LER-1998-003, Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing |
| Event date: |
|
|---|
| Report date: |
|
|---|
| 5301998003R01 - NRC Website |
|
text
CATEGGRY REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9904220164 DOC.DATE: 99/04/13 NOTARIZED: NO DOCKET FACIL':STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION OVERBECK,G.R.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP. NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Forwards LER 98-003-0l,per 10CFR50.73.Supplemental rept.
provides evaluation findings from plant out-of-tolerance MSSVs conditions which were discovered during pre-outage testing.
DISTRIBUTION CODE:
IE22T COPIES RECEIVED:LTR i
ENCL l
SIZE: 2 TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
NOTES:Standardized plant.
C A
'Q T
E i
050005300 RECIPIENT ID CODE/NAME DLPM/LPD4-2 INTERNAL: ACRE FIDE CENTE~R>>
R/DIPM/IQMB NRR/DSSA/SPLB RGN4 FILE 01 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME FIELDS,M AEOD/SPD/RRAB NRR/DIPM/IOLB NRR/DRIP/REXB RES/DET/EIB COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 0
EXTERNAL: L ST LOBBY WARD NOAC POORE,W.
NRC PDR 1
1 1
1 1
1 LMITCO MARSHALL NOAC QUEENER,DS NUDOCS FULL TXT 1
1 1
1 1
1 D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEZVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 4ZS-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED:
LTTR 17 ENCL 17
1 Commiimenf. fnnovatiora fnergy.
Palo Verde Nuclear Generating Station Gregg R. Overbeck Vice President Nuclear Production TEL 602/393-5148 FAX 602/3936077 Mail Station 7602 P.O. Box 52034 Phoenix, AZ85072-2034 192-01043-GRO/DGM/RAS April 13, 1999 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 3 Docket No. STN 50-530 License No. NPF-74 Licensee Event Report 98-003-01 Attached please find supplement 1 to Licensee Event Report (LER) 50-530/98-003 which has been prepared and submitted pursuant to 10 CFR 50.73.
This LER supplement provides the evaluation findings from the Unit 3 out-of-tolerance main steam safety valves (MSSVs) conditions which were discovered during pre-outage testing.
Ig The Unit 3 MSSV as-found liftpressures were in some cases greater than the tolerance allowed
/
by Technical Specification Limiting Condition for Operation 3.7.1.
During the evaluation of the Unit 3 MSSV testing results, APS determined that a potentially transportable condition existed and as a result, tested sele'cted Unit 1 and Unit 2 MSSVs.
Of the MSSVs tested as part,of the transportability review, one Unit 1 and one Unit 2 MSSV were also found to have as-found lift ~
settings outside TS limits.
APS engineering has implemented an'augmented testing program to gather additional data on MSSV performance and this LER supplement contains the results from the augmented testing that has been completed through February 25, 1999.
Concurrently, APS is evaluating industry operating experience for plausible actions that may assist us in improving MSSV performance and we may implement additional actions ifthey can be demonstrated to be effective.
8
U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Licensee Event Report 50-530/98-003-01 Page 2 4
The replacement of out-of-tolerance MSSVs and the augmented testing plan described in this LER supplement are being controlled in accordance with the PVNGS corrective action program.
As such, APS may modify these corrective actions as necessary to improve MSSV reliability and performance.
The corrective actions described in this LER supplement are not necessary to maintain compliance with regulations and therefore should not be considered regulatory
commitments
In accordance with 10CFR50.73(d),
a copy of this LER is being forwarded to the Regional Administrator, NRC Region IV.
If you have questions regarding this submittal, please contact Daniel G. Marks, Section Leader, Regulatory Affairs, at (602) 393-6492.
