Forwards Mgt Meeting Repts 50-528/87-08,50-529/87-09 & 50-530/87-09 on 870204.Major Areas Discussed:Util Evaluation of Causes & Implementation of Corrective Actions Re Recent Operational Events
ML20212N115
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/27/1987
From: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
Shared Package
ML20212N117 List:
References
NUDOCS 8703120364
Download: ML20212N115 (3)


See also: IR 05000528/1987008

Text

r. '

r .$ tN UNITED STATES

\ NUCLEAR REGULATORY COMMISSION

[

g aj REGION V

1450 MARIA LANE.SulTE 210

Q

g * . . * * ,o'g

.

WALNUT CREEK, CALIFORNIA 94596

FEB 271987

Docket Nos. 50-528, 50-529 and 50-530

Arizona Nuclear Power Project

P. O. Box 52034

Phoenix, Arizona 85072-2034

Attention: Mr. E. E. Van Brunt Jr.,

Executive Vice President

Gentlemen:

Subject: Report of Meeting with ANPP Management

This refers to a meeting held with you, Mr. J. G. Haynes, and other

members of your staff at the ANPP Corporate Engineering Office in

Phoenix, Arizona, on February 4, 1987. The subjects discussed are

summarized in Meeting Report Nos. 50-528/87-08, 50-529/87-09, and

50-530/87-09, enclosed herewith for your information.

The discussion primarily centered on your evaluation of the causes, and

implementation of corrective actions associated with recent operational

events. Aspects of previous issues discussed at our December 17, 1986,

meeting at the NRC Region V Office were also discussed and updated.

The following points were discussed and agreements reached.

Unit 3 Diesel Generator Failure

The NRC recommended that ANPP contact additional diesel experts to

ensure that repair techniques utilized were considered sound

practice. Mr. Van Brunt, Jr. agreed to speak with other diesel

manufacturers.

'

Improper Documentation of Surveillances

The NRC expressed concern over instances in which plant personnel

improperly documented performance of tasks which were not actually

completed, and noted the seriousness of such problems. It was

agreed by ANPP that this subject would be discussed further, in a

future meeting, when a course of action concerning these problems

had been arrived at.

  • Letdown Heat Exchanger Nozzle Failure

t

The NRC would like to review the fatigue analysis concerning the ' es s

[

crack in the letdown heat exchanger nozzle in Unit 3, whensit's,

'" /

.

'

9[

completed. ANPP agreed to provide this. g ,

3

.:a

"+ . , ; :, #

G703120364 870227

PDR

G

ADOCK 05000528

PDR

.-

.f

lf

__ _ __.____ _ _ . _ - - - ~ _ .__ .- _ _ _ _ _ _ _ _ _ _ _

-

.

. .

.

-2-

FEB 271987

Power Supply Malfunction in PPS Caused Reactor Trip

A reactor trip which resulted, in part, from a malfunctioning power

supply in the PPS was discussed. ANPP was informed that the

responsibility for understanding complex system and component design

in detail rested with them. An effective technology transfer

program between AN.a? and their vendors was needed to ensure this

high level of understanding. ANPP concurred, stating that such a

technology transfer program was being developed.

We found our meeting to be beneficial; good communication between ANPP

and the NRC is fundamental to our understanding of how you approach and

resolve plant problems. We look forward to discussing the effectiveness

of your corrective actions during a future meeting.

'

No response to this letter is required. Should you have any questions

concerning this inspection, we will be pleased to discuss them with you.

Sincere y,

j

B. Martin

Regional Administrator

< Enclosures:

l 1. Report Nos. 50-528/87-08, 50-529/87-09, 50-530/87-09

2. Meeting Agenda

i cc w/ enclosures:

l J. G. Haynes, Vice President, Nuclear Production

J. R. Bynum, PVNGS Plant Manager

W. F. Quinn, Manager, Licensing

l T. D. Shriver, Manager, Compliance

W. E. Ide, Manager, Corporate QA/QC

C. N. Russo, Manager, QA Audits / Monitoring

Arthur C. Gehr, Esq.

Ms. J. Morrison

Ms. L. Bernabei, GAP

D. Railsback, Arizona Corporation Commission ,

1

1

!

l

I

.

,

' :

7., '

'  :,. .

f b < t

. . .

.

.; . , .

..

,

i 1

pr - 4' ;FEB 271987

'

'

'E),

'

1

.

'

-

. bec w/enclosdres: * ' I1 .

'

RSB/ Document Control' Desk 1 (RIDS) -

. Project Inspector *

s

' '

. Resident Inspector  %- -

R. Huey, SONGS': ,

G. Cook

B. ' Faul kenberry -

'

J. Martin

docket file

~

bcc.w/o enclosures':

~M. Smith

LFM8

sn S ds RPa DKi h JMa in'

2/A7/87' 2/17/87 2/ /87' 2/pf/87 2/jf/87.