Forwards Insp Repts 50-528/93-46,50-529/93-46 & 50-530/93-46 on 930913-1029.No Violations or Deviations Noted
ML20058H273
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/19/1993
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20058H276 List:
References
NUDOCS 9312130039
Download: ML20058H273 (5)


See also: IR 05000528/1993046

Text

.

.

,

.

/$pQtCt%e

UNITED STATES

F.

;

NUCLEAR REGULATORY COMMISSION

ff @ aE

REGION V

.

'

Y*

1450 MAR!A LANE

'

%

WALNUT CREEK,CAUFORNIA 945W536B

%,,,,,8

NOV 191933

Docket Nos.

50-528, 50-529, and 50-530

License Nos.

NPF-41, NPF-51, and NPF-74

Arizona Public Service Company

P. O. Box 53999, Station 9082

Phoenix, Arizona 85072-3999

.

Attention:

Mr. William F. Conway

Executive Vice President, Nuclear

,

!

Subject: NRC INSPECTION REPORT 50-528/93-46, 50-529/93-46, AND 50-530/93-46

This refers to the routine announced inspections conducted by Mr. M. Royack

and Mr. J. Winton of this office during the period of September 13 through

29, 1993. The inspection covered

October 8, 1993 and October 25 through

At

activities authorized by NRC License Numbers NPF-41, NPF-51, and NPF-74.

the conclusion of the inspections, the inspectors discussed the findings with

,

members of your staff identified in the enclosed report.

Within

Areas examined during this inspection are described in the report.

,

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

,

inspectors.

The scope of this inspection included a review of your Jnanagement support and

oversight of the erosion corrosion, inservice inspection, and steam generator

We found adequate management support and

eddy current inspection programs.

oversight of these programs.

No violations or deviations of HRC requirements were identified.

.

In accordance with 10 CFR 2.790 of the NRC's, " Rules of Practice," a copy of

this letter and enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sin rely,

/

>

L

iller,

r., C e

.

.

Reactor Safety e ch

l

Enclosure:

Inspection Report Nos 50-528/93-46, 50-529/93-46, and 50-530/93-46

\\

1

g2230039931119

'

ADOCK 05000528

O

PDR

i

. _ .

~

_

_

.

.

cc.w/enclosurei

-

-

~

~

Mr. Steve Olea, Arizona Corporation _ Commission

.

"

James A. Beoletto, Esq., Southern California Edison Company

Mr. Charles B. Brinkman, Manager, Washington Nuclear Operations

Mr. Aubrey Godwin, Director, Arizona Radiation Regulatory Agency

Chairman, Maricopa County Board of Supervisors

Jack R. Newman, Esq., Newman & Holtzinger, P.C.

Mr. Curtis Hoskins, Executive Vice President and Chief Operating Officer,

Palo Verde Services

Roy P. Lessey, Jr., Esq., Akin, Gump, Strauss, Hauer and Feld

Bradley W. Jones, Esq., Akin, Gump, Strauss, Hauer and Feld

Mr. Ronald J. Stevens, Director, Nuclear Regulatory Affairs, APS

-

-

,

_

e

m

1

.

I

j

j

b

p

1

i

~_

-

.

,

-

.

.-

-

_

-

.

.

2

,

.

.

' Pesults:

-

1

General Conclusions

Erosion Corrosion and Inservice Inspection Procrans

The inspectors observed that licensee management had continued to

provide adequate funding and oversight of the erosion corrosion and

ISI programs.

The licensee had implemented the erosion corrosion and inservice

inspection (ISI) programs in accordance with NRC requirements and

licensee procedures.

_

,

The licensee had perforined Unit I steam generator eddy current

inspections, data acquisitions, data analysis in accordance with

licensee procedures.

-

Licensee management had provided oversight of the Unit I steam

generator eddy current program implementation.

Sianificant Safety Matters

None.

,

>

Summary of Violation or Deviations

No violations or deviations of NRC requirements were identifted during

_

this inspection.

Open Items Summarv

.

The inspectors closed one licensee event report (50-528/529/530/89-012-

L2),

i

l

- . - - -

- -

-

-

-

-

c;

.

.

l

.

.

bec w/ enclosure:

Project Inspector

Resident Inspector

G. Cook

B. Faulkenberry

S. Richards

Docket File

bec w/o enclosure:

'

M. Smith

J. Bianchi

E. Makovsky

Region V

t'

.

,

f

MRoyack

JWinton

Ang

LMiller

%d3

P/r/O

I//@lO

$/9

5

IREQUE4T COPY 1 IREDUESLCOPY1 IRE 00EST COPY 1 IRE 0 VEST 00PY1

I /YES/ NO 1 I(YES

.N0 1I #ES) N0 1I

YES (N0f 1

V

V

V

v

H. Wong Q , %

uln/q3

e x -v

IREOUEST COPY 1

IMEST N0 1

,

V

,

,

ISEND TO PDR1

ISEJiu'to DCSl

-

If YaS N0 1

I / YES' N0 1

s../

'

File G:NRSB\\ ENGRN PV9346MR.R1

100035

.

.

t

1

' 1

T$ol

.

498 0204

P.02

.

'

bec w/enelosure

-

,

,

Project Inspector

Resident Inspector

8. Cook

3, Paulkenberry

S. Richards

Docket File

bec w/o enclosure:

M. saith

J. Blanchi

E. R6kevsky

Region V

MRoyack

JWinton

s

Wang

LM111er

okk?

9l8$h

' REMET / COPY'

'ar M T COPY 1 FREQUEST 00PT

' REQUEST

l0PY' i

(U4TE1/ NO

' /Yts i ho i

  • YES

NO

YES

do '

'

'

'

V

t.

ong

.

.

,

.

,

e

i

I

,

.

__.-.__--.---_.-- -_---_-,-- ---._______ _ - ---- - - - - - -