ML14049A337: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML14049A337
| number = ML14049A337
| issue date = 02/18/2014
| issue date = 02/18/2014
| title = 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, And 50-328
| title = 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328
| author name = Bartley J H
| author name = Bartley J
| author affiliation = NRC/RGN-II/DRP/RPB6
| author affiliation = NRC/RGN-II/DRP/RPB6
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 13: Line 13:
| page count = 31
| page count = 31
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 18, 2014 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
==SUBJECT:==
PUBLIC MEETING
==SUMMARY==
FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328
==Dear Mr. Shea:==
This refers to the meeting conducted near the Sequoyah Nuclear Plant on February 4, 2014.
The meetings purpose was to conduct a regulatory performance meeting to discuss the results of the supplemental and follow-up inspections completed on December 13, 2013, and the status of NRCs performance assessment of Sequoyah Nuclear Plant, Units 1 and 2.
A list of attendees and a copy of the presentation handout are enclosed.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4607.
Sincerely,
                                              /Frank Ehrhardt RA for/
Jonathan H. Bartley, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79
==Enclosures:==
: 1. List of Attendees
: 2. NRC Meeting Slides
: 3. TVA Meeting Slides cc distribution via ListServ
___________                SUNSI REVIEW COMPLETE    FORM 665 ATTACHED OFFICE              RII:DRP        RII:DRP SIGNATURE          JDH /RA/        FJE /RA for/
NAME                  J. Hamman    J.Bartley DATE                  02/15/2014      02/18/2014 E-MAIL COPY?          YES    NO    YES      NO    YES  NO      YES  NO    YES    NO    YES    NO  YES  NO J. Shea                                  2 Letter to Joseph W. Shea from Jonathan Bartley dated February 18, 2014
==SUBJECT:==
PUBLIC MEETING
==SUMMARY==
FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328 Distribution:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource
NRC ATTENDEES W. Jones, Deputy Division Director, DRP, RII J. Bartley, Chief, Reactor Projects Branch 6, DRP, RII J. Heisserer, Senior Construction Inspector, RII W. Deschaine, Resident Inspector, Sequoyah Nuclear Plant Enclosure 1
                          }}

Latest revision as of 23:07, 5 February 2020

2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328
ML14049A337
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/18/2014
From: Bartley J
Reactor Projects Region 2 Branch 6
To: James Shea
Tennessee Valley Authority
References
Download: ML14049A337 (31)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 February 18, 2014 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328

Dear Mr. Shea:

This refers to the meeting conducted near the Sequoyah Nuclear Plant on February 4, 2014.

The meetings purpose was to conduct a regulatory performance meeting to discuss the results of the supplemental and follow-up inspections completed on December 13, 2013, and the status of NRCs performance assessment of Sequoyah Nuclear Plant, Units 1 and 2.

A list of attendees and a copy of the presentation handout are enclosed.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 997-4607.

Sincerely,

/Frank Ehrhardt RA for/

Jonathan H. Bartley, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79

Enclosures:

1. List of Attendees
2. NRC Meeting Slides
3. TVA Meeting Slides cc distribution via ListServ

___________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE JDH /RA/ FJE /RA for/

NAME J. Hamman J.Bartley DATE 02/15/2014 02/18/2014 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 2 Letter to Joseph W. Shea from Jonathan Bartley dated February 18, 2014

SUBJECT:

PUBLIC MEETING

SUMMARY

FOR SEQUOYAH NUCLEAR PLANT, DOCKET NO. 50-327, and 50-328 Distribution:

C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource

NRC ATTENDEES W. Jones, Deputy Division Director, DRP, RII J. Bartley, Chief, Reactor Projects Branch 6, DRP, RII J. Heisserer, Senior Construction Inspector, RII W. Deschaine, Resident Inspector, Sequoyah Nuclear Plant Enclosure 1