Attachment 1 contains the Semiannual Radioactive Effluent Release Report for Big Rock Point Plant for the period January 1987 through June 1987. This l  report is submitted in accordance with 10CFR50.36a(2) and Big Rock Point Technical Specification 6.9.2.2.
Attachment 1 contains the Semiannual Radioactive Effluent Release Report for Big Rock Point Plant for the period January 1987 through June 1987. This l  report is submitted in accordance with 10CFR50.36a(2) and Big Rock Point Technical Specification 6.9.2.2.
Attachment 2 contains a revised Semiannual Radioactive Effluent Release Report for the period January through June 1986. This revised report is being submitted as requested by the NRC during an effluent records inspection (87-009). The revisions account for a small emergency condenser tube leak which is suspected to have developed during the first quarter of 1986. Areas that have been changed are identified by a vertical line in the right-hand margin. This revised submittal supersedes the report submitted by our              q August 28, 1986 letter.
Attachment 2 contains a revised Semiannual Radioactive Effluent Release Report for the period January through June 1986. This revised report is being submitted as requested by the NRC during an effluent records inspection (87-009). The revisions account for a small emergency condenser tube leak which is suspected to have developed during the first quarter of 1986. Areas that have been changed are identified by a vertical line in the right-hand margin. This revised submittal supersedes the report submitted by our              q {{letter dated|date=August 28, 1986|text=August 28, 1986 letter}}.
i Attachment 3 contains a revised Semiannual Radioactive Effluent Release Report      '
i Attachment 3 contains a revised Semiannual Radioactive Effluent Release Report      '
for L.e period July through December 1986. This revised report is also being submitted as requested by the NRC during the same effluent records inspection referenced above. The revisions account for the small emergency condenser tube leak and also correct the Sr-89 and Sr-90 release quantities to reflect actual analyses. The previous report was based on estimated values because our  contractor had not completed the actual analyses at the time the report was  due. Areas that have been changed are identified by a vertical line in the  right-hand margin. This revised report supersedes the report submitted by our  February 27, 1987 letter.
for L.e period July through December 1986. This revised report is also being submitted as requested by the NRC during the same effluent records inspection referenced above. The revisions account for the small emergency condenser tube leak and also correct the Sr-89 and Sr-90 release quantities to reflect actual analyses. The previous report was based on estimated values because our  contractor had not completed the actual analyses at the time the report was  due. Areas that have been changed are identified by a vertical line in the  right-hand margin. This revised report supersedes the report submitted by our  {{letter dated|date=February 27, 1987|text=February 27, 1987 letter}}.
k              -
k              -
AACCA -
AACCA -

Latest revision as of 11:25, 19 March 2021

Forwards Semiannual Radioactive Effluent Release Rept, Jan-June 1987, Revised Semiannual Radioactive Effluent Release Rept,Jan-June 1986 & Revised Semiannual Radioactive Effluent Release Rept,Jul-Dec 1986
ML20238A993
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 08/27/1987
From: Frisch R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20238A995 List:
References
NUDOCS 8709010023
Download: ML20238A993 (2)


Text

</ , ek o l

, Consumers power Pawsmus hlKMGAN'E PROGRESS  ;

oeneral Offices: 1945 West Parnell Roed, Jackson, MI 49201 . (517) 788-0550 August 27, 1987 '

Nuclear _ Regulatory Commission Document Control Desk Washington, DC 20555 1 l

l DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

l SEMIANNUAL RADI0 ACTIVE EFFLUENT RELEASE REPORT -

l JANUARY THROUCH JUNE 1987 l

Attachment 1 contains the Semiannual Radioactive Effluent Release Report for Big Rock Point Plant for the period January 1987 through June 1987. This l report is submitted in accordance with 10CFR50.36a(2) and Big Rock Point Technical Specification 6.9.2.2.

Attachment 2 contains a revised Semiannual Radioactive Effluent Release Report for the period January through June 1986. This revised report is being submitted as requested by the NRC during an effluent records inspection (87-009). The revisions account for a small emergency condenser tube leak which is suspected to have developed during the first quarter of 1986. Areas that have been changed are identified by a vertical line in the right-hand margin. This revised submittal supersedes the report submitted by our q August 28, 1986 letter.

i Attachment 3 contains a revised Semiannual Radioactive Effluent Release Report '

for L.e period July through December 1986. This revised report is also being submitted as requested by the NRC during the same effluent records inspection referenced above. The revisions account for the small emergency condenser tube leak and also correct the Sr-89 and Sr-90 release quantities to reflect actual analyses. The previous report was based on estimated values because our contractor had not completed the actual analyses at the time the report was due. Areas that have been changed are identified by a vertical line in the right-hand margin. This revised report supersedes the report submitted by our February 27, 1987 letter.

k -

AACCA -

Ral)h R Frisch Senior Licensing Analyst CC Administrator, Region III, NRC NRC Resident Inspector - Big Rock Point Plant h

(

Attachments d gy OC0887-0135-NLO4 L