS)l      (2) l REACTOR (3) l REPORT 4    l  (4) I    (5)  l PRE 9ENT RECURRENCE                            I
NO.I    DATE I (111 (HOURS)l      (2) l REACTOR (3) l REPORT 4    l  (4) I    (5)  l PRE 9ENT RECURRENCE                            I I        I    I          I        I            I            I        I        I                                                i 3 1 790203 1 S l      0.0  l    F l      1      1  NONE    i RC l ZZZZZZ l MANUAL REDUCTION IN PDWER TO ADJUST CONTROL ROD    {
                                                                                                                                      ,
I        I    I          I        I            I            I        I        I                                                i 3 1 790203 1 S l      0.0  l    F l      1      1  NONE    i RC l ZZZZZZ l MANUAL REDUCTION IN PDWER TO ADJUST CONTROL ROD    {
l      l    l          l        l            l            l        l        l PATTERN                                        ,
l      l    l          l        l            l            l        l        l PATTERN                                        ,
                                                                                                                                      '
I      I    i - -- -- 1          I            I            I        I        I I      I    I -        1        I            I            I        I        I                                                t 4
I      I    i - -- -- 1          I            I            I        I        I I      I    I -        1        I            I            I        I        I                                                t
4 (1)                      (2)                                              (3)                          (4)
                                                                                                                                        ,
4 4
(1)                      (2)                                              (3)                          (4)
F - FORCED        REASON                                            METHOD                        EXHIBIT G- INSTRU;TIONS S - SCHEDULED      A - ECUIPMENT FAILURE (EXPLAIN)                    1 - MANUAL                  FOR PREPARATION OF DATA 6 - MAINTEN ANCE OR TE ST                          2 - MANUAL SCRAM,            ENTRY SHEETS FOR LICENSEE C - REFUELING                                      3 - AUTOMATIC SCRAM.          EVENT REPORT (LER)
F - FORCED        REASON                                            METHOD                        EXHIBIT G- INSTRU;TIONS S - SCHEDULED      A - ECUIPMENT FAILURE (EXPLAIN)                    1 - MANUAL                  FOR PREPARATION OF DATA 6 - MAINTEN ANCE OR TE ST                          2 - MANUAL SCRAM,            ENTRY SHEETS FOR LICENSEE C - REFUELING                                      3 - AUTOMATIC SCRAM.          EVENT REPORT (LER)
D - REGULATORY RESTRICTION                        4 - OTHER (EXPLAIN)              FILE (NUREG-Ol61)
D - REGULATORY RESTRICTION                        4 - OTHER (EXPLAIN)              FILE (NUREG-Ol61)
Line 216: Line 110:
G - OPERATIONAL ERROR (EXPLAIN)
G - OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)                                                              EXhlBIT I - SAME SOURCE I
H - OTHER(EXPLAIN)                                                              EXhlBIT I - SAME SOURCE I
h
h u
                                                                                                                                      !
u


.
    -
Ibcket !!a. 50-277
Ibcket !!a. 50-277
  .
                                                                 /,',tachmen t to Ibnthly Operating lieport liEFTIEhl flG J ';FOMIATIO!!            "        9 1    Ilace of facility:
                                                                 /,',tachmen t to Ibnthly Operating lieport liEFTIEhl flG J ';FOMIATIO!!            "        9 1    Ilace of facility:
Feach Bottom Unit 2
Feach Bottom Unit 2
Line 244: Line 133:
: 9. The projected date of the 1,ct refueling t ha t enn be cicenarced to the opent fuel peol acnumine; the precen' lier:nned capac i ty-September, 1990
: 9. The projected date of the 1,ct refueling t ha t enn be cicenarced to the opent fuel peol acnumine; the precen' lier:nned capac i ty-September, 1990


        '
Ibcket th. 50-278 Attaciunent to IIonthly Operating lieport IlEFUEh11;G ' ' IOliMATIOf1
.
* Ibcket th. 50-278
    -
Attaciunent to IIonthly Operating lieport IlEFUEh11;G ' ' IOliMATIOf1
: 1.  !!am of facility:
: 1.  !!am of facility:
Peach llottom Unit 3
Peach llottom Unit 3
Line 272: Line 157:
September, 1991
September, 1991


