ML20154C788: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20154C788
| number = ML20154C788
| issue date = 02/24/1986
| issue date = 02/24/1986
| title = Responds to 851209 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-160/85-03 & 50-276/85-02.Violation 2,Subpart a Deleted.Response to Subparts b-d Required within 30 Days
| title = Responds to Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-160/85-03 & 50-276/85-02.Violation 2,Subpart a Deleted.Response to Subparts b-d Required within 30 Days
| author name = Walker R
| author name = Walker R
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8603050320
| document report number = NUDOCS 8603050320
| title reference date = 12-09-1985
| document type = CORRESPONDENCE-LETTERS, NRC TO EDUCATIONAL INSTITUTION, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO EDUCATIONAL INSTITUTION, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
}}
}}
See also: [[followed by::IR 05000160/1985003]]
See also: [[see also::IR 05000160/1985003]]


=Text=
=Text=

Latest revision as of 12:31, 10 December 2021

Responds to Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-160/85-03 & 50-276/85-02.Violation 2,Subpart a Deleted.Response to Subparts b-d Required within 30 Days
ML20154C788
Person / Time
Site: Neely Research Reactor, 05000276
Issue date: 02/24/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Karam R
Neely Research Reactor, ATLANTA, GA
References
NUDOCS 8603050320
Download: ML20154C788 (1)


See also: IR 05000160/1985003

Text

o/Nebeb/ )

Georgia Institute of Technology

ATTN: Dr. Ratib A. Karam, Director

of Nuclear Research Center

900 Atlantic Drive, N.W.

Atlanta, GA 30332

Gentlemen:

SUBJECT: INSPECTION REPORT NOS. 50-160/85-03 AND 50-276/85-02

Our letter dated January 9,1986, in response to your letter of December 9,1985,

stated that your response to the Notice of Violation enclosed with the above

report was under review and that you would be notified of the results of this

review at a later date.

In response to Violation 1, concerning sampling for liquid effluent releases, we

have reviewed the steps you have taken to correct this violation and will examine e

the implementation of your corrective actions during future in:pections.

With regard to Violation 2, subpart a, we agree with your position and have

deleted the subpart from our records.

Violation 2, subparts b, c and d were not addressed in your December 9,1985,

response. Therefore, in accordance with the requirements of 10 CFR 2.201,

please submit to this office within 30 days of the date of this letter, a written

statement which includes admission or denial of subparts b, c and d of the

alleged violation, the reason for the violation, if admitted, the corrective

steps which have been taken and the results achieved, corrective steps which

will be taken to avoid further violations, and the date when full compliance

will be achieved.

The responses directed by this letter and the enclosure are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

We appreciate your cooperation in this matter.

Sincerely,

BAS!"B1MK1bv

Roger D. Walker, Director

Division of Reactor Projects

cc: vDr. T. E. Stelson, Vice President

for Research

bec:. License Fee Management Branch

Document Control Desk

State of Georgia

-..

kn' DC i s. tohr f o r. Lei V nc ia

.

2/g/86

C

/86 /4 /86 2/29/86 pj

2/\( /86 2//7 2{C(/86

8603050320 860224 g

PDR ADOCK 05000160 0

G PDR t

1 20/

_ _ _ _ _ ___ _ _ . _ _