|
---|
Category:Meeting Summary
MONTHYEARML24008A1592024-01-18018 January 2024 Summary of December 13, 2023, Meeting with Tennessee Valley Authority Regarding a Proposed Change to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML23304A0682023-11-0606 November 2023 Summary of October 24, 2023, Public Mtg W/Tennessee Valley Authority Regarding Proposed License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2, and Sequoyah Nuclear Plant, Units 1 and 2 to Revise Function 5, Turbine Trip and F ML23142A2132023-05-22022 May 2023 Public Meeting Summary - 2022 Annual Assessment Meetings for Browns Ferry, Sequoyah and Watts Bar Nuclear Plants ML22312A3522022-12-0101 December 2022 Revised - Summary of Regulatory Audit for Alternative Request RV-02 ML22207B8302022-07-28028 July 2022 Summary of July 20, 2022, Observation Public Meeting with the Tennessee Valley Authority to Discuss Planned Alternative Request RP-12 to ASME OM Code Testing for the 1B-B Centrifugal Charging Pump at Sequoyah Nuclear Plant, Unit 1 ML22168A1642022-06-27027 June 2022 Summary of June 9, 2022, Meeting with TVA Regarding a Proposed License Amendment Request Related to Low Temperature Overpressure System and Cold Overpressure Mitigation System for Sequoyah and Watts Bar Nuclear Plants ML22109A0042022-04-20020 April 2022 Summary of Meeting with Tennessee Valley Authority Regarding a Proposed Alternative Request Related to Testing of the Motor-Driven Auxiliary Feedwater Pumps at Sequoyah and Watts Bar Nuclear Plants ML22108A1842022-04-18018 April 2022 TVA 2021 Annual Assessment Public Meeting Summary ML22048B7852022-03-0202 March 2022 Summary of February 16, 2022, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a Request for an Alternative to Requirements for Addressing Pressure Isolation Valve Leakage ML21313A3482021-11-18018 November 2021 Summary of Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Seismic and Fire Probabilistic Risk Assessment (PRA) Modifications to 10 CFR 50.69 ML21291A0092021-11-0303 November 2021 Tennessee Valley Authority Fleet - Summary of October 13, 2021, Teleconference with Tennessee Valley Authority to Discuss Planned License Amendment Requests Related to the Emergency Action Level Scheme ML21265A5142021-10-12012 October 2021 Summary of September 15, 2021, Public Preapplication Meeting with Tennessee Valley Authority Regarding a Future Submittal of a License Amendment Request Regarding Elimination of the High Negative Flux Rate Trip ML21218A1472021-08-11011 August 2021 August 5, 2021 N-769 Relief Pre-Submittal Meeting Summary ML21165A1482021-06-30030 June 2021 Summary of Closed Meeting with Tennessee Valley Authority to Discuss Planned Requests for Exemption from Certain Requirements of 10 CFR Part 37 ML21152A1252021-06-0202 June 2021 Summary of Verbal Authorization of Alternative Request RP-10 for the 1B-B Motor Driven Auxiliary Feedwater Pump ML21137A0022021-05-17017 May 2021 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plants, Docket Nos. 50-259, 50-260, 50-296, 50-327, 50-328, 50-390, and 50-391, Meeting Number 20210392 ML21112A3262021-04-30030 April 2021 Summary of April 21, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned License Amendment Request for Sequoyah Nuclear Plant, Units 1 and 2 ML21067A2132021-03-23023 March 2021 Summary of March 2, 2021, Teleconference with Tennessee Valley Authority to Discuss a Planned Alternative Request ML20357A0092021-01-19019 January 2021 Summary of December 17, 2020, Teleconference with Tennessee Valley Authority Regarding Planned License Amendment Request Related to Use of Alternate Probability of Detection at Watts Bar Nuclear Plant, Unit 2 ML20293A0802020-10-28028 October 2020 Summary of October 13, 2020, Closed Meeting with TVA on Responses to Requests for Additional Information Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20175A8012020-08-11011 August 2020 Summary of June 23, 2020, Public Meeting with Tennessee Valley Authority to Discuss a Planned License Amendment ML20203M2292020-08-11011 August 2020 July 16, 2020, Summary of Partially Closed Meeting with Tennessee Valley Authority to Discuss Responses to Requests for Additional Information Regarding Updated Final Safety Analysis Report Hydrologic Analysis License Amendment Request ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20108E9092020-06-22022 June 2020 Summary of April 16, 2020, Virtual Meeting with Tennessee Valley Authority to Discuss Submittal of an Exigent License Amendment Request Operate One Cycle with One Control Rod Removed ML20127H8412020-05-0606 May 2020 Public Meeting Summary - Browns Ferry, Sequoyah and Watts Bar Nuclear Plant, Meeting No. 20200384 ML20055C2312020-03-0505 March 2020 Summary of February 20, 2020 Pre-submittal Meeting - Operation Without Control Rod H8 and Fuel Transition ML20035C8192020-02-12012 February 2020 Summary of January 27, 2020, Public Meeting with Tennessee Valley Authority Regarding the Future Submittal of Steam Generator Tube Inspection Related License Amendment Request ML19325C7142019-12-0202 December 2019 November 15,2019, Summary of Conference Call with