ML20247G148

From kanterella
Jump to navigation Jump to search
Forwards Rev 14 to Plant Suitability,Training & Qualification Plan,Per Provisions of 10CFR50.54(p).Changes Are Editorial to Reflect Change from Consumers Power Co to Consumers Energy Co.Encl Withheld
ML20247G148
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/12/1998
From: Rang J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9805200151
Download: ML20247G148 (1)


Text

i CatssumersFnergy A CMS Energy Company Big Rock Posnt Nuclear Plant Kenne@ P. h m 10269 US 31 honn Ste GenwalManagu Chatevoix, MI 49720 May 12,1998 Nuclear Regulatory Commission Document Control Desk Washington, DC 20355 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

REVISION 14 TO TIIE SUITABILITY, TRAINING AND QUALIFICATION PLAN Attached is the Big Rock Point Plant Suitability, Training and Qualification Plan, Revision 14. The changes are editorial to reflect the change from Consumers Power Company to Consumers Energy

{

Company.

l Consumers Energy Company has determined that these changes do not degrade the safeguards effectiveness of the plans and, therefore, submit these changes under the provisions of 10 CFR 50.54(p).

l

\\

S mes S Rang usiness & Licensing h ge CC: Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point (W/O Attachment)

NRC/NRR Project Manager (W/O Attachment)

Attachments s

9n/t o

9805200151 980512 PDR ADOCK 05000155 F

PDR