      -
,  .
  .
IIARRATIVE SD24ARY OF OPERATII!G EXPElIE!;CES PEACH BOTTOM U'IITS 2 and 3 Februart, 1979 UlIIT 2 The unit operated at full power until February 9 when a controlled chutdown was begun for a maintenance outage to repair an external leak on the reactor feed pump bypacc line. Additional work completed during the outage included feedwater heater leak repair, recombiner condencer leak repair and reactor feed pump external leak repair.
IIARRATIVE SD24ARY OF OPERATII!G EXPElIE!;CES PEACH BOTTOM U'IITS 2 and 3 Februart, 1979 UlIIT 2 The unit operated at full power until February 9 when a controlled chutdown was begun for a maintenance outage to repair an external leak on the reactor feed pump bypacc line. Additional work completed during the outage included feedwater heater leak repair, recombiner condencer leak repair and reactor feed pump external leak repair.
Maintenance work nac completed and the unit was returned to service on February 1h, reaching 1030 IOle on February 16. On February 16, a load reduction to $60 IG'o was taken to adjust the control rod pattern. Load was then increaced via a preconditioning rarp with full power being reached on February 13. On Februarf 19, during calibration of a feedwater flow trancaitter, n recirculation pump runback occurred resulting in a 90 IOle load reduction. Load was rectored immediately.
Maintenance work nac completed and the unit was returned to service on February 1h, reaching 1030 IOle on February 16. On February 16, a load reduction to $60 IG'o was taken to adjust the control rod pattern. Load was then increaced via a preconditioning rarp with full power being reached on February 13. On Februarf 19, during calibration of a feedwater flow trancaitter, n recirculation pump runback occurred resulting in a 90 IOle load reduction. Load was rectored immediately.

Latest revision as of 03:28, 22 February 2020

Monthly Operating Rept for Feb 1979
ML19282B991
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/10/1979
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19282B990 List:
References
NUDOCS 7903190224
Download: ML19282B991 (9)


Text

'

AVERAGE DAILY UNIT POWER LEVEL

. DOCKET NO. 50 - 277

$ UNIT PEACH BOTTOM UNIT 2 DATE MARCH 10,1979 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH FEBRUARY 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1077 17 751 2 1075 18 1026 3 1075 19 1066 4 1072 20 1074 5 1074 21 1074 6 1075 22 1079 7 1075 23 1057 8 1061 24 953 9 967 25 1067 10 10 26 1070 11 0 27 1076 12 0 28 1069 13 0 14 29 15 589 16 892 7903190227

. OPERATING DATA REPORT DOCKET NO. 50 - 277 DATE MARCH 10,1979 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDFN ENGINEER-IN-CHARGE NUCLEAR SECTION GENER ATION DIVISION-NUCL E AR TELEPHONE (215) e41-5022 OPERATING STATUS

1. UNIT NAME: PEACH BOTTOM UNIT 2 l NOTES: THIS UNIT EXPERIENCED ONE l l l
2. RE PORT ING PERIOD: FEBRUARY, 1979 l OUTAGE THIS MONTH l l l
3. LICENSED THERMAL POWER (MWT): 3293 I I l g
4. NAMEPLATE RATING (CROSS MWE): 1152 l I l l
5. DE SIGN E LECTRICAL RATING (NET MWE ): 1065 l l l l
6. MAXIMUM DEPENDAPLE CAPACITY (GROSS MWE): 1098 l 1 l l
7. MAXIMUM DEPENDABLE C APACITY (NET MWE ): 1051 l l
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY INET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH 'YR-10-DATE CUMULATIVE HOURS IN REPORTING PERIOD 672 1,416 40,000

