#REDIRECT [[IR 05000523/2006005]]
{{Adams
| number = ML20137A493
| issue date = 08/06/1985
| title = Forwards Enhanced Team Operational Insp Rept 50-528/85-12 on 850523-0605 & 0716.No Violations Noted
| author name = Kirsch D
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| addressee name = Van Brunt E
| addressee affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| docket = 05000528
| license number =
| contact person =
| document report number = NUDOCS 8508210414
| package number = ML20137A500
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 1
}}
See also: [[see also::IR 05000528/1985012]]
 
=Text=
{{#Wiki_filter:C
  <
    ,s'
                                                                            /
                                          AUG 001985
        Docket No. 50-528
        Arizona Nuclear Power Project
        P. O. Box 52034
        Phoenix, Arizona 85072-2034
        Attention:    Mr. E. E. Van Brunt, Jr.
                      Executive Vice President
        Gentlemen:
        Subj ect: NRC Enh.anced Team Inspection of Palo Verde Unit 1
        This refers to the enhanced operational inspectica conducted by J. L. Crews,
        others of this office and our consultants on May 23 - June 5 and July 16,
        1985, of activities authorized by NRC Operating License No. NPF-34, and to the
        discussion of our findings held with members of your staff at the conclusion
        of the inspection and on July 16, 1985.
        Areas examined during this inspection are described in the enclosed inspection
        report. Within these areas, the inspection consisted of selective
        examinations of procedures and representative records, interviews with
        personnel, and observations by the inspection team.
        No violations of NRC requirements were identified within the scope of this
        inspection.
        In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
        will be placed in the NRC Public Document Room.
        Should you have any questions concerning this inspection, we will be glad to    ,
        discuss them with you.
                                                    Sincerely,
                                                                C.im mt r;ned Gy
                                                                  D. F. !;n nh'
                                                    D. F. Kirsch, Acting Director
                                                    Division of Reactor Safety & Projects
        Enclosure:
        Inspection Report No. 50-528/85-12
        cc w/ enclosure:
        J. Bynum, ANPP
        S. R. Frost, ANPP
        T. D. Shriver, ANPP
        W. E. Ide, ANPP                    B508210414 850806
                                            PDR  ADOCK 05000528
        C. N. Russo, ANPP                  G                PDR
        Ms. Jill Morrison, PVIF
        Lynne Bernabei, GAP
        Duke Railsback, ACC
        Arthur C. Gehr, Esq., Snell & Wilmer
        bec: / SB/ Document Control Desk (RIDS); Mr. Martin; R.I., LFMB; Greg Cook
        CR    / ot      Cl TEE          KI    H
        8/g,/85          8/ ,/85        8    /85
                                                                                    i  L
                                                                                      l
                                                                                /SO
_.
}}

Revision as of 03:31, 4 September 2020

Forwards Enhanced Team Operational Insp Rept 50-528/85-12 on 850523-0605 & 0716.No Violations Noted
ML20137A493
Person / Time
Site: Palo Verde, Skagit Arizona Public Service icon.png
Issue date: 08/06/1985
From: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20137A500 List:
References
NUDOCS 8508210414
Download: ML20137A493 (1)


See also: IR 05000528/1985012

Text

C

<

,s'

/

AUG 001985

Docket No. 50-528

Arizona Nuclear Power Project

P. O. Box 52034

Phoenix, Arizona 85072-2034

Attention: Mr. E. E. Van Brunt, Jr.

Executive Vice President

Gentlemen:

Subj ect: NRC Enh.anced Team Inspection of Palo Verde Unit 1

This refers to the enhanced operational inspectica conducted by J. L. Crews,

others of this office and our consultants on May 23 - June 5 and July 16,

1985, of activities authorized by NRC Operating License No. NPF-34, and to the

discussion of our findings held with members of your staff at the conclusion

of the inspection and on July 16, 1985.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspection team.

No violations of NRC requirements were identified within the scope of this

inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be glad to ,

discuss them with you.

Sincerely,

C.im mt r;ned Gy

D. F. !;n nh'

D. F. Kirsch, Acting Director

Division of Reactor Safety & Projects

Enclosure:

Inspection Report No. 50-528/85-12

cc w/ enclosure:

J. Bynum, ANPP

S. R. Frost, ANPP

T. D. Shriver, ANPP

W. E. Ide, ANPP B508210414 850806

PDR ADOCK 05000528

C. N. Russo, ANPP G PDR

Ms. Jill Morrison, PVIF

Lynne Bernabei, GAP

Duke Railsback, ACC

Arthur C. Gehr, Esq., Snell & Wilmer

bec: / SB/ Document Control Desk (RIDS); Mr. Martin; R.I., LFMB; Greg Cook

CR / ot Cl TEE KI H

8/g,/85 8/ ,/85 8 /85

i L

l

/SO

_.