ML20136D926: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:;c,  '[I1:
                                                                            .
                                      NOV 141985
: Docket No.  50-423
i
  Northeast Nuclear Energy Company
  ATTN: Mr. J. F. Opeka
          Senior Vice President - Nuclear
          Engineering and Operations Group
  P. O. Box 270
  Hartford, Connecticut 06101
  Gentlemen:
  Subject:  EXAMINATION REPORT NO. 50-423/85-44(0L)
  This transmits the Examination Report of Operator Licensing Examinations
i conducted by USNRC Region I at the Millstone 3 Facility the weeks of
  September 2, 1985, and September 9, 1985.
  No reply to this letter is required.    Your cooperation in this matter is
  appreciated.                                                                      ,}
                                            Sincerely,
                                        kihinal sicned sy,
                                            Edward C. Wenzinger, Chief
                                            Projects Branch No. 3
                                            Division of Reactor Projects
  Enclosure:
  Examination Report No. 50-423/85-44(0L) w/ Attachments 1, 2, 3
                        h!k kDO
                        o
                                              f
                            0FFICIAL RECORD COPY        OL ER MILL 85-44 - 0001.0.0
                                                        11/12/85 IE 4/lL g
 
    Northeast Nuclear Energy Co.              2
    cc w/ enclosure and Attachments 1, 2, 3:
    W. D. Romberg, Plant SuperinLandent
    R. Stotts, Plant Training Manager
    Senior Resident Inspector
    Pubite Document Room (PDR)
    Local Public Document Room (LPDR)
    Nuclear Safety Information Center (NSIC)
    State of Connecticut
          .
    cc w/ enclosure, w/o Attachments 1, 2, 3:                                                                i
    V. Pap'adopoli, Construction Quality Assurance Supervisor                                                l
    E. R. Foster, Director of Generation Construction
    E. J.'Mroczka, Vice President, Nuclear Operations
    D. O. Nordquist, Manager of Quality Assu-ance
    R. T. Laudenat, Manager, Generation Facilities Licensing
    bec w/o Attachments 1, 2, 3 to enclosure:
    DRP Section Chief
    Examiner
    Chief, OLB, DHFS, NRR
    OL File 12.0
    Region I Docket Room (w/ concurrences,
          Enclosure w/ Attachments 1 and 2)
l  Master Exam File
!
l
l
i
  ~
'
              .
                                    RI: )RP
                                    V  ter
    R :DRP          RI:DRP
                          y        1
                                    R
                                        >/85
                                        RP
                                                    Q
                                                  RI:DRP        RI:DRP
    DCoe/ca        DJohnson        R              EMcCabe        EWenginger
    10/3 0/85      ItbMF                /85      1$/(,/85      1$//f' /85
                    ll d
                              0FFICIAL RECORD COPY      OL ER MILL 85-44 - 0002.0.0
                                                        10/29/85
                                                                  - _ _ _ _ _ _ _ _ _ _ - - _ _ _ - _ _ _ .
}}
}}

Latest revision as of 04:02, 1 July 2020

Forwards Exam Rept 50-423/85-44(OL) of Exams Administered During Wks of 850902 & 07
ML20136D926
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/14/1985
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20136D930 List:
References
NUDOCS 8511210392
Download: ML20136D926 (2)


See also: IR 05000423/1985044

Text

c, '[I1

.

NOV 141985

Docket No. 50-423

i

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject: EXAMINATION REPORT NO. 50-423/85-44(0L)

This transmits the Examination Report of Operator Licensing Examinations

i conducted by USNRC Region I at the Millstone 3 Facility the weeks of

September 2, 1985, and September 9, 1985.

No reply to this letter is required. Your cooperation in this matter is

appreciated. ,}

Sincerely,

kihinal sicned sy,

Edward C. Wenzinger, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosure:

Examination Report No. 50-423/85-44(0L) w/ Attachments 1, 2, 3

h!k kDO

o

f

0FFICIAL RECORD COPY OL ER MILL 85-44 - 0001.0.0

11/12/85 IE 4/lL g

Northeast Nuclear Energy Co. 2

cc w/ enclosure and Attachments 1, 2, 3:

W. D. Romberg, Plant SuperinLandent

R. Stotts, Plant Training Manager

Senior Resident Inspector

Pubite Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

State of Connecticut

.

cc w/ enclosure, w/o Attachments 1, 2, 3: i

V. Pap'adopoli, Construction Quality Assurance Supervisor l

E. R. Foster, Director of Generation Construction

E. J.'Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assu-ance

R. T. Laudenat, Manager, Generation Facilities Licensing

bec w/o Attachments 1, 2, 3 to enclosure:

DRP Section Chief

Examiner

Chief, OLB, DHFS, NRR

OL File 12.0

Region I Docket Room (w/ concurrences,

Enclosure w/ Attachments 1 and 2)

l Master Exam File

!

l

l

i

~

'

.

RI: )RP

V ter

R :DRP RI:DRP

y 1

R

>/85

RP

Q

RI:DRP RI:DRP

DCoe/ca DJohnson R EMcCabe EWenginger

10/3 0/85 ItbMF /85 1$/(,/85 1$//f' /85

ll d

0FFICIAL RECORD COPY OL ER MILL 85-44 - 0002.0.0

10/29/85

- _ _ _ _ _ _ _ _ _ _ - - _ _ _ - _ _ _ .