Sincerely, GRO/DGM/RAS/rlh Attachment cc:
E. W. Merschoff J. H. Moorman M. B. Fields INPO Records Center (all with attachment)
|
|---|
|
|
| | | Reporting criterion |
|---|
| 05000528/LER-1998-001, :on 980130,reactor Protection & ESFAS Instrumentation Not Bypassed within one-hour Allowed by TS Occurred.Caused by Inadequate Procedures.Expectation to Detect Alarm Conditions Was Emphasized to CR Personnel |
- on 980130,reactor Protection & ESFAS Instrumentation Not Bypassed within one-hour Allowed by TS Occurred.Caused by Inadequate Procedures.Expectation to Detect Alarm Conditions Was Emphasized to CR Personnel
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) | | 05000530/LER-1998-001-02, :on 980730,entered TS 3.0.3 Due to Safety Injection Flow Instruments Being Removed from Svc.Caused by Personnel Error.Transmitters Were Unisolated & Returned to Svc |
- on 980730,entered TS 3.0.3 Due to Safety Injection Flow Instruments Being Removed from Svc.Caused by Personnel Error.Transmitters Were Unisolated & Returned to Svc
| 10 CFR 50.73(a)(2)(i) | | 05000529/LER-1998-001-01, :on 980301,surveillance Test Deficiency Found During Qaa Leads to TS 3.0.3/4.0.3 Entry.Caused by Personnel Error.Personnel Responsible for Inadequately Performed SR Were Coached |
- on 980301,surveillance Test Deficiency Found During Qaa Leads to TS 3.0.3/4.0.3 Entry.Caused by Personnel Error.Personnel Responsible for Inadequately Performed SR Were Coached
| 10 CFR 50.73(s)(2)(v) 10 CFR 50.73(s)(2) | | 05000529/LER-1998-001, Forwards LER 98-001-00,which Describes TS Violation Due to Exceeding Specified Surveillance Interval Including Maximum Allowable Extension of 25% as Specified in TS SR 4.0.2 for TS SR 4.5.2.d.3 (Trisodium Phosphate) | Forwards LER 98-001-00,which Describes TS Violation Due to Exceeding Specified Surveillance Interval Including Maximum Allowable Extension of 25% as Specified in TS SR 4.0.2 for TS SR 4.5.2.d.3 (Trisodium Phosphate) | | | 05000530/LER-1998-002, Forwards LER 98-002-00,re Discovery & Correction of cross- Wired Power Supply Receptacle for B Train H Recombiner. No New Commitments Made by Util | Forwards LER 98-002-00,re Discovery & Correction of cross- Wired Power Supply Receptacle for B Train H Recombiner. No New Commitments Made by Util | | | 05000530/LER-1998-002-02, :on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired |
- on 980814,B Train H Recombiner Was Noted Inoperable Due to cross-wired Power Receptacle.Cause of Event Is Under investigation.Cross-wired Power Supply Receptacle for B Train H Recombiner Was re-wired
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(B) | | 05000529/LER-1998-002, Forwards LER 98-002-00 Prepared & Submitted,Per 10CFR50.73. LER Repts TS Violation Due to Improperly Performed Shiftly Channel Checked for Core Protection Calculators Following CPC Data Link Failure | Forwards LER 98-002-00 Prepared & Submitted,Per 10CFR50.73. LER Repts TS Violation Due to Improperly Performed Shiftly Channel Checked for Core Protection Calculators Following CPC Data Link Failure | | | 05000528/LER-1998-002, Forwards LER 98-002-00,which Repts Automatic Reactor Trip on Low SG Level Due to Insufficient Main Feedwater Flow.Ler Does Not Contain Commitments | Forwards LER 98-002-00,which Repts Automatic Reactor Trip on Low SG Level Due to Insufficient Main Feedwater Flow.Ler Does Not Contain Commitments | | | 05000530/LER-1998-002-01, Forwards LER 98-002-01,re Discovery & Correction of cross- Wired Power Supply Receptacle for B Train H Recombiner,Per 10CFR50.73 | Forwards LER 98-002-01,re Discovery & Correction of cross- Wired Power Supply Receptacle for B Train H Recombiner,Per 10CFR50.73 | | | 05000529/LER-1998-003-01, Forwards LER 98-003-01,per 10CFR50.73.Revised LER Provides Cause & Corrective Action for Delay in Bypassing Failed Instrument Used in PPS | Forwards LER 98-003-01,per 10CFR50.73.Revised LER Provides Cause & Corrective Action for Delay in Bypassing Failed Instrument Used in PPS | | | 05000529/LER-1998-003, :on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters |
- on 980113,discovered That One Channel of RWT Level Sys Had Failed High.Caused by Water Intrusion Into Electrical Termination Pull Box.Weep Holes Were Drilled Into Bottoms of Pull Boxes Nearest Level Transmitters
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2) 10 CFR 50.73(s)(2)(ii) | | 05000530/LER-1998-003-02, :on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc |
- on 980902,discovered That MSSV as-found Lift Pressures Were Outside TS Limits.Caused by Bonding of Valve Disc to Nozzle Seat.Affected Valves Were Adjusted,Retested & Returned to Svc