12. N' U.

. ..M B E R OF HOURS RE ACTOR WAS CRITICAL 567 1,311 30,730

}3. REACTOR RESERVE SHUT 00WN HOURS 0.0 0.0 0.0 44, HOURS GENERATOR ON-LINE 557.4 1,301.4 29,987.7

15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1,728,919 4,097,129 84,118,086 l i. GROSS ELECTRICAL ENERGY GENER ATED IMWH) 579,010 1,369,830 27,535,760
18. NET ELECTRICAL ENERGY GENER ATED (MWH) 561.729 1,327,395 26,368,750
19. UNI T SERVICE FACTOR 82 9 91.9 73.5
20. UNIT AVAILABILITY FACTOR 82.9 91.9 73.5
21. UNIT CAPACITY FACTOR IUSING MDC NET) 79.5 89.2 61.5
22. UNIT CAPACITY FACTOR (USING DER NET) 78.5 88.0 60.7
23. UNIl FOPCED DUTAGE RATE 5.4 2.4 7.6
24. SHUIDOWNS SCHEDULED DVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF S HUT OCWN AT END OF REPCRT PERICD, ESTIMATED DATE OF STARTUP: N/A
26. UNI T S IN TEST STATUS (PRIOR TO COMMEPCIAL OPERATION): FCRECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION b

UNIT SHUT 00wNS AND POWER REDUCTIONS DOCKET NO. 50 - ??? .

UNIT NAME RSACH 90TTCM UNIT 2 DATE WARCH 10,1979 REPORT MONTH FEBRUARY, 1979 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCtEAR SECTION GENERATION DIVI S ICN-NUL L E AR TELEPHONE (215) P41-5022 l 1 I l l METHOD OF l L ICE NSE E ISYSTEMICDMPONENil CAUSE AND CORRECTIVE I I T YPE I OURA T IONl RE A SONI SHUT T ING DOWNI EVENT l C 00E I CODE I ACTICN TO NO.I DATE i Illi (HOURS)l (2) i REACTOR (3) 1 REPORT s 1 (4) 1 (5) l PREVENT RECURRENCE -

1 I I I I I I I l 2 I 790210 l F l 32.0 l A I 1 l NONE I HH l XXXXXX l EXTERNAL PIPE LEAK ON PEACTCR FEEOPUMP BYPASS I I I I I I I I I LINE I I l l I I I I I 2 1 790210 l 5 l 82.6 l 8 l 1 1 NONE I CH l HTEXCH l FEE 0 WATER HEATER REPAIR (CONTINU?OUS FROM i i l I I i l i I 790210)

! I I ----- 1 I i i l i l .

l I i 114.6 l l 1 l l (1) (2) (3) (4)

F - FORCED REASON METHC0 EXHIBIT G- INSTRUCTIONS '

S - SCHE 00 LEO A - EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER) 0 - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-Ol61)

E - OPERA 10R TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE i

e I

.c 'Y

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE MARCH 10,1979 COMPANY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN ENGINEER-IN-CHARGE NUCLEAR SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH FEBRUARY 1979 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 1066 17 1066 2 1059 18 1063 3 781 19 1065 4 1026 20 1062 5 1064 21 1065 6 1065 22 1068 7 1064 23 1068 8 1064 24 1060 9 1067 25 1008 10 1062 26 1057 11 1061 27 1051 12 1065 28 1056 13 1066 14 1066 15 1063 16 1066

, ~ ~ ~ _._

DOCKET NO. 50 - 278

  • =- - -----_

DATE MARCH 10,1979 COMPLE TED BY PHILADELPHIA ELECTRIC COMPANY W.M.ALDEN E NGI N E E P.-I N-CH AR GE NUCLEAR SECTION GE NER ATION DIVISION-NUCL F A R TELEPHONE (215) 841-5022 OPERATING STATUS 1 UNIT NAM 5: PEACH BOTTOM UNIT 3 l NOTES: THIS UNIT EXPERIENCED ONE i

_-_ __--- -_--_---_-_--- -- g l

2. REPORTING PERIOD: FEBRUARY, 1979 l M4JOR POWER REDUCTION THIS l l l 3 L ICENSE D THERMAL POWER (MWT): 3293 l MONTH I

_ _ - - _ . _ - - - - _ _ _ g  ;