Tennessee Valley Authority to Discuss Submittal of Exigent License Request (EPID L-2019-LLA-0239) for Sequoyah Nuclear Plant, Unit 1 ML19142A2772019-05-21021 May 2019 Summary of Public Meeting - Sequoyah Nuclear Plant ML19038A4692019-02-28028 February 2019 Summary of January 31, 2019 Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - ML18344A5672019-01-15015 January 2019 November 14, 2018, Summary of Public Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - Sequoyah Nuclear Plant, Units 1 and 2 ML18164A3092018-06-13013 June 2018 June 6, 2018 Summary of Public Meeting - Sequoyah Nuclear Plant - Docket Nos. 50-327 and 50-328 ML17278A8972017-10-17017 October 2017 Summary of Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry, Units 1, 2, and 3, Sequoyah Nuclear, Units 1 and 2 and Watts Bar Nuclear Plant, Units 1 and 2(EPID L2016-TOP-0011; CAC Nos. MF8391-MF8397 ML17227A5142017-09-0101 September 2017 Summary of August 1, 2017, Pre-Submittal Public Meeting with TVA Regarding a Class 1E Unbalanced Voltage Relay Licensing Amendment Request for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant ML16280A2912016-10-31031 October 2016 September 23, 2016, Summary of Public Meeting with TVA Regarding Hydrology-Related Licensing Actions, Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 & 2 and Watts Bar Nuclear Plant, Units 1 & 2 (CAC Nos. MF83 ML16117A5512016-05-0202 May 2016 04/01/2016 Sequoyah Nuclear Plant, Units 1 and 2 - Summary Of Public Meeting With TVA Regarding Hydrology-Related Licensing Actions (CAC Nos. ME9238 And ME9239) ML16035A4802016-02-12012 February 2016 Jsc Meeting Summary Attachment ML16029A3512016-02-0505 February 2016 Summary of January 19, 2016, Pre-Submittal Meeting with Tennessee Valley Authority Regarding Technical Specifications for Sequoyah Nuclear Plant, Units 1 and 2 ML15238A3422015-09-22022 September 2015 July 22, 2015 Summary of Telecon Between NRC and TVA, Concerning RAI Set 25 Pertaining to SQN, Units 1 and 2 License Renewal Application ML15233A0352015-09-22022 September 2015 July 20, 2015, Summary of Telephone Conference Call Held Between NRC and TVA Concerning RAI, Set 25 Pertaining to the Sequoyah Units 1 and 2 License Renewal Application (TAC Nos. MF0481 and MF0482) ML15236A0672015-09-0909 September 2015 August 20, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and TVA ML15152A0312015-06-23023 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. NRC and TVA, Concerning RAI, Set 24 Pertaining to the Sequoyah Nuclear Plant License Renewal Application ML15106A5462015-04-15015 April 2015 Meeting Summary with Public to Discuss Annual Assessment of Sequoyah Nuclear Plant, Unit 1 & 2, in Soddy Daisy, Tn ML15037A1732015-02-13013 February 2015 Summary of January 15, 2015, Meeting with Tennessee Valley Authority Regarding Improved Technical Specifications Conversion for Sequoyah Nuclear Plant, Units 1 and 2 ML14204A2672014-08-15015 August 2014 Summary of July 10, 2014, Meeting Between the Tennessee Valley Authority and the Nuclear Regulatory Commission to Discuss Near-Term Task Force Recommendation 2.1 Flooding Hazard Reevaluation Report and Improved Mitigation System Quarterly U ML14197A6082014-08-0606 August 2014 July 1, 2014, Summary of Category 1 Public Meeting with Tennessee Valley Authority to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14174A7372014-07-30030 July 2014 June 19, 2014, Summary of Telephone Conference Call Held Between NRC and Tennessee Valley Authority, Concerning Requests for Additional Information Pertaining to the Sequoyah, Units 1 & 2, License Renewal Application ML14107A3352014-04-16016 April 2014 Summary of Meeting with Tennessee Valley Authority to Discuss Nrc'S Reactor Oversight Process (ROP) and Nrc'S Annual Assessment of Plant Safety Performance for Period of January 1, 2013, to December 31, 2013 for Sequoyah Bar Nuclear Plant ML14090A4582014-03-31031 March 2014 Public Meeting Summary TVA Synergy Safety Culture Survey Results ML14049A3372014-02-18018 February 2014 2/4/2014 - Summary of Public Meeting for Sequoyah Nuclear Plant, Docket No. 50-327, and 50-328 2024-01-18
[Table view] |
Text
March 2, 2022 LICENSEE: Tennessee Valley Authority FACILITY: Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF FEBRUARY 16, 2022, PUBLIC PREAPPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A FUTURE SUBMITTAL OF A REQUEST FOR AN ALTERNATIVE TO REQUIREMENTS FOR ADDRESSING PRESSURE ISOLATION VALVE LEAKAGE (EPID L-2022-LRM-0110)
On February 16, 2022, the U.S. Nuclear Regulatory Commission (NRC) staff held a virtual public meeting with representatives from Tennessee Valley Authority (TVA). The purpose of the meeting was to discuss the licensees plans to submit a request for an alternative for the Sequoyah Nuclear Plant, Units 1 and 2 (Sequoyah), to the requirements of American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code, Subsection ISTC-3630, related to Pressure Isolation Valve (PIV) leakage. The meeting notice and agenda, dated February 4, 2022, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML22035A090. A list of attendees is provided in the enclosure.
