IR 05000530/1987036
| ML20149N088 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 02/12/1988 |
| From: | Pate R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| Shared Package | |
| ML17303A776 | List: |
| References | |
| TAC-67076, NUDOCS 8803010176 | |
| Download: ML20149N088 (2) | |
Text
-
a a :2
,
,
,
"
"
'
,
,
,
.
,
a
.
.
FEB.10988
-
,
[4, Docket No.'50-530
>
Arizona. Nuclear Power Project P. O. Box 52034. 85072-2034 Phoenix.. Arizona-
'
'
Attention: -Mr. E. E.. Van Brunt, Jr.
Executive Vice President-Gentlemen:
~ SUBJECT: 'NRC ENHANCED OPERATIONAL INSPECTION OF-PALO VERDE UNIT 3-This refers to the enhanced operational inspection conducted by-Mr. S. A. Richards, others of this office, and our consultants, on December 10-18, lf87, of activities authorized by NRC License No. NPF 74'
and to the discussion of our findings b-
. tith you and members of your staff
,
at the conclusion of the inspection.
Areas examined during.this inspection are described in the enclosed inspcction report. Within these areas, tne inspection consisted of selected examinations of procedures and representative records, interviews with personnel, and observations by.th.e inspector.
No violations or. deviations of NRC requirements were identified within the scope of this inspection.
The primary focus of the inspection was to' assess the performance of your staff dLring the conduct of Power Ascension Testing at Unit 3.
We found the conduct of operations at Unit 3 to be acceptable. Our inspection did identify several deficiencies which indicate weaknesses in your conduct of technical
. work. We direct your attention to paragraph 5 of the enclosed report.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will-be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be glad to discuss them with you.
Sincerely, h
Robert J. Pate, Chief Reactor Safety Branch 8803010176 800212
)i PDR ADOCK 05000530
\\
G PDR b_
_ _ _ _
- - - -
pc g ;.,
-
-
-- --
'
"'
'
g,._.'.
,
,
-
,
-
..
l~9 1l
,
,
,
FEB:1'2 1988
_
,
' 2-
'
-
.
e I
Should you,havs:any questions concerning.this inspection, we will bs glad to
. discuss them with you.
a h
Sincerely, s
,_
,
.
-
- -
Robe J.;Pate, ief Reactor Safety. Branch
_
.
Enclosure:
~-Inspection Report No. 50-530/87-36 L
.'cc w/ enclosure:
J. G. Haynes -ANPP 0..J.'Zeringue, ANPP W.' F. Quinn, ANPP T. ~ D. Shriver, ANPP L. Papworth -Director, Quality Assurance
.
Ms. J. Norrison, PVIF L. Bernabei, GAP
.
T. Hogan, AC A.' C. ' Gehr, :.sq.', Snell & Wilmer
,
bec w/ enclosure:
.
,
'
_RSB/ Document Control Desk'(RIDS).(IE01)
'
,-
'D. Persinko, NRR Project Inspector Resident Inspector G. Cook B. - Faulkenberry
.
J. Martin
..'.
'
(-
L. Phillips, NRR/SRXB l --
M. Davis, NRR/PD5 l
0. Coe', RV Docket File
'
l-
!
bec w/o enclosure:
!
LFM8 l-
-M. Smith
!
L
. Region V/jk
- ..
EST COPY,
8EQtGS! COPY J l
. YES. /,NO MES / NO
'
./YES)TOPOR
, 3fffD, v
,
/ NO SRic ards E
' 2/ p//88 2Fz.188