ML20137A641
Jump to navigation
Jump to search
| ML20137A641 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 06/28/1985 |
| From: | Peterson L LAWRENCE LIVERMORE NATIONAL LABORATORY |
| To: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| Shared Package | |
| ML20137A500 | List: |
| References | |
| 85-06-50, 85-6-50, NUDOCS 8508210449 | |
| Download: ML20137A641 (1) | |
Text
Lawrenca Livermglgtional Laboratory A
HEC ATTACff4ENT 4 IS85 Ji -2 lill: Is NUCLEAR SYSTEMS SAFETY 85-06-50 PEGON V BE June 28,1985 Jesse Crews, Senior Reactor Engineer U.S. Nuclear Regulatory Commission, Region V 1450 Maria Lane Suite 202, Walnut Creek, California 94596 Dear Mr. Crews-Enclosed is a statement of my observations, findings, and comments as a member of the NRC Region V Enhanced Inspection Team during the initial reactor startup and low power physics tests at the Palo Verde Nuclear Generating Station, Unit 1.
Please contact me at (415) 423-0952 or FTS 8-543-0952 if further informatio!.
is needed.
Sincerely, Y
& ;l -
A L. Rolf Peterson Nuclear Systems Safety Program l
An Enal QportintyEtrplayer
- Telephone (415)422-1100
- Twx 910-386-8339 UCLLL LVMR
)