05000395/LER-1983-002, Forwards Updated LER 83-002/03L-1.Detailed Event Analysis Encl: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
(No difference)

Latest revision as of 02:09, 17 January 2021

Forwards Updated LER 83-002/03L-1.Detailed Event Analysis Encl
ML20071B905
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/22/1983
From: Dixon O
SOUTH CAROLINA ELECTRIC & GAS CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20071B906 List:
References
NUDOCS 8303010283
Download: ML20071B905 (2)


LER-2083-002, Forwards Updated LER 83-002/03L-1.Detailed Event Analysis Encl
Event date:
Report date:
3952083002R00 - NRC Website

text

, *  ;

. 1

%, o SOUTH CAROLihlA,ELgcTalc:& GAS COMPANY

,Nh*iyyc5ZMJ n'M j COLUMaiA. south CAROUNA 29218

o. W. DixON, JR. n . j v.c passioant suctuan onannous g g g y ]a;19g Mr. James P. O'Reilly, Director U.S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street, N.W.

Atlanta, Georgia 30303

SUBJECT:

Virgil C. Summer Nuclear Station Docket No. 50/395 Operating License No. NPF-12 Thirty Day Written Report LER 83-002, Revision 1

Dear Mr. O'Reilly:

Please find attached Licensee Event Report #83-002, Revision 1, for Virgil C. Summer Nuclear Station. This Thirty Day Report is required by Technical Specification 6.9.1.13.(b) as a result of entry into Action Statement (b) of Technical Specification 3.3.3.9, " Radioactive Gaseous Effluent Monitoring Instrumentation," on January 9, 1983.

Revision 1 to this LER corrects an administrative error discovered by the Licensee. Should there be any questions, please call us at your convenience.

Very truly yours, sg$

O. W. Di on, Jr.

CJM:OWD:dwf/fjc Attachment cc: V. C. Summer A. R. Koon T. C. Nichols, Jr. G. D. Moffatt E. C. Roberts Site QA O. W. Dixon, Jr. C. L. Ligon (NSRC)

H. N. Cyrus G. J. Braddick H. T. Babb J. L. Skolds D. A. Nauman J. B. Knotts, Jr.

M. B. Whitaker, Jr. B. A. Bursey W. A. Williams, Jr. I&E (Washington)

. O. S. Bradham Document Management Branch R. B. Clary INPO Records Center C. A. Price NPCF File 8303010283 830222 -

PDR ADOCK 05000395 S PDR

  • Ger O, Ia'COEY)^

L Mjpg

._. e Mr. James P. O'Reilly LER No.83-002, Revision 1 Page Two February 22, 1983 DETAILED DESCRIPTION OF EVENT On January 9, 1983, at 0010 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> with the Plant in Mode 1, the Main Plant Vent Exhaust System flow rate indication failed low. The flow rate channel is required to be operable at all times per Technical Specification 3.3.3.9, Table 3.3-13, Item 3d. The Plant was prepared to estimate the flow rate on a

--four (4) hour basis in compliance with Action Statement 39 if the channel remained inoperable.

PROBABLE CONSEQUENCES There were no adverse consequences in regards to this event.

The flow rate indication was returned to operable status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 20 minutes of the event occurrence. The Plant was prepared to monitor the flow rate on a four (4) hour basis in compliance with the Technical Specification Action Statement.

CAUSE(S) OF THE OCCURRENCE-The cause of this occurrence is attributed to corrosion on either the card edge connector or the fuse block of the Mixing Amplifier Circuit Board FY-9697.

IMMEDIATE CORRECTIVE ACTIONS TAKEN Maintenance personnel cleaned the card edge connector and the fuse block of Mixing Amplifier Circuit Board FY-9697. The channel was returned to service at 0230 hours0.00266 days <br />0.0639 hours <br />3.80291e-4 weeks <br />8.7515e-5 months <br /> on January 9, 1983, when flow rate indication returned to normal.

ACTION TAKEN TO PREVENT RECURRENCE Since this is an isolated incident, the licensee plans no additional action other than the normal surveillance testing.

-