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000530/LER-1998-003, Forwards LER 98-003-00 Prepared & Submitted Per 10CFR50.73.LER Repts out-of-tolerance Condition of Several MSSV Which Were Discovered During pre-outage Testing | Forwards LER 98-003-00 Prepared & Submitted Per 10CFR50.73.LER Repts out-of-tolerance Condition of Several MSSV Which Were Discovered During pre-outage Testing | | | 05000530/LER-1998-003-01, Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing | Forwards LER 98-003-01 Re MSSV as-found Lift Pressures out- Side of TS Limits.Ler Suppl Provides Evaluation Findings from Unit 3 out-of-tolerance MSSVs Conditions Which Were Discovered During pre-outage Testing | | | 05000528/LER-1998-003, Forwards LER 98-003-00 Reporting Unanalyzed Condition Which Exists When Automatic Fast Bus Transfer Capability Is Blocked to Prevent Transfer of non-class Plant Equipment from Unit Auxiliary to Startup Transformer | Forwards LER 98-003-00 Reporting Unanalyzed Condition Which Exists When Automatic Fast Bus Transfer Capability Is Blocked to Prevent Transfer of non-class Plant Equipment from Unit Auxiliary to Startup Transformer | | | 05000528/LER-1998-003-01, Forwards LER 98-003-01,IAW 10CFR50.73.Interim Corrective Actions Which Were Implemented to Control Fbt Blocking, Have Subsquently Been Discontinued Based Upon More Recent Analysis | Forwards LER 98-003-01,IAW 10CFR50.73.Interim Corrective Actions Which Were Implemented to Control Fbt Blocking, Have Subsquently Been Discontinued Based Upon More Recent Analysis | | | 05000529/LER-1998-004-01, :on 980630,personnel Discovered That Pressure Safety Valve Had Not Received Periodic Set Pressure Test for ASME Class 1 Pressure Safety Valve.Caused by Personnel Error.Pressure Safety Valve Reviewed |
- on 980630,personnel Discovered That Pressure Safety Valve Had Not Received Periodic Set Pressure Test for ASME Class 1 Pressure Safety Valve.Caused by Personnel Error.Pressure Safety Valve Reviewed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2) 10 CFR 50.73(s)(2) 10 CFR 50.73(s)(2)(6) | | 05000530/LER-1998-004, Forwards LER 98-004-00 Prepared & Submitted Pursuant to 10CFR50.73.LER Reports TS Violation Due to non-compliance with TS 3.9.3 for Not Establishing Containment Penetration Isolation During Core Alterations | Forwards LER 98-004-00 Prepared & Submitted Pursuant to 10CFR50.73.LER Reports TS Violation Due to non-compliance with TS 3.9.3 for Not Establishing Containment Penetration Isolation During Core Alterations | | | 05000528/LER-1998-004, :on 980304,safety Valves as-found Pressures Out of Tolerance.Cause of Event Is Under Investigation.Three MSSVs & Psv Will Be Replaced W/Refurbished & Recertified Valves During Refueling Outage U1R7 |
- on 980304,safety Valves as-found Pressures Out of Tolerance.Cause of Event Is Under Investigation.Three MSSVs & Psv Will Be Replaced W/Refurbished & Recertified Valves During Refueling Outage U1R7
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000528/LER-1998-005, :on 980428,noted That Required Response Time Testing Had Not Been Performed.Caused by Personnel Error. Coached I&C Personnel Responsible for Reviewing Work Authorization Documentation |
- on 980428,noted That Required Response Time Testing Had Not Been Performed.Caused by Personnel Error. Coached I&C Personnel Responsible for Reviewing Work Authorization Documentation
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000528/LER-1998-006, :on 980507,determined That Plant Was Outside Design Basis Due to SI Discharge Check Valve Reverse Flow. Check Valve Was Disassembled,Examined & Reassembled, Whereupon Valve Met Acceptance Criteria |
- on 980507,determined That Plant Was Outside Design Basis Due to SI Discharge Check Valve Reverse Flow. Check Valve Was Disassembled,Examined & Reassembled, Whereupon Valve Met Acceptance Criteria
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000528/LER-1998-006-01, Forwards LER 98-006-01 Re Hpsip Discharge Check Valves Being Misaligned.Ler Contains Commitments for Correcting Condition | Forwards LER 98-006-01 Re Hpsip Discharge Check Valves Being Misaligned.Ler Contains Commitments for Correcting Condition | | | 05000528/LER-1998-007, :on 980520,CR Personnel Observed Flow & Pressure Perturbations on Chemical & Vol Control Sys Letdown Sys.Caused by Cyclic Fatigue Due to Dynamic Pressure Transients.Unit Letdown Piping Replaced |
- on 980520,CR Personnel Observed Flow & Pressure Perturbations on Chemical & Vol Control Sys Letdown Sys.Caused by Cyclic Fatigue Due to Dynamic Pressure Transients.Unit Letdown Piping Replaced
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications | | 05000528/LER-1998-007-01, Forwards LER 98-007-01 Re Letdown Leak That Required Entry Into TS LCO 3.0.3.LER Contains Specific Commitments for Correcting Condition | Forwards LER 98-007-01 Re Letdown Leak That Required Entry Into TS LCO 3.0.3.LER Contains Specific Commitments for Correcting Condition | | | 05000528/LER-1998-008, :on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements |
- on 980729,EQ of Electrical Connectors Were Not Adequately Demonstrated.Caused Because Test Was Conducted with Only Single Lv Connector & Without Fully Ranged Inputs. Revised EQ Requirements
| |
|