Forwards Insp Repts 50-528/93-43,50-529/93-43 & 50-530/93-43 on 930921-1101.No Violations Noted
ML20058H375
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/23/1993
From: Vandenburgh C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20058H379 List:
References
NUDOCS 9312130058
Download: ML20058H375 (4)


See also: IR 05000528/1993043

Text

-

-

-

f( 't

UNITED STATES

NUCLEAR REGULATORY COMMISSION

- . 5n 4@

-  ;

$

,

REGION V

~

S / 1450 MARIA LANE

.

,9 WALNUT CREEK, CAUFORNIA 94596-5368

%

,

NOV 2 31993

Docket Nos. 50-528, 50-529, and 50-530

License Nos. NPF-41, NPF-51, and NPF-74

Arizona Public Service Company

P.O. Box 53999, Station 9082

Phoenix, Arizona 85072-3999

Attention: Mr. W. F. Conway

Executive Vice President, Nuclear

SUBJECT: NRC INSPECTION REPORT NOS. 50-528,529,530/93-43

This re'ers

f to the inspection conducted by J. Sloan, H. Freeman, and

A. MacDougall of this office, and T. Alley, of the Department of Energy, on

September 21 through November 1, 1993. The inspection included a review of

activities authorized for your Palo Verde facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The inspection identified two violations of NRC requirements, both involving

the failure to follow procedures. You are commended for identifying and

correcting the first violation, which involved performing a surveillance test

using an outdated revision. The second violation involved a maintenance

technician who inappropriately signed for a review that was required to be

signed by the ASME Section XI pump and valve engineer. These violations were

not cited because the enforcement discretion criteria in the Enforcement

Policy were satisfied.

The inspection also noted several instances in which licensee personnel took

appropriate actions in response to deficient conditions and followed plant

procedures. These included: performing a thorough follow-up to a loose jam

nut on an auxiliary feedwater pump; mounting a . camera in the refueling canal

to identify foreign objects; implementing appropriate corrective actions when

an out-of-date procedure revision was identified; removal and inspection of a

diesel generator bearing; and identification of error made during

reconstitution of a fuel assembly.

Additionally, one violation is referenced in this inspection report regarding

deficiencies you identified involving the performance of auxiliary operators.

A Notice of Violation was separately issued on October 15, 1993, and no

respcnse was requested. The violation is listed in this report for

administrative purposes only.

9312130058 931123

PDR ADOCK 05000528-

O PDR

_ _ _

.

-

. l

-

-

2 h0V 2 31993

- In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room. I

i

Should you have any questions concerning this inspection, we will be glad to  :

discuss them with you.

Sincer ,

C. A. VanDenburg , Chief l

Reactor Projects ranch  ;

Enclosures:

Inspection Report Numbers 50-528,529,530/93-43

cc w/ enclosures:

Mr. Steve Olea, Arizona Corporation Commission

Mr. James A. Beoletto, Esq., Southern California Edison Company

Mr. Charles B. Brinkman, Manager, Washington Nuclear Operations

Mr. Aubrey Godwin~, Director, Arizona Radiation Regulatory Agency (ARRA) 1

Chairman, Maricopa County Board of Supervisors

Mr. Jack R. Newman, Esq., Newman & Holtzinger P. C.

Mr. Curtis L. Hoskins, Executive Vice President and Chief Operating Officer,

Palo Verde Services

Mr. Roy P. Lessey, Jr., Esq., Akin, Gump, Strauss, Hauer and Feld

Mr. Bradley W. Jones, Esq., Akin, Gump, Strauss, Hauer and Feld

Mr. Ronald J. Stevens, Director, Nuclear Regulatory and Industry Affairs,

Arizona Public Service Company

-

1

b

t I

r

1

i

o  !

.

.

3

bec w/ enclosures: bec w/o enclosures:

Docket file LFMB

G. Cook M. Smith

B. Faulkenberry

S. Richards

Resident Inspector (5)

Project Inspector

K. Johnston

4W+r rVHpr & &r # M .e

JSloan HFreeman AMacDougall TAlley >

/1/d/93 /// M/93 " /'7/93 '//17/93

'

REQUEST GDP( REQUEST C Y ] REQUEST C Y ] REQUEST COPY ]

YES / /NO ) YES / 1 YES / 40 1 YES / N0 1

& (JMArme) fhhe'1

HWong CVan er rgh RHuey RPate (Para. B)

f//d/93 \ \[L 93 / /93 // /22/93

RE .51 COPY ~

REQUE@T COPY REQUEST COPY  ; REQUEST COPY;

-s / NO YES // NO YES / NO ~Y ES / d Of '

V v -

B01 son W

" / m/93

REQUEST COPY;

'

REQUEST Y REQUEST COPY I REQUEST COPY ]

YES / NO l YES / N0

'

YES /.: _O N l 'YES / NO

10 PDR S TO DCS

,

/ NO / NO

100053 1

File Location: g:\ps2\pvngs\insprpts\pv93-43. sri

l

i

'\

TC i

.

_ . . _ _

)

'

.

3

bcc w/ enclosures: bec w/o enclosures:

i

Docket file LFMB

G. Cook M. Smith

B. Faulkenberry '

S. Richards

Resident Inspector (5)

Project Inspector '

K. Johnston

!

,

JSloan HFreeman AMacDougall TAlley

/ /93 / /93 / /93 / /93

'

REQUEST COPY REQUEST COPY ! REQUEST COPY REQUEST COPY

YES / NO YES / NO- YES / NO YES / NO

HWong CVanDenburgh RHuej RPate (Para. 18)

"

/ /93 / /93

ll /fr//93 / /93 ,

REQUEST COPY

YES / NO

REQUEST COPY

YES / NO

k

PE B ST COPY

  1. ES// NO

LREQUEST COPY.

'YES / NO

Bolson

/ /93 i

,

'

REQUEST COPY ] REQUEST COPY REQUEST COPY , ~ REQUEST COPY.

.

YES / NO

~

.1 YES / N0 YES / NO 'YES / NO

SEND TO PDR ] SEND TO DCS  :

YES / NO 1 YES / NO

.

>

Y

File Location: g:\ps2\pvngs\insprpts\pv93-43. sri

T

a

.