ML19210D124: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.. | {{#Wiki_filter:. . | ||
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June YEAR 1978 (Revised 11-05-79) | |||
SUBMITTED: | SUBMITTED: | ||
hD dLut>D__._ | hD dLut>D__._ | ||
SUPERIffENDENT - OPERATIONS APPROVED: ,R 1367 292 19nn oo 5M | SUPERIffENDENT - OPERATIONS APPROVED: | ||
,R 1367 292 19nn oo 5M | |||
4.i b OPERATING DATA REPORT DATE 11-5 74 CO51PLETED BY u _ p PNIison TELEPHONE .700 Ro4-5151 OPERATING STATUS | |||
: 1. Unit Name: | 4 . | ||
i b OPERATING DATA REPORT DATE 11-5 74 CO51PLETED BY u _ p PNIison TELEPHONE .700 Ro4-5151 OPERATING STATUS | |||
: 1. Unit Name: florth Anna Unit 1 Notes Commercial | |||
: 2. Reporting Period: | : 2. Reporting Period: | ||
, | une, M (Revised) ,_ 6-6-78 0001 3.. Licensed Thermal Power (31Wt): 2775 , | ||
2775 , | : 4. NamepLte Rating (Gross 51We): 947 ' | ||
: 5. Design Electrical Rating (Net SIWE): 907 | |||
: 6. 51aximum Dependable Capacity (Gross 51We): 920 | |||
: 7. Sf aximum Dependable Capacity (Net 51We): | |||
893 | |||
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason 3: | : 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason 3: | ||
N/A , 9. Power Level To which Restricted,if Any (Net 51We): | N/A , | ||
fl/A 10. Reasons For Restri..tions. If Any: | : 9. Power Level To which Restricted,if Any (Net 51We): fl/A | ||
N/A This Stonth Yr..to.Date Cumulative 600 600 600 11. Hours in Reporting Period 69.1 597.1 597.I | : 10. Reasons For Restri..tions. If Any: N/A This Stonth Yr..to.Date Cumulative 600 600 600 | ||
: 15. Unit Reserve Shutdown Hours 0 0 0 16. Gmss Thermal Energy Generated (51WH) 1,482,537 1482.537 1.482.537 17. Gros. Electrical Energy Generated (51WH) 480, | : 11. Hours in Reporting Period | ||
U6 0.6 0.6 23. Unit F(,rced Outage Rate | : 12. Number Of Ilours Reactor Was Critical 69.1 597.1 597.I | ||
: 13. Reactor Reserve Shutdown Hours 2.9 2.9 2.9 | |||
Maintenance, August 1-8, 1978 (7 Days)25. If Shut Down At End Of Report Period. Estimated Date of Startup: | : 14. liours Generator On4.Ine 596.2 596.2 596.2 | ||
: 20. Units in Test Status (Prior to Commercial Operation): | : 15. Unit Reserve Shutdown Hours 0 0 0 | ||
Forecast Achiesed 4-5-78 0716 | : 16. Gmss Thermal Energy Generated (51WH) 1,482,537 1482.537 1.482.537 | ||
: 17. Gros. Electrical Energy Generated (51WH) 480,915 _ _ . | |||
480.915 480,915 | |||
: 18. Net E!tetrical Energy Generated (SiWH) 449,108 449,108 449,108 | |||
: 19. Unit Service Factor 99.4 99.4 99.4 | |||
: 20. Unit Availability Factor 99 4 99 4 99.4 | |||
: 21. Unit Capacity Factor (Using 5f DC Net) 83.4 83.4 83.4 | |||
: 22. Unit Capac'ty Factor (Using DER Net) 82.b 82.5 82.5 U6 0.6 0.6 | |||
: 23. Unit F(,rced Outage Rate | |||
: 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eacht: | |||
Maintenance, August 1-8, 1978 (7 Days) | |||
: 25. If Shut Down At End Of Report Period. Estimated Date of Startup: | |||
: 20. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed 4-5-78 INITIAL CRITICALITY 0716 INITIAL ELECTRICITY 4-1/-78 2208 C05131ERCIAL GetRATION g._g_78 0001 1367 '293 - | |||
(0/77 )}} |
Latest revision as of 05:23, 2 February 2020
ML19210D124 | |
Person / Time | |
---|---|
Site: | North Anna |
Issue date: | 11/05/1979 |
From: | Wil Madison VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
To: | |
Shared Package | |
ML19210D121 | List: |
References | |
NUDOCS 7911200558 | |
Download: ML19210D124 (2) | |
Text
. .
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH June YEAR 1978 (Revised 11-05-79)
SUBMITTED:
hD dLut>D__._
SUPERIffENDENT - OPERATIONS APPROVED:
,R 1367 292 19nn oo 5M
4 .
i b OPERATING DATA REPORT DATE 11-5 74 CO51PLETED BY u _ p PNIison TELEPHONE .700 Ro4-5151 OPERATING STATUS
- 1. Unit Name: florth Anna Unit 1 Notes Commercial
- 2. Reporting Period:
une, M (Revised) ,_ 6-6-78 0001 3.. Licensed Thermal Power (31Wt): 2775 ,
- 4. NamepLte Rating (Gross 51We): 947 '
- 5. Design Electrical Rating (Net SIWE): 907
- 6. 51aximum Dependable Capacity (Gross 51We): 920
- 7. Sf aximum Dependable Capacity (Net 51We):
893
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reason 3:
N/A ,
- 9. Power Level To which Restricted,if Any (Net 51We): fl/A
- 10. Reasons For Restri..tions. If Any: N/A This Stonth Yr..to.Date Cumulative 600 600 600
- 11. Hours in Reporting Period
- 12. Number Of Ilours Reactor Was Critical 69.1 597.1 597.I
- 13. Reactor Reserve Shutdown Hours 2.9 2.9 2.9
- 14. liours Generator On4.Ine 596.2 596.2 596.2
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gmss Thermal Energy Generated (51WH) 1,482,537 1482.537 1.482.537
- 17. Gros. Electrical Energy Generated (51WH) 480,915 _ _ .
480.915 480,915
- 18. Net E!tetrical Energy Generated (SiWH) 449,108 449,108 449,108
- 19. Unit Service Factor 99.4 99.4 99.4
- 20. Unit Availability Factor 99 4 99 4 99.4
- 21. Unit Capacity Factor (Using 5f DC Net) 83.4 83.4 83.4
- 22. Unit Capac'ty Factor (Using DER Net) 82.b 82.5 82.5 U6 0.6 0.6
- 23. Unit F(,rced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Stonths(Type.Date.and Duration of Eacht:
Maintenance, August 1-8, 1978 (7 Days)
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 20. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed 4-5-78 INITIAL CRITICALITY 0716 INITIAL ELECTRICITY 4-1/-78 2208 C05131ERCIAL GetRATION g._g_78 0001 1367 '293 -
(0/77 )