Submits Update to Util 880725 Response to Violations Noted in Insp Rept 50-155/88-12.Corrective Actions:Util Staffed Procedure Writers Group to Upgrade Maint Procedures & Procedure MGP-14 Revised
ML20244A631
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 06/06/1989
From: Berry K
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8906120098
Download: ML20244A631 (2)


Text

_ _ _ _ _- _ ___ . _ _ _ _

i n ,. . .

~

C0flSum8IS P0Wer x.--* w n.m Direcwr MM Nuclear Lkensing SMO General Offices: 1945 West Pernall Road, Jackson, MI 49201 e (517) 788-1636 June 6,'1989-Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

' UPDATE TO VIOLATION RESPONSE FOR INSPECTION REPORT 88012 (LIMITORQUE VALVES OPERATORS)

Consumers Power Company's submittal, dated July 25, 1988 committed to revising maintenance procedures for the Limitorque Valve Operators prior to the 1989

. refueling outage. Due to workload priorities, only the procedures needed for the 1989 refueling outage will be presently completed. Procedures not needed during this 1989 refueling outage will be upgraded by our procedure writers group. Our revised responses to items 1 and 2 of the violation are as'follows:

Revised Responte to 50-153/88012 Violation Item 1 Since the' target of the 1989 refueling outage was estab31shed, Consumers Power Company decided to staff a procedure writers group dediented to upgrade all maintenance procedures. In order to prioritize this effort, the maintenance

-activities for the 1989 refueling outage were reviewed and those protadures needed for the outage were identified and revised first. No SMA-000 operators '

are being disassembled / reassembled this outage hence a procedure is not currently needed. However, should maintenance be required on a SMA-600 operator, the appropriate procedure will be revised and issued prior to disasserebly of the oporttor.

Revised Responae to 50-155/88012 Violation Item 2 An error was discovered in the original response which indicated lubrication requirements for the SMA-000 operators was located in procedure MGP-14. The response should have indicated MGP-25.

1 l

h I OC0689-0002-NLO2 I

)

8906120098 890606 PDR ADOCK 05000155 PDC Q

' **" Nu'c1her R:gulctory Commiczion - 2

, Pali 4ades Plant Update to Response to IR 88012 June 6, 1989 Only one SMA-3 operator is scheduled for overhaul during the 1989 Refueling Outage and the required procedure (MGP-14) has been revised. Should maintenance be required on these operators the necessary procedure vill be revised and issued prior to disassembly, r A _ fc,p Kenneth W Berry.

Director, Nuclear Licensing CC Administrator, Region III, USNRC NRC Resident Inspector - Big Rock Point OC0689-0002-NLO2