4. NAMEPLATE RATING (GROSS MWE); 1152 l 1 i (
5. DESIGN ELECTRICAL RATING (NET MWE): 1065 l l

- l [

6. MAXIMUM DE PE ND ABLE CAP AC ITY (GROSS MWElt 1098 l l l l 7 MAXIMUM DEPENDABLE CAPACITY (NET MWE): 1035 I l
  • re

~

8. IF CHAN0tS OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE RE A SC*i$ i
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
10. REASONS FOR RESTRICTIONS, IF ANY:

THIS MONTH YR-TO-DATE CUMULATIVE 11 HOURS IN REPORTING PERIOD 674 1,416 36,696 12 NUMBER OF HOURS RCACTOR WAS CRITICAL 672 1,243 29,352

13. REAC10R RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 672.0 1,226.7 28,656.6
15. UNIT RESERVE SHUTDOWN HOURS 00 0.0 0.0
16. GRO,5 THERMAL ENEhGY GENERATED (MWH) 2,185,027 3,800,897 78,675,033
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 726,440 1,252,100 25,480,210
18. NET ELECTRICAL ENERGY GENERATED (MWH) 705,405 1,212,313 24,455,456
19. UNIT SERVICE F AC TOR 100.0 86.6 78.1
20. UNIT AVAILABILITY FACTOR 100.0 86.6 78.1
21. UNIT CAPACITY FACTOR (USING MOC NET) 101 4 82 7 64.4
22. UNIT CAPACITY FACTOR (USING DER NET) 98.6 80.4' 62.6
23. UNIT FORCED OUTAGE RATE 0.0 1. 6
  • 7.3*
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
25. IF SHUTOOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
26. UN11S IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION -
  • Includes a carrection which accet:nta for incorrect ICR reported in January report.

m correct PCR for January is 3.5%

UNIT SHUT OOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 27S .

UNIT NAME PEACH BOTTOM UNIT 3 DATE MARCH 10,1979 REPORT MONTH FEBRUARY, 1979 COMPLETED BY PHILADtLPHIA ELECTRIC COMPANY W.M.ALDEN ENG I NE E A-IN -C H ARGE NUCLEAR SECTION GENERATION DIVISION-NJCLEAR TELEPHDNE (215) 841-5022 I l l I l METHOD OF l LICENSEE lSYSTEMICOMPONENTl CAUSE AND CORRECilVE l ITYPElDURATIONIREASONISHUTTING DOWN1 EVENT l CODE I CODE I ACTION TO ,

NO.I DATE I (111 (HOURS)l (2) l REACTOR (3) l REPORT 4 l (4) I (5) l PRE 9ENT RECURRENCE I I I I I I I I I I i 3 1 790203 1 S l 0.0 l F l 1 1 NONE i RC l ZZZZZZ l MANUAL REDUCTION IN PDWER TO ADJUST CONTROL ROD {

l l l l l l l l l PATTERN ,

I I i - -- -- 1 I I I I I I I I - 1 I I I I I t 4

4 (1) (2) (3) (4)

F - FORCED REASON METHOD EXHIBIT G- INSTRU;TIONS S - SCHEDULED A - ECUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA 6 - MAINTEN ANCE OR TE ST 2 - MANUAL SCRAM, ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-Ol61)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXhlBIT I - SAME SOURCE I

h u

Ibcket !!a. 50-277

/,',tachmen t to Ibnthly Operating lieport liEFTIEhl flG J ';FOMIATIO!! " 9 1 Ilace of facility:

Feach Bottom Unit 2

2. Schedaled date for next refueling chu tdown:

March 22, 1980

3. Scheduled date for restart following refueling:

June 6, 1980 14 Will refueling or recumption of operation thereaf ter require a technical specification change or other license amendment?

Yes.

If annwer la yea, what, in general, will these be?

Technical opecification changea to accomodate reload fuel.

Modifications to reactor core operating limito are expected.

$. Scheduled date (a) for submit ting proponed licensing action and supporting information:

February 8, 1980

6. Important licensing c.onsiderationo associated with refueling, e.g. ,

new or different fuel design or cupplier, unreviewed decign or performance analysis methods, cignificant changen in fuel design, new operating procedures:

Initial utilizataan of General Electric pre-pressurized Fuel Assemblica.

