Provides twenty-ninth Update of Big Rock Point Integrated Plan.Plan Has Had No Changes Since Last Update Dtd 980213. Proposed Defueled Facility OL & Tss,Currently Under Review by Nrc,No Longer Require Submission of Plan
ML20237B435
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 08/11/1998
From: Powers K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9808180261
Download: ML20237B435 (1)


Text

____..-_____._._____-_______ - - - - - -

CtxtsumersEnergy A CMS Eningy Cangwy Big Rock Point N, kar Rant Kennetir P. Peners 10269 US-31 North Site General Manager CWrevoix. MI 49720 August 11,1998 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 - 0001 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - INTEGRATED PLAN SEMI-ANNUAL UPDATE NUMBER 29.

As required by the current Big Rock Point Operating I icense, this letter provides the (29th) twenty-ninth update of the Big Rock Point Integrated Plan. There have been no changes to the Integrated Plan since the last update provided by letter dated February 13,1998. The proposed Defueled Facility Operating License and Technical Specifications, currently under review by the NRC, no longer require submission of this plan since the plant has been pennanently shutdown and is being decommissioned. The revised Facility Operating License and Technical Specifications are expected to be approved and issued prior to the next semi-annual integrated plan submittal. Therefore, this should be the final update of the Integrated Plan for the Big Rock Point facility.

}

Kenneth P Powers Site General Manager u

CC:

Administrator, Region 111, USNRC NRC Resident Inspector-Big Rock Point NRR Project Manager - OWFN y'

i 9808180261 900811 PDR ADOCK 05000155 W