During the meeting, the licensee presented information (ADAMS Accession No. ML22046A293) regarding the future request which included information about the types of PIVs the future request would be applicable to, past experience with addressing PIV leakage, the specifics of the future alternative request and the expected requests need date.
In response to the TVA presentation, the NRC staff discussed with TVA the following observations and elements that would help ensure a comprehensive submittal and efficient NRC staff review:
The OM code provides a formula to determine what a leak rate would be at a higher pressure if a leak rate test is performed at a lower pressure.
Lower test pressure often cannot seat valves.
Since there seems to be no change needed to the Technical Specifications (TS) or Surveillance Requirement (SR) related to this alternative request, a TS Task Force (TSTF) type of remedy would not be appropriate.
A discussion of whether this request impacts the associated TS or SR, or any interpretation of whether the SR is met, would allow staff to determine if TVA is essentially asking for a relaxation only in OM Code space.
The issue regarding the definition of TS operability versus OM code operability has been addressed to the OM code committee, but any resultant code committee action would not support the need date TVA is requesting for this alternative request.
Recent events at Prairie Island Nuclear Generating Plant and Turkey Point Nuclear Generating Station have heightened TVAs awareness of this issue in addition to recent
similar experience during the last Sequoyah Unit 1 outage. This is driving the need for this alternative being ready for the Sequoyah Unit 1 fall 2022 outage.
Mechanical PIV valve agitation to better seat the PIV is not permitted under the OM code.
Failed PIVs are tested for leakage flow rate to assess performance.
Information on how PIVs are tested each outage would be helpful.
Including a high-level discussion of the maintenance history for the PIVs to which the alternative request applies would be helpful.
Include a description of how TVA performs condition monitoring of the valves during operation.
Provide a description of typical mechanical agitation methods for various sizes of valves (2 inch through 10 inch) that may be used if a PIV fails its leak rate test.
Provide a statement that TVA evaluated the design of each check valve to demonstrate that if a valve initially fails leak testing and the alternative is applied there is no potential of disc separation/failure that would impede flow if the valve has to open during an accident.
The NRC staff did not make any regulatory decisions or commitments at the meeting. There were no members of the public in attendance.
Please direct any inquiries to me at 301-415-1383 or by e-mail to Perry.Buckberg@nrc.gov.
/RA/
Perry H. Buckberg, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos.: 50-327, 50-328
Enclosure:
List of Attendees cc: Listserv
LIST OF ATTENDEES FEBRUARY 16, 2022, VIRTUAL PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY, ET AL.
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 PRE-APPLICATION MEETING REGARDING ALTERNATIVE TO REQUIRMENTS FOR ADDRESSING PRESSURE ISOLATION VALVLE LEAKAGE U.S. Nuclear Regulatory Commission Perry Buckberg, NRR1 /DORL2 /LPLII-23 Ian Tseng NRR/DEX4 /EMIB5 Gurgendra Bedi, NRR/DEX/EMIB Matthew Hamm, NRR/DSS6 / STSB7 Steve Smith, NRR/DSS/STSB Tennessee Valley Authority Tracy Sudoko Marlin Quarberg Stuart Rymer Mark Gowin Charles Driskell Russell Wells Robert Smith Earl Ridgell Andrew Taylor Duke Dang Andy McNeil 1
Office of Nuclear Reactor Regulation 2
Division of Operating Reactor Licensing 3
Plant Licensing Branch II-2 4
Division Engineering and External Hazards 5
Mechanical Engineering & Inservice Testing Branch 6
Division of Safety Systems 7
Technical Specifications Branch Enclosure
ML22046A295 (Package)
ML22048B785 (Summary)
ML22046A293 (Presentation)
ML22035A090 (Meeting Notice)
OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DSS/STSB/BC NRR/DEX/EMIB/BC NAME PBuckberg RButler VCusumano ITseng DATE 3/1/2022 2/28/2022 3/1/2022 3/1/2022 OFFICE NRR/DORL/LPL2-2/BC NRR/DORL/LPL2-2/PM NAME DWrona PBuckberg DATE 3/2/2022 3/2/2022