7. The number of fuel aaacablico (a) in the core and (b) in the opent fuel storage pool:

a) Core - 7614 Fuel Accemblies b) Fuel pool - 618 Irraidated Fuel Assemblies i3. The precent licenced crent fuel pool s tora 6e capacity and the size of any increase in licensed storage capacity that han been requeated or is planned, in number of fuel accemblier -

Original inatalled capacity la 1110 fuel ecoemblies. An increase in capacity to 2816 fuel assembliec has been liccnced, prcriding capacity for 1706 additional fuel accemblioc. Flant radifications to be completed prior to next refueling.

9. The projected date of the 1,ct refueling t ha t enn be cicenarced to the opent fuel peol acnumine; the precen' lier:nned capac i ty-September, 1990

Ibcket th. 50-278 Attaciunent to IIonthly Operating lieport IlEFUEh11;G ' ' IOliMATIOf1

1.  !!am of facility:

Peach llottom Unit 3

2. Scheduled date for next refueling ohutdown:

September 8, 1979

3. Scheduled date for restart following refueling:

I Octuier 27, 1979

h. k'ill refueling or renumption of operation thereaf ter rer;uire a technical npecification change or other licence amendment?

Yes.

If answer in yen, what, in general, will thene be?

Technical opecification changen to acecmodate reload fuel.

Modifications to recc tor core operating linito are expected.

$. Scheduled date (a) for nubmitting proposed licensing action and supporting information:

July 25, 1979

6. Important licencing conniderationo aanociated with refueling, e.g. ,

new or different fuel design or cupplier, unrn"uved denign or performance analynic methodo, ni Gnificant cV16cn in f"el design, new operating procedurco:

Initial utilization of General Electr c pre-preccuriced Fuel Accemblico.

7. The number of fuel accenfolien (a) in the c ire and (b) in the opent fuel otorage pool:

a Core - 76h Fuel Ascemblies b Fuel poel - hh0 Irradiated Fue1 Assemblier

8. The precent licensed opent fuel pool ctor. ge capacity ,nd the cine of any increase in licence <1 otorage capac _ ty tha t han r een requec ted or is planned, in number of fuel assemblion:

Original inctalled capacity le 1110 Juel acaemblies. An increase in capacity to 2816 fuel asceablies has b'en licensed, pe"iding capacity for 1706 additional fuel accembl..ec. Plant modificationa to be completed prior to next refueling.

9 The projected date of the lact refueling t ha t can be dj acharred to the opent fuel pool acruning the preacnt liconced enrncit :

September, 1991

IIARRATIVE SD24ARY OF OPERATII!G EXPElIE!;CES PEACH BOTTOM U'IITS 2 and 3 Februart, 1979 UlIIT 2 The unit operated at full power until February 9 when a controlled chutdown was begun for a maintenance outage to repair an external leak on the reactor feed pump bypacc line. Additional work completed during the outage included feedwater heater leak repair, recombiner condencer leak repair and reactor feed pump external leak repair.

Maintenance work nac completed and the unit was returned to service on February 1h, reaching 1030 IOle on February 16. On February 16, a load reduction to $60 IG'o was taken to adjust the control rod pattern. Load was then increaced via a preconditioning rarp with full power being reached on February 13. On Februarf 19, during calibration of a feedwater flow trancaitter, n recirculation pump runback occurred resulting in a 90 IOle load reduction. Load was rectored immediately.

The unit operated at lated power until Febrnry 23 when a load reduction to 750 Isle was taken to perfom a rod cequence exchange and to repair a condencer leak. The unit then increased in load, via a preconditioning ramp, reaching full power on Februar/ 2h.

UIITT 3 The unit operated at rated power until February 2 when a load reduction to about $80 M4e was taken to adjust the control rod pattern. Following the adjustment, load was increased via a preconditioning ramp with full load being reached on February L. On February 25 a load drop of approximately 100 IOle was taken to accocmodate control rod adjustments.

On February 26, an incert colenoid on a control rod drive failed open, during normal control rod drive exercising, fully incerting the drive at normal drive speed. Following repairs to the colenoid valve, a load drop of 1$0 Nie was required to withdraw the control rod to its fo mer position. The unit returned to full power on February 27