ML17313A908

From kanterella
Jump to navigation Jump to search
Documents 990421 Telcon with E Emeigh,Which Requested Extension for Submitting Next Matl Balance Rept for Pvngs,As Required by 10CFR70.53 & 74.13.Required Info Will Be Submitted by 990531
ML17313A908
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/23/1999
From: Krainik A
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-04277-AKK-R, 102-4277-AKK-R, NUDOCS 9905050048
Download: ML17313A908 (4)


Text

CATEGORY j.

REGULA'J'Y INFORMATION DISTRIBUTIO SYSTEM (RIDS)

ACCESSION NBR:990 FACIL:STN-50-528

~. "8Tkl-50-529 STN-50-530 AUTH.NAME KRAINIK,A.K.

RECIP;NAME 5050048 DOC.DATE: 99/04/23 NOTARIZED: NO DOCKET I Palo Verde Nuclear Station, Unit,1, Arizona Publi 05000528 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTHOR AFFILIATION Arizona Public Service Co.

(formerly Arizona Nuclear Power RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

C UN

SUBJECT:

Documents 990421 telcon with' Emeigh,which requested extension for submitting next matl balance rept for PVNGS,as required by 10CFR70.53 8 74.13.Required info will be submitted by 990531.

DISTRIBUTION CODE:

AOOID COPIES RECEIVED:LTR I

ENCL O'IZE:

TITLE: OR Submittal: General Distribution NOTES:STANDARDIZED PLANT Standardized plant.

Standardized plant.

E G

05000528 0500052cP 0500053$

RECIPIENT ID CODE/NAME DLPM/LPD4-2 FIELDS,M COPIES LTTR ENCL 1

RECIPIENT ID CODE/NAME DLPM/LPD4-2 COPIES LTTR ENCL INTERNAL: ACRS NRR/DE/EMCB NRR/DSSA/SPLB NRR/SPSB JUNG,I OGC/HDS2 LE CENTER 01 1

NRR/DE/EMEB 1

NRR/DSSA/SRXB 1

NUDOCS -ABSTRACT 1

D EXTERNAL: NOAC NRC PDR I~VZQilI.II N

NOTE TO ALL "RIDS" RECZPZENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:

LTTR 14 ENCL 39

0 II

~4 P

~

~

Angela K. Krainik Department Leader Regulatory Affairs Palo Verde Nuotear Generating Station ',.'el:

602/393-5421 Fax: 602/393-5442 Mail Station 7636 P.O. Box 52034 Phoenix, AZ 65072-2034 t

102-'04277'-AKK/RJH April23, 1999 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Dear Sirs,

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2 and 3 Docket Nos. STN 50-528/529/530 Extension of Material Balance Report Submittal Date This letter documents a telephone conversation between Glenn Michael, Senior Licensing

Engineer, Arizona Public Service (APS), and Mr. Chuck
Emeigh, Section Chief, Licensing and Safeguards Branch, NRC, on April 21, 1999.

APS initiated the phone call to request an extension for submitting the next material balance report for PVNGS required by 10 CFR 70.53 and 74.13.

The next required material balance report submittal is due by April 30, 1999, but 10 CFR 74.13(a)(1) contains the provision that the Commission may permit a licensee to submit the reports at other times when good cause is shown.

Mr. Emeigh agreed that APS may delay submittal of the next material balance report until May 31, 1999.

APS commits to submit the next material balance report required by 10 CFR 70.53 and 74.13 by May 31, 1999.

Should you have any questions, please contact Scott A. Bauer, APS, at (602) 393-5978.

Sincerely, 9905050048 990423

..I1 PDR ADQCK 05000528-'i P

PDR Q AKK/SAB/GAM/rlh cc:

E. W. Merschoff M. B. Fields 8

J. H. Moorman NAC International, NMMSS Program

~go]

1I I,

,1 P

~~ 4

~ 's